Background
Ideas of Obstacle Driven Development (ODD) are based on numerous development processes including:
• ISO V-model
• Test Driven Development
• ISO specifications
• Requirements analysis spiral
• Agile principles
31/10/2014 ©odd.enterprises 5
Testing in History
Testing has been implemented on certain products for many years.
• Armour which was designed to be bullet proof would be tested
• Non standard components required this approach
31/10/2014 ©odd.enterprises 6
Test Driven Development
When using TDD there comes a very important and difficult stage of writing tests.
Obstacle Driven Development is used to help define tests and extend TDD principles.
Development of ODD began with the question
• Where do the tests come from?
31/10/2014 ©odd.enterprises 7
Write Test
Write Code
Refactor
Behaviour Driven Development 1
• Behaviour driven development has been described as “TDD done right”
• Suggests that behaviours should influence the testing and design process
• ODD is effectively a reordered and extended version of this process applied to all development stages
31/10/2014 ©odd.enterprises 8
Write Test
Write Code
Refactor
Think
Behaviour Driven Development 2
Reordering the BDD sequence gives a sequence similar to traffic lights
• Red light now used for unverified and unvalidated processes
• Amber light now used when tests are created and code written
• Green light used when the tests have been passed
31/10/2014 ©odd.enterprises 9
Write Test
Write Code
Validate / Refactor
Behaviour
Obstacle Driven Development 1
If tests are used to verify and validate code then the principle can be extended and adapted to create a new development model.
• Applications to hardware, software and embedded
• Links the stages with tests used for verification and validation
31/10/2014 ©odd.enterprises 10
Verify Solution
Solution for Obstacle
ValidateSolution
Obstacle
Obstacle Driven Development 2
Obstacle Driven Development is used to find solutions to obstacles.
An obstacle is broken into four stages of development when using ODD.
• Analysis
• Specification
• Solution
• Production
31/10/2014 ©odd.enterprises 11
Verify Solution
Solution for Obstacle
ValidateSolution
Obstacle
Obstacle Driven Development 3
Verification and validation processes for the stages.
• Specification
– Verification and validation
• Solution
– Testing and design
• Production
– Quality assurance and control
• Analysis
– Utilisation and elicitation 31/10/2014 ©odd.enterprises 12
ODD Solution 1
Using a specification allows the creation of tests based on the described behaviours.
• If a solution is designed to pass tests from the outset then testing becomes easier
• Solution is used to describe the individual and integrated designs
31/10/2014 ©odd.enterprises 13
Create Test
Design Solution
PassTest
Specification
ODD Solution 2
ODD Solution is intended to be generic and used for software, hardware and embedded design.
• Red light now used for unverified and unvalidated specification
• Amber light now used when tests are created and solution created
• Green light used when the tests have been passed
31/10/2014 ©odd.enterprises 14
Create Test
Design Solution
PassTest
Specification
ODD Specification 1
A specification which is described directly from expected situations allows full coverage
• Tests are used to verify and validate described behaviours cover situations
• Once all expected situations are covered and tests verified then the solution can be created confidently
31/10/2014 ©odd.enterprises 15
Verify Specification
DescribeSpecification
Validate Specification
Situation
ODD Specification 2
ODD Specification is extended into a separate stage intended to be a full description of behaviours.
• Unit tests applied to a specification allow cross examination of behaviours
• Important to create a full specification to allow detection of errors at an early stage
31/10/2014 ©odd.enterprises 16
Verify Specification
DescribeSpecification
Validate Specification
Situation
ODD Specification 3
Adaption of ODD gives a sequence which follows
• Red light used for unverified and unvalidated behaviour for a situation
• Amber light used when verification tests are created and behaviour specified
• Green light used when the behaviour has been validated
31/10/2014 ©odd.enterprises 17
Verify Specification
DescribeSpecification
Validate Specification
Situation
ODD Production 1
A production process which is organised directly from the solution can have assured and controlled quality.
• Solution is used to ensure continuous and predictable quality
• Quality assurance tests are created with passes a measure of quality control
31/10/2014 ©odd.enterprises 18
Assure Product Quality
ProduceProduct
Control ProductQuality
Solution
ODD Production 2
A solution is required to have production assured and controlled.
• Red light used for no quality assurance and control
• Amber light used when tests for assuring product quality and production are created
• Green light used when quality control is passed
31/10/2014 ©odd.enterprises 19
Assure Product Quality
ProduceProduct
Control ProductQuality
Solution
ODD Analysis 1
Once a product, and by extension the production process, has been created then utilisation is used to verify the product.
