On year of Lean IT at Auchan:Direct by Bastien Duret, CTO

Post on 11-Apr-2017

98 views 0 download

transcript

1

Lean @Auchan:Direct

Bastien Duret

2

1. Auchan:Direct ?

2. Looking back

3. Looking forward

3

1. Auchan:Direct ?

2. Looking back

3. Looking forward

Which problem do we solve ?

4

Shop online Get delivered the next day

5

1. Auchan:Direct ?

2. Looking back

3. Looking forward

Situation

• Low customer satisfaction

• Inability to change

• Rising competition

6

Target

Great user experience

7

High-performing empowered teams

An early struggle

September 2015

8

Plan : have the CEO place an order on October 27th

Showing the product to the client

9

Old website

Existinginformation system

New warehouse

New website

Enabler

Building the right product

10

Direct client feedback Categorized and ordered

Building the product right (1/2)

11

Annoyed customerShipped feature

Building the product right (2/2)

12

Really angry customerShipped feature

Building the product fast (1/2)

• Proprietary framework

• Software consulting firm

13

• Tailor-made software

• In-house software engineers

0

5

10

15

20

25

30

HybrisBurndownChart

0

1

2

3

4

5

6

7

8

9

10

PyhtonBurndownChart

Building the product fast (2/2)

14

Design => Dev => Done

A temporary victory

First order

15

Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb

Official releaseBeta version

16

1. Auchan:Direct ?

2. Looking back

3. Looking forward

Scaling lean

17

18

Questions ?