Post on 10-Mar-2019
transcript
EM01
A701
1
2
3
4
1
A101
1
A401
1
A201
EXISTING EXIT SIGN
PROPOSED EXIT SIGN
EMERGENCY LIGHT
OCCUPANT LOAD
COMBINED OCCUPANT LOAD
TOTAL OCCUPANT LOAD
EXIT DISCHARGE
INTERIOR ELEVATION
MARKER
REVISION TAG
EXIT SIGN WITH EMERGENCY
LIGHT COMBO
PROPOSED EXIT SIGN
BUILDING SECTION
LEVEL NAME
(ELEVATION)
+8'-3"
1
25
50
E
EM01
EM01
EM01
STAIR
24" 48"
DRAWING NUMBER
SHEET NUMBER
BUILDING ELEVATION
DRAWING NUMBER
SHEET NUMBER
DETAIL CALLOUT
DRAWING NUMBER
SHEET NUMBER
LEVEL MARKER
SPOT ELEVATION
DRAWING NUMBER
SHEET NUMBER
DIRECTIONAL
ILLUMINATION
PROPOSED WIDTH
CODE REQ. WIDTH
101
STOKES
ARCHITECTURE
1A2
L01
PARTITION TAG
DOOR TAG
WINDOW TAG
LIGHT FIXTURE TAG
FINISH TAG
1HR FIRE RATED PARTITION
2HR FIRE RATED PARTITION
3HR FIRE RATED PARTITION
1HR FIRE RATED
SHAFT ASSEMBLY+
2HR FIRE RATED
SHAFT ASSEMBLY
3HR FIRE RATED
SHAFT ASSEMBLY
ACCESSIBLE PATH
OF EGRESS
FEPATH OF EGRESS
ROOM TAG
W1
F-01 FIXTURE TAG
101-01
W-2
FIRE RATING
ASSEMBLY SUBTYPE
ASSEMBLY TYPE
DOOR NUMBER
ROOM NUMBER
ROOM NAME
ROOM NUMBER
PORTABLE FIRE
EXTINGUISHER
► ► ►
SHOPPES AT BELMONT 1569 FRUITVILLE PIKE
LANCASTER, PA 17601
2103 SANSOM STREET
PHILADELPHIA, PA 19103
PH: 215.523.9190
p. j. WHELIHAN'S- LANCASTER
11.07.2017
SYMBOLS KEY PROJECT RENDERING (S) DRAWING LIST
GENERAL NOTES LOCATION PLAN ENLARGED LOCATION PLAN
ABBREVIATIONS
OPERATOR
PJW RESTAURANT GROUP
520 HADDON AVE
HADDONFIELD, NJ 08033
PH: 856.216.0856
FX: 856.216.8447
STRUCTURAL ENGINEERS
ANH STRUCTURES, LLC
216 COPPELS LANE
WALLINGFORD, PA 19086
PH: 610.812.5465
MEP ENGINEERS
FXB ENGINEERING
5 CHRISTY DRIVE, SUITE 307
CHADDS FORD, PA 19317
PH: 610.558.3464
KITCHEN DESIGNER
SINGER EQUIPMENT
180 HELLER PLACE
BELLMAWR, NJ 08031
PH: 800.443.2212
PROPERTY OWNER
R.J. WATERS & ASSOCIATES INC.
200 OLD FORGE LANE SUITE 201
KENNETT SQUARE, PA 19348
PH: 610.388.6600
FX: 610.388.6605
PERMIT SET
N N
1. ALL WORK AND MATERIALS SHALL MEET THE REQUIREMENTS OF LOCAL AND STATE CODES AND THE SPEC'S OF THE NATIONAL BOARD OF FIRE UNDERWRITERS. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF THE TOWNSHIP AND/OR APPROPRIATE AUTHORITY
HAVING JURISDICTION OVER CONSTRUCTION WHERE THE PROJECT IS LOCATED. CONTRACTOR SHALL CHECK AND VERIFY ALL PLAN DIMENSIONS AND CONDITIONS BEFORE PROCEEDING WITH CONSTRUCTION AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR CORRECTION
PRIOR TO BEGINNING ANY WORK. DO NOT SCALE DRAWINGS. ALL WRITTEN DIMENSIONS GOVERN.
2. THE GENERAL CONTRACTOR SHALL PROVIDE ALL MATERIALS AND LABOR, WHETHER IMPLIED BY, OR DIRECTLY STATED ON THESES DRAWINGS, IN ORDER TO COMPLETE THE WORK AS INDICATED HEREIN.
3. THE ARCHITECT IS NOT RESPONSIBLE FOR ANY DEVIATIONS FROM THE PLANS AND SPECIFICATION INFORMATION.
4. THE ARCHITECT SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, FOR SAFETY PRE-CAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, OR THE ACTS OR OMISSIONS
OF THE CONTRACTOR, SUBCONTRACTORS, OR ANY OTHER PERSONS PERFORMING ANY WORK, OR FOR FAILURE OF ANY OF THEM TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS.
5. ANY WORK SHOWN OR REFERRED TO ON ANY PORTION OF THE DOCUMENTS SHALL BE PROVIDED AS THOUGH SHOWN ON ALL DOCUMENTS, WHERE DISCREPANCIES OCCUR IN THE DOCUMENTS, GC SHALL OBTAIN CLARIFICATION IN WRITING PRIOR TO SUBMITTING HIS BID. OTHERWISE, IT WILL
BE ASSUMED THE HIGHER COST ITEM WAS BID ON. IN ORDER TO ENSURE COORDINATION, PARTIAL SETS OF DRAWINGS SHALL NOT BE ISSUED TO ANY CONTRACTOR, SUB-CONTRACTOR, OR VENDOR. ONLY COMPLETE SETS OF DOCUMENTS ARE TO BE ISSUED.
6. THE FOLLOWING SET OF DRAWINGS IS AN INSTRUMENT OF PROFESSIONAL SERVICE AND SHALL REMAIN THE PROPERTY OF STOKES ARCHITECTURE, WHETHER THE PROJECT IS EXECUTED OR NOT. NO CHANGES, ALTERATIONS, OR DELETIONS MAY BE MAKE HERETO EXCEPT BY THE
ARCHITECT.
7. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR AT THE SITE.
8. HOLD INDICATED DIMENSIONS. DO NOT SCALE DRAWINGS. RESOLVE ANY DISCREPANCIES BEFORE BEGINNING WORK.
9. ALL EXISTING CONSTRUCTION AND LANDSCAPE FEATURES THAT ARE TO REMAIN AS PART OF THE PROJECT SHALL BE PROTECTED FROM DAMAGE THROUGHOUT THE PERIOD OF CONSTRUCTION WORK. ANY DAMAGED CONSTRUCTION OR FEATURES SHALL BE REPLACED AT THE EXPENSE OF
THE CONTRACTOR TO THE SATISFACTION
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND ALL SUBCONTRACTORS TO VERIFY ALL DIMENSIONS AND INSPECT CONDITIONS OF PRIOR WORK OF OTHER TRADES BEFORE PROCEEDING WITH ANY WORK. UNACCEPTABLE OR INCORRECT PRIOR WORK SHALL BE REPAIRED OR
REPLACED BEFORE STARTING WORK. PROCEEDING WITH THE WORK SHALL CONSTITUTE ACCEPTANCE OF PRIOR WORK.
11. REFER TO SPECIFICATION AND/OR SCHEDULES.
12. ALL CONTRACTORS SHALL VISIT THE SITE AND THOROUGHLY ACQUAINT THEMSELVES WITH THE CONDITIONS IN THE FIELD AND THE NATURE AND THE EXTENT OF THE WORK TO BE PERFORMED.
13. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS IN CONNECTION WITH THE WORK. THE CONTRACTOR SHALL GIVE NOTICES AND COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, RULES, REGULATIONS AND
ORDERS OF ANY PUBLIC AUTHORITY BEARING ON THE SAFETY OF PERSONS AND PROPERTY, AND THEIR PROTECTION FROM DAMAGE, INJURY AND LOSS. THE CONTRACTOR SHALL INSURE THAT THE JOB SITE IS MAINTAINED AT ALL TIMES IN SUCH A WAY AS TO PREVENT INJURY OR DAMAGE TO
ALL PERSONS WORKING ON OR VISITING THE PREMISES AND TO PERSONAL PROPERTY.
14. THE CONTRACTOR REPRESENTS THAT HE HAS THOROUGHLY REVIEWED THE DRAWINGS, SPECIFICATIONS AND CONTRACT DOCUMENTS AND THAT THEY ARE SUITABLE FOR SUBMITTING A VALID BID. CONTRACTOR SHALL SUBMIT A WRITTEN DESCRIPTION OF ALL DEFICIENCIES AND
AMBIGUITIES IN THE CONTRACT DOCUMENTS TO THE OWNER WITHIN 30 DAYS OF SIGNING THE CONTRACT. CHANGE ORDERS FOR DESIGN DEFICIENCIES OR AMBIGUITIES NOT INCLUDED IN CONTRACTORS DESCRIPTION WILL NOT BE AUTHORIZED.
PERMIT CONSTRUCTION REV 1
COVER SHEET
CS COVERSHEET • •
LS101 CODE REVIEW & LIFE SAFETY PLAN • •
CS101 ACCESSIBLE DETAILS • •
PLANS AND RCP'S
A101
GROUND & BASEMENT FLOOR
PLANS
• •
A102
GROUND & BASEMENT REFLECTED
CEILING PLANS
• •
A103 GROUND LIGHTING PLANS • •
A104
GROUND & BASEMENT FINISH
PLANS
•
A105 FURNITURE & EQUIPMENT PLANS •
ENLARGED (PLAN AND SECTION) DETAILS
A501 RESTROOM PLANS & ELEVATIONS • •
A502 BAR PLANS & ELEVATIONS •
A503 BAR SECTIONS & DETAILS •
A504 BAR DETAILS •
SPECS, SCHEDULES, DIAGRAMS
A601 PARTITION & CEILING SCHEDULE • •
A602 FINISH SCHEDULE • •
A603 DOOR & WINDOW SCHEDULE • •
INTERIOR ELEVATIONS
A701 INTERIOR ELEVATIONS •
A702 INTERIOR ELEVATIONS •
A703 INTERIOR ELEVATIONS •
INTERIOR DETAILS
A801 INTERIOR WALL SECTIONS •
A802 BOOTH DETAILS •
A803 MILLWORK ELEVATIONS & DETAILS •
A804 MILLWORK & VESTIBULE DETAILS •
MECHANICAL
M1.0 SYMBOLS & NOTES •
MD1.0 MECHANICAL DEMOLITION PLAN •
M2.0
MECHANICAL FLOOR PLAN - NEW
WORK
•
M2.1
MECHANICAL FLOOR PLAN - NEW
WORK
•
M3.0 MECHANICAL SCHEDULES •
M4.0 MECHANICAL DETAILS •
M5.0 MECHANICAL SPECIFICATIONS •
M6.0 KITCHEN EQUIPMENT PLANS •
M6.1 KITCHEN EQUIPMENT PLANS •
M6.2 KITCHEN EQUIPMENT PLANS •
M6.3 KITCHEN EQUIPMENT PLANS •
M6.4 KITCHEN EQUIPMENT PLANS •
M6.5 KITCHEN EQUIPMENT PLANS •
PERMIT CONSTRUCTION
PLUMBING
P1.0 PLUMBING SYMBOLS & NOTES •
PD1.0
PLUMBING FLOOR PLANS -
DEMOLITION
•
P2.0
PLUMBING SANITARY FLOOR PLAN
- NEW WORK
•
P2.1
PLUMBING DOMESTIC WATER &
NATURAL GAS FLOOR PLAN- NEW
WORK
•
P2.2
PLUMBING ROOF PLAN - NEW
WORK
•
P3.0 PLUMBING SCHEