Oslo bridge pranali

Post on 17-Jan-2015

187 views 0 download

Tags:

description

 

transcript

 Oslo Leonardo Bridge, Norway

Vebjørn Sand

• Bridge site: Oslo, Norway• Type of Bridge: Footbridge• Total length: 109.2 m• Main span: 40.0 m• Vertical clearance above road: 5.70 m• Year of construction: 2001

• Structural system: One vertical and two tilted arches with fixed ends at the abutments and interconnected at the apex

• Material quantities: 90 m3 of glulam timber (Gl 36c), whereof about half the amount in the centre arch after having ground off about 40 m3. 120 m3 glulam timber in the stress laminated bridge deck