Offshore Wind Farm Installation - braemaradjusting.comA Part of Braemar Technical Services...

Post on 30-Jan-2018

217 views 0 download

transcript

A Part of Braemar Technical Services Incorporating:

Offshore Wind Farm Installation

A Risky Business?

A Part of Braemar Technical Services Incorporating:

Crown Estates - Round 2 Sites

A Part of Braemar Technical Services Incorporating:

Thanet Details and Location

A Part of Braemar Technical Services Incorporating:

Onshore Substation Richborough

A Part of Braemar Technical Services Incorporating:

Onshore Export Cable Works

A Part of Braemar Technical Services Incorporating:

Ramsgate Base for Offshore Operations

A Part of Braemar Technical Services Incorporating:

Turbine Foundations Fabrication

A Part of Braemar Technical Services Incorporating:

“Sea Jack” – Monopile Installation

A Part of Braemar Technical Services Incorporating:

Monopiles Installed

A Part of Braemar Technical Services Incorporating:

Transition Piece in Fabrication Yard

A Part of Braemar Technical Services Incorporating:

Sea Jack –Monopile/TP Installation

A Part of Braemar Technical Services Incorporating:

Monopile and Transition Piece

A Part of Braemar Technical Services Incorporating:

Polar Prince - Cable Lay

A Part of Braemar Technical Services Incorporating:

Normand Mermaid – Cable Lay

A Part of Braemar Technical Services Incorporating:

UR101 – Export Cable Lay

A Part of Braemar Technical Services Incorporating:

Subsea Cable Plough

A Part of Braemar Technical Services Incorporating:

“Stanislav Yudin” – Offshore Substation Installation

A Part of Braemar Technical Services Incorporating:

Offshore Substation Installation

A Part of Braemar Technical Services Incorporating:

“Excalibur” Offshore Substation Hook-up

A Part of Braemar Technical Services Incorporating:

11th April 2009 Marine Mammal Observation

A Part of Braemar Technical Services Incorporating:

“Resolution” - Installation of WTGs

A Part of Braemar Technical Services Incorporating:

“Resolution” - Installation of WTGs

A Part of Braemar Technical Services Incorporating:

Thanet Offshore Wind Farm

A Part of Braemar Technical Services Incorporating:

Offshore Wind Round 3

A Part of Braemar Technical Services Incorporating:

It’s a Large Infrastructure - 60 Thanets by 2020

A Part of Braemar Technical Services Incorporating:

2012 Carbon Trust - Quote

Our Offshore Wind Accelerator programme is taking the best new designs for offshore wind turbine foundations from design through research and development to deployment.

They have the potential to reduce the total cost of foundations in a wind farm by as much as 30%.

A Part of Braemar Technical Services Incorporating:

Grouted Connections

“Roughly 600 of Europe’s installed 948 offshore turbines have been prone to grout connection failure, causing turbines to tilt within their monopile foundations”

A Part of Braemar Technical Services Incorporating:

Monopile Substructures

A Part of Braemar Technical Services Incorporating:

Tripod Substructures

A Part of Braemar Technical Services Incorporating:

Jacket Substructures

A Part of Braemar Technical Services Incorporating:

Large Heavy Lift Vessels

A Part of Braemar Technical Services Incorporating:

The Smaller Installation Vessels

A Part of Braemar Technical Services Incorporating:

Self Installing Solutions

A Part of Braemar Technical Services Incorporating:

Getting it Wrong!

A Part of Braemar Technical Services Incorporating:

Thanet Development Schedule July 2005

Developer/Investor commenced engineering

September 2007

Investor acquired Thanet Offshore Wind (TOW)

November 2008

Vattenfall Wind Power acquired TOW

A Part of Braemar Technical Services Incorporating:

Conclusions

Plan Well and Plan Early

Recognise Project Status

Effective Project Management

Identify and Manage Risk

A Part of Braemar Technical Services Incorporating:

Offshore Wind Farm Installation

A Risky Business?

Thank you for your attention