• Once the product is utilised in situations then elicitation can proceed as validation
• Process used to link the stages to allow continuous improvement and adaption
31/10/2014 ©odd.enterprises 20
CustomerUtilisation
Situation Analysis
ElicitCustomers
Product
ODD Analysis 2
Analysis may be performed to give feedback on the success of the product.
• Red light used for no utilisation and elicitation of product
• Amber light used when tests for customer utilisation are created
• Green light used when tests for customer elicitation are passed
31/10/2014 ©odd.enterprises 21
CustomerUtilisation
Situation Analysis
ElicitCustomers
Product
ODD Process 1
A traffic light system has been developed. The lights have been arranged to demonstrate how one stage links the next.
• Each stage is began with a red light.
• Amber lights are obtained when tests are created for next stage
• Green light is for when tests are passed and next stage linked
31/10/2014 ©odd.enterprises 22
ODD Process 2
Each part of analysis, specification, solution and production will have tests.
• Each process begins as unverified and unvalidated
• Tests are created to verify a process
• Tests are passed to verify and validate the process
31/10/2014 ©odd.enterprises 23
Testing Procedure
Unit testing is used and extended throughout the ODD testing procedure.
• Each stage and test is assigned a red light to begin
• Amber lights are obtained when tests are created for next stage
• Green light is for when tests are passed and next stage linked
31/10/2014 ©odd.enterprises 24
Unit Testing 1
Unit tests are used in order to facilitate the testing process.
• Every stage is tested
• Each test has a single result
• Unit tests can be combined to give complex testing processes
• Green light is for when tests are passed and next stage linked
31/10/2014 ©odd.enterprises 25
Unit Testing 2
• Analysis of situations
– Create a test to ensure a situation is covered by a behaviour
– Pass the test ensuring a behaviour covers the situation
• Specification of behaviours
– Create a test to ensure a behaviour is implemented by solution
– Pass a test ensuring a behaviour is implemented by solution
31/10/2014 ©odd.enterprises 26
Unit Testing 3
• Creation of solution
– Create a test to ensure a solution is created by production
– Pass the test ensuring a solution is created by production
• Production of product
– Create a test to ensure a product is utilised in a situation
– Pass a test ensuring a product is elicited in a situation
31/10/2014 ©odd.enterprises 27
Linking Tests 1
• Situation A is analysed
– Tests created to verify and validate Behaviour A
• Behaviour A covers Situation A
– Tests created to verify and validate the testing and design of Solution A
31/10/2014 ©odd.enterprises 28
Linking Tests 2
• Solution A implements Behaviour A
– Tests created to verify and validate the quality assurance and control of Production A
• Production A implements Solution A
– Tests created to verify and validate the utilisation and elicitation of product in Situation A
31/10/2014 ©odd.enterprises 29
ODD Process Model
31/10/2014 ©odd.enterprises 30
ODD Traffic Model
31/10/2014 ©odd.enterprises 31
Legal Stuff
ReferencesTest Driven Development
http://en.wikipedia.org/wiki/Test-driven_development
Behaviour Driven Development
http://en.wikipedia.org/wiki/Behavior-driven_development
Unit Testing
http://en.wikipedia.org/wiki/Unit_testing
DisclaimerThe ODD M-model and associated processes are provided by odd.enterprises and may be used for any purpose whatsoever.
The names odd.enterprises and associated logos should not be used in any representation, advertising, publicity or other manner whatsoever to endorse or promote any entity that adopts or uses the model and/or associated processes.
odd.enterprises does not guarantee to provide support, consulting, training or assistance of any kind with regards to the use of the model and/or processes including any updates.
You agree to indemnify odd.enterprises and its affiliates, officers, agents and employees against any claim or demand including reasonable solicitors fees, related to your use, reliance or adoption of the model and/or processes for any purpose whatsoever.
The model is provided by odd.enterprises “as is” and any express or implied warranties, included but not limited to the implied warranties of merchantability and fitness for a particular purpose are expressly disclaimed.
In no event shall odd.enterprises be liable for any damages whatsoever, including but not limited to claims associated with the loss of data or profits, which may result from any action in contract, negligence or other tortious claim that arises out of or in connection with the use or performance of the model.
31/10/2014 ©odd.enterprises 32