OPEN ACCES IN INTER-STATE TRANSMISSION

Post on 30-Jan-2016

38 views 0 download

Tags:

description

OPEN ACCES IN INTER-STATE TRANSMISSION. Salient Features of CERC Order / Regulations. Open Access customers categorized : Short-Term STOA - Upto Three Months. Medium –TermMTO - 3 months - Three years Long-Term LTOA - 12- 25 years - PowerPoint PPT Presentation

transcript

Salient Features of CERC Order / Regulations

Open Access customers categorized :

Short-Term STOA - Upto Three Months.Medium –Term MTO - 3 months - Three

yearsLong-Term LTOA - 12- 25 years

All Open Access customers to abide by Indian Electricity Grid Code.

INTRODUCTION Open Access is necessary for utilisation of short

time surpluses. Open Access will create options for distribution

companies to buy power. Open Access will create opportunities for

Generators to sell power. Open Access will provide means to the

traders/buyers/sellers.

Agencies involved in Open Access Transaction

RLDC (s) SLDC (s) CTU STU (s) Buyer Seller Trader

seller

Trader

Buyer

Trader

Region 2

Region 1

RLDC

Nodal RLDC

Applicat

ion

(Rs.500

0/-)Req for Consent

SLDC2

SLDC1

Trader

Region 2Region 1

RLDC

Nodal RLDC

SLDC1

SLDC2

Consent

Consent

Consent

Trader

Region 2Region 1

RLDC

Nodal RLDC

SLDC1

SLDC2

Acceptance for scheduling

Trader

Region 2Region 1

RLDC

Nodal RLDC

SLDC1

SLDC2S

toa charges

Trader

RLDCNodal RLDC

SLDC1 SLDC2

Scheduling of power

Period of transaction FROM Date TO Date

TRADER /APPLICANT Name

INJECTING Utility

DRAWEE Utility

Application No. & Date

TIME duration

Applied ROUTE

Quantity

Intervening States/ Region

Type of Application (ADV/FCFS/SD/DA)

SR

ER

KSEB

RGCCPP

WBSEB

TNEB

INTR

A

WR

MPSEB

IMPO

RT

EXPO

RT

WHEELING

STOA TRANSACTIONS

SRTS

ERTS

KSEB

WBSEB

RGCCPP

TNEB

WRTS

MPSEB

STOA CHARGES

(up to Jun’11)

RLDC

RLDC

RLDC

SLDC

SLDC

CTU

STU

ERTS

WRTS

POC Charges

RLDC

NRTS

SRTS

KSEB

MPSEB

RLDC

AP

J&k

RLDC

WB

ER

WR

POC Charges

NR

SR

KSEB

MPSEB

AP

J&k

WB

1OOMW

1OOMW

1OOMW

1OOMW

1OOMW

WB

SR HVDC BACK TO BACK AT GAZUWAKA IN SR

ER

NR

WR

RAJASTHAN

AJMER

HVDC BACK TO BACK AT BHADRWATHI IN WR

HVDC BACK TO BACK AT VINDHYACHAL IN WR

Import of APTRANSCO from various RegionsImport of APTRANSCO from various Regions

DVC

POC CHARGES (Rs/MWH)

Inj. Withdrawal

RAJASTAN 100 150

DVC 140 100

CSPTCL 140 100

KERALA 110 110

APTRANSCO 150 110

WB

APTRANSCO SR

ER

NR

CSPTCL-WR

RAJASTHAN NR

POC charges for Import by Aptransco from various locations

DVC ER

KE

RA

LA

WR

SR

POC

POC losses (Zonal) applicable

RAJASTAN 1.03%

DVC 1.20%

CSPTCL 2.20%

KERALA 2.00%

APTRANSCO 2.30%

WB

APTRANSCO SR

ER

NR

CSPTCL-WR

RAJASTHAN NR

POC Transmission Losses for the Import by Aptransco

DVC ER

KE

RA

LA

WR

SR

POC charges..\nrc

2.72%

2.40%3.80%

4.6%

POC / STOA CHARGES(Rs)

RAJASTAN 15120000 / 21711800

DVC 18000000 / 30351800

CSPTCL 18000000 / 44031800

KERALA 15840000 / 22311800

WB

APTRANSCO SR

ER

NR

CSPTCL-WR

RAJASTHAN NR

Import of 100MW by Aptransco

DVC ER

KE

RA

LA

WR

SR

POC/ STOA charges..\nrc

2.72%

2.40%3.80%

4.6%