Post on 13-Aug-2015
transcript
Successful project management consists of
2Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
3 factors
5Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
And results that provide project insight
For complex industries these results provide guidance for future planning
6Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
Revenue increase and cost reductions are intrinsic for…
7Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
9
How do you know if your project management tool is effective?
Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
10Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
The ability to manage cost and risk in the field is vital.
13Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
So the right decision is made at the right time.
What is this real time data insight called?
14Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
15Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
We call this the Benefit Metrics
It means execution with efficiency
17Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
44% REDUCTION in project delays
Real results that can be used as a benchmark
18Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
20% REDUCTION in cost over-run
From project delivery to staff optimization
19Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
20Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
Effective project
management is done
with an effective team
10Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
The Benefit Metrics has shown this to be true.
23Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
12% INCREASE in Effective Executive Management
22
Construction and engineering industries are goal-oriented
Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
25Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
Results
driven
with project
delivery.
27Copyright © 2015 Oracle and/or its affiliates. All rights reserved.
And reduced project risk is an achievement.
Discover how to achieve this and much more with Oracle’s EPPM.
Visit: http://www.oracle.com/goto/CCBrief
28Copyright © 2015 Oracle and/or its affiliates. All rights reserved.