What type of construction process are we talking about ?Why is this a hot topic? What are the considerations to adoption?What are the critical success factors?
Rusty Williams, Business DevelopmentTriumph Modular Inc.
CRITICAL SUCCESS FACTORS FOR MODULAR CONSTRUCTION
Prefab is an Umbrella Term
= Prefabrication= Factory-built= Off-site Construction
Tiny Houses
Stackable Modular
Containers Kit
Panelized
They’re all“prefab”
10
What Triumph Does Best
Volumetric Modular 6 sided building blocks
Built Off-Site in a controlled manufacturing environment.
Near-Complete: typically over 65% complete.
Accelerated: Most accelerated process known, with the promise of no sacrifice to quality or design.
11
Click to play time-lapse video of MIT modular assembly
15
21st Century BuildingsNeed to be Designed with Change in Mind
Modular is FlexibleConstruction
Image by Victor Enrich.
FastWithout sacrifices to design or quality66% projects reporting 35% to 50% fasterthan conventional
Modular Allows For Concurrent Processes
19
Cases from the Off-Site Studies Report demonstrate an average of 16% cost savings compared to traditional construction.
Greater control of cost Reduction in change orders “8% cost overruns over multiple projects
over a four year period due to Change Orders.”
Predictable Cost
“The reason for choosing off-site construction is not simply in cost efficiency, but in precision of the construction and ability to control and predict cost.” (NIBS Off Site 2014)
Safer
According to the Safety Management in the Construction Industry SmartMarket Report, "Firms using prefabrication … have significantly higher adoption levels of nearly all the safety practices measured in the survey.”
22
Changing Perception
Muhlenberg College - Photo by NRB Inc.
Modular addition
Existing Student Residence
Modular is on-par with existing buildings.
Designed to Fit Together
Computing = Application Programming Interface
Modular = Architecturally Planned Interface
Working Within Limitations
Transport restrictions limit module size. Less plenum space. Larger beams needed to create clearspans
reduce ceiling height.
27
Critical Success Factors
Commit to the concept early, owner and consults Speed requires intense coordination - Design build
or construction management forms of contracting Team member roles clearly understood, designer,
factory, engineers. Subcontractor Scopes of Work clear Architect works in close coordination with modular
expert -pull subs up into design process
29
Fabricator Selection
Factory vs Field
Transportation
Permitting and Regulatory
Other important considerations: