Overview of theNEK Equipment QualificationPrograms

30’

ABOUTNEK

NEKEQprograms,UJVRež,2019

Slide02/27

• Owners: GENEnergija 50%HEP50%• Operator: NEK• NSSSSupplier: Westinghouse• ReactorType: PWR• ConstructionPermit: 1975• CommercialOperation: 1983• OperatingLicence: 40‐60years• GrossPlantOutput: 727MW

ABOUTNEK

NEKEQprograms,UJVRež,2019

Slide03/27

HE(HydroPower)=4.293GWh

TE(FossilPower)=4.400GWh

NEK=5.423GWh*

Total =14116GWh

NEK shareinSlovenia inproductionofelectricalenergy

Source:ELES,MonthlyReportonthePowerSystemforDecemberandyear2016,January2017

NEK38,4 %

TE 31,2 %

HE 30,4 %

NEKEQPROGRAMSHISTORICALBACKGROUNDANDDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide04/27

Construction designrequirements:

• EnvironmentalQualificationofElectricalandI&C(EQ)ReactorBuildingDBAequipmentshallbequalifiedtoIEEE323‐1971andIEEE323‐1974–NOFORMALPROGRAM

• SeismicDesign– SeismicCategoryImechanicalandelectricalequipmentfortheKRSKONuclearPowerPlantshallmeetseismicperformancerequirementsduringandfollowingtheOPERATINGBASIS EARTHQUAKE(OBE),SAFESHUTDOWNEARTHQUAKE(SSE)

ReactorBuilding(RB) Intermediate

and TurbineBuilding(IB,TB)

AuxiliaryBuilding(AB) EQ

NEKEQPROGRAMSHISTORICALBACKGROUNDANDDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide05/27

NEKEnvironmental Qualification programfor Electrical and I&Cequipment:

‐ FirstPeriodic Safety Review (PSR1)– 2005actionplan

‐ Slovenian Nuclear Regualtory Body ruleJV5 „Rulesonradiationandnuclearsafetyfactors“

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide06/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

NEKEQProgramdocument:

1. ED‐12consistentwith10CFR50.49

2. ED‐12definesmethodologyandcriteriaforEQconditionsdetermination(EQzones)

3. ED‐12methodologyandcriteriaforEQMELinEQSELlists

4. Programdefinesqualificationprocess:• Methodsforqualificationand

documentation• Processcontrol(designchanges,

maintenance,purchasing)

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide07/27

NEKEQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EnvironmentalconditionsduringandafterDBA:• LOCA• MSLB(MainSteamLineBreak)• HELB(HighEnergyLineBreaks):T>93.30Corp>2.0MPa

(forexampleCVCSletdown,SGBD)

Analyses:• T/H:RB,IB,AB:T,pandRH• DoseratesandTIDs:RB,AB(forexampleRHsump

recirculation),IB

Harshconditionssignificantlymoreseverethannormaloperatingconditions:

• Temperature:8,30C(150F)abovenormal/designT

• Pressure:10%abovenormal/design(10kPa– 1,47psi)

• RH:100%RHwithcondensation

• ChemicalSpray‐ exposure

• Submergence– exposure

• RadiationTID>100Gy;>10Gyforelectronics

NEKDBAEQconditions:

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide8/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQZoneMapsdocument

• EQconditionsdefinedforeveryevaluatedroom:

• DefinedHarsh/MildlocationsendcorrespondingenvelopingEQzone:

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide9/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQequipmentlist

EQMasterEquipmentList(EQMEL)components:• ElectricalandI&Cequipment:

• Safety‐related;• Non‐safety‐relatedthataffectssafety‐

related;• Certainpost‐accidentmonitoring(RG1.97

Category1in2)• LocatedinHarshenvironmentandperformDBA

safetyfunction

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide10/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQMELequipmentlist(typical):

‐Pumpselectricmotors,‐VAfancoolerselectricmotors‐MOVs‐Limitswitches‐Electricalpenetrations‐Pressuretransmitters(LT,PT,FT)‐RTDs,TCs‐Pressureswitches‐RMdetectors/monitors‐Solenoidvalves‐MCCDs‐H2recombiners (replacedwithPARs)‐Transformers,‐Selectorswitches

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide11/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQSupportingEquipmentList(EQSEL)– entirefunctionalloopshallbequalified

Typicalsupportingequipment:

• Cables– BIW,Rockbestos,Okonite,GeneralCable

• Wires– FWIIISIS,FLAMETROL• Heat‐shrinkin‐linecablesplices‐

TYCO/RAYCHEM• Terminalblocks– MARATHON• SealingTapes– Graphoil,Locktite• Connectors– EGSQualtech,Conax• SealingCompounds– DOW

CORNING,NAMCO

QualTech QDCconnector

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide12/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

Qualificationdocumentation– EQMS

• Testreports(EnvironmentalQualificationReport)

• NEKQualificationevaluations ‐ EPRIEQ managementSoftware (EQMS):

EQEnviroments

EQMEL

GQEPQE+SCEW

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide13/27

Qualificationdocumentation– EQMSPlantQualificationEvaluation Module(PQE):

ThermalAging– qualifiedlifecalculation:

PAOTprofilesareacomparison– margincalculation:

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide14/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

Otherqualificationdocuments:

EQblockdiagrams:

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide15/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

Otherqualificationdocuments:

EQWorkmanshipstandard (EQWS):

EQFieldConfigurationDrawings

EQFieldConfigurationPartsList

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide16/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQactivities: EQlabeling:Hotspots determination:• Temperature• Gammaandneutron

radiation

Controloverplantprocesses:‐ Designchanges‐ Preventive

Maintenance‐ Procurement

NEKCURRENTQUALIFICATIONPROGRAMSOVERVIEW

NEKEQprograms,UJVRež,2019

Slide17/27

EQPROGRAMFORELECTRICALANDI&C EQUIPMENT

EQoverallprocess

QualificationInputs:

Qualification test report(Manufacturer/Model)

Equipment:‐ Location (Normal and 

DBA environment)‐ Safety function‐ PAOT

Manufacturer/Model

EQMS qualification (PQE):

‐ Qualified Life‐ EQ configuration‐ EQ maintenance‐ Procurement 

requirements

EQ Block Diagram 

EQ Workmanship Standard‐ Configuration requirements 

(orientation, sealing, etc.)‐ Maintenance requirements 

(periodic replacement equipment or part, periodic inspections, etc.)

EQ Label,Plant Information system equipment EQ designation

(EQ=YES)

QualificationEvaluation:

QualificationOutputs:

EQgroupisinvolvedwheneverEQequipmentisaffected:1) Replaced,2) Modified,3) De‐installed4) NewEQequipmentinstalled5) Environmentalconditionsaffected

‐ EQ Master Equipment ‐ EQ Supporting Equipment

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide18/27

SecondPeriodicSafetyReview(PSR2):

1. QualificationtoSevereAccidents– EquipmentSurvivabilityProgram

2. ActiveMechanicalEquipmentEnvironmentalQualification–MechanicalQualificationProgram

3. ElectromagneticCompatibilityQualification– EMCProgram

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide19/27EQUIPMENTSURVIVABILITY(DEC)

REGULATIONS:

Slovenianlegislation:„Rulesonradiationandnuclearsafetyfactors“requiresEquipmentSurvivability(ES)assessmenttoshowthatthereisreasonableassurancethattheequipmentandinstrumentationusedtomitigateandmonitorDesignExtendedAccidentConditions(DEC).ActisinaccordancewithIAEA,WENRArequirements.

IAEASafetyStandardSSR‐2/1„SpecificSafetyRequirements“Requirement20‐ Designextensionconditions:„Thesedesignextensionconditionsshallbeusedtoidentifytheadditionalaccidentscenariostobeaddressedinthedesignandtoplanpracticableprovisionsforthepreventionofsuchaccidentsormitigationoftheirconsequences“.

WENRASafetyReferenceLevelsforExistingReactors(2014)IssueF‐ DesignExtensionofExistingReactors:„TherearetwocategoriesofDEC:• DECAforwhichpreventionofseverefueldamageinthecoreorinthespentfuel

storagecanbeachieved;• DECBwithpostulatedseverefueldamage“.„…DEChavethecapacityandcapabilityandareadequatelyqualifiedtoper‐formtheirrelevantfunctionsfortheappropriateperiodoftime …“

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide20/27EQUIPMENTSURVIVABILITY(DEC)

NEKWENRAapproach:

IAEAandWENRAplantstatesdefinesenvironmentalqualificationandequipmentsurvivability→NEKSafetyUpgradeProjects(SUP) requirements:

without 

significant fuel 

degradation

with core 

melt

Operational States 

Design extension conditions

Normal operation (NO)

Anticipated operational occurrences 

(AOO)

Design basisaccidents (DBA)

Accident conditions

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide21/27EQUIPMENTSURVIVABILITY(DEC)

DESIGNEXTENSIONCONDITIONSDECB

1) ThelimitingscenarioisSBOsequencewithPCFV,PAR actuation,mitigationactionsat24h:reactorcoredamage,Ex‐Vesselcorerelocation;AccidentmitigationscenariousingAHXinsevereaccident(spray,recirculationfromcontainmentsumpduringex‐vesselevent):conditionsinAB,IBbuildingatARHRequipment/pipinglocations

2) SGTR:radioactivereleasetoenvironment‐ conditionsinBB1,BB2,Yard3) SFPaccident:scenarioperIndustryGuidanceNEI12‐02‐ conditionsinFHB

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide22/27EQUIPMENTSURVIVABILITY(DEC)

EquipmentSurvivabilityElements

EquipmentSafetyFunctionandLocationAssessmentDECclassification:

• Detailedsafetyfunctiondescription‐ inwhichspecificplantstateequipmentwillbeused(normaloperation,abnormaloperation,DBA,DEC)– IfDECthancandidateforDECclassification

• Locationofequipment– isequipmentlocatedinHarshenvironment– IfYesthancandidateforDECclassification

• Temperature:8,30C(150F) abovenormal/designT• Pressure:10%abovenormal/design(10kPa– 1,47psi)• RH:100%RHwithcondensation• ChemicalSpray ‐ exposure• Submergence – exposure• Radiation TID>100Gy;>10Gyforelectronics

DECPAOTtimingisdetermined:1hour,1day,1month,1year

DECQualificationstandards:‐ ElectricalandI&C:IEEE323‐1974orlateredition,IEEEEQdaughterstandards(317,334,382,383,…)

‐ Mechanical:ASMEQME‐1,orqualificationofnon‐metallicmaterials

DEC A or DEC B

&

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide23/27EQUIPMENTSURVIVABILITY(DEC)

DECsystemsandqualification

Variouspost‐FukushimaSafetyUpgradeProjectsunderdevelopment:

• IndependentthirdDECDieselGeneratoradditionaltotwo100%redundantDBADGs– DECBequipment

• Floodprotectionupgrade• NewEmergencyControlRoominDECBunkeredBuilding• PassiveContainmentFiltering&Ventilationsystem(PCFV)– DECBequipment

• PassiveAutocatalyticSystem(PAR)– DECBequipment• Containmentaccidentinstrumentation‐ DECA&B• Variousinstrumentslocatedinsystemsincontainmentbuilding(includingnewneutronfluxinstrumentationchannels)– DECA&B

• IndependentsystemfortheRCSpressurerelief(alternatePORV)‐DECAsystem

• ReactorCoolantandContainmentalternatecooling(ARH‐ACI)systemDECA&B

• AlternateSIandAF(ASI,AAF)systemsDECA&B• AlternatecoolingoftheSFP(HeatExchangers,SpraySystem)– DECAsystems

EquipmentSurvivability(underdevelopment)performedtorequiredlevelofconditions(DECAorDECBconditions).

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide24/27OTHER NEW QUALIFICATION PROGRAMS

ActiveMechanicalEquipmentQualification

• Newqualificationprogrambasedon:• EPRIEQReferenceManual• EPRINP‐3877QualificationofActiveMechanicalEquipmentforNuclearPlants

• NUREG0800StandardReviewPlanCh.3.11• RG1.100Rev.3(SEISMICQUALIFICATIONOFELECTRICALANDACTIVEMECHANICALEQUIPMENTANDFUNCTIONALQUALIFICATIONOFACTIVEMECHANICALEQUIPMENTFORNUCLEARPOWERPLANTS)endorsingASMEQME‐1(QualificationofActiveMechanicalEquipmentUsedinNuclearPowerPlants)

• MEQMELdevelopment:DBAandDECequipment;Safetyfunction;PAOT;Location(NormalandHarshenvironmentconditions)

• Qualificationassessment: Based onavailablequalificationtestreportsorbasedonevaluationofnon‐metallicmaterials(EPRIreportsandCurtissWrightPowerSuiteEQapplications)

• Documentationpackages(similarapproachasEQ);correctiveactions• Preservingqualifiedstatus:controlofmaintenance,modificationsandprocurementprocesses

NEWQUALIFICATIONREQUIREMENTSUNDERDEVELOPMENT

NEKEQprograms,UJVRež,2019

Slide25/27OTHER NEW QUALIFICATION PROGRAMS

EMCQualificationProgram

• Newqualificationprogrambasedon:• USNRCRegulatoryGuide1.180

• Guidanceapplicabletoallnewsafetyrelatedsystemsormodificationstoexistingsafetyrelatedsystemscontaininganalog,digitalorhybrid(combined)electronicsequipment

• EPRITR‐102323• DetailedtechnicalreportprovidingdetailsfromhistoricalbackgroundtorecommendedgenericEMIsusceptibilityandemissionstestlevelstobeusedinestablishingequipmentelectromagneticcompatibilityfornuclearpowerplantapplications

• ProvidesdefinitionofequipmentunderEMCscope:• EMCzones:highemissions(E);sensitiveequipment(S)includingexclusionzones

• SRI&CequipmentlocatedinEMCzones• ProvidesguidelinesandpracticalexamplesforEMC‐relateddocumentation

• Zonemapping hasbeenperformedtocaptureanemissionprofileoftheselectedarea.

• Administrativemeasures– definesexclusionsareaforwelding,useofportabletransceivers

• Implementationofpracticalnoisereductiondesignconsiderations• Qualificationsprocessrequiredandstartedfornewequipment/systems(includingSUP)

NEARFUTURETASKS

NEKEQprograms,UJVRež,2019

Slide26/27

• EQprogram/PlantLifeExtensionfrom40to60years(2023to2043)

• ElectricalPenetrationAssemblies,Cables,CableSplicesandothercommoditiesqualifiedlifeextension(ReanalysisperNUREG‐1801,qualificationtestingforlifeextension)

• Obsoleteequipment– newqualifications

• TocompleteEquipmentSurvivability• TocompleteMEQprogram• TocompleteEMCprogram

• PSR3???

Naslovnica

Thankyou!

peter.klenovsek@nek.si

www.nek.si

NEK EQ presentation

40’

NEKEQprograms,UJVRež,2019

Slide27/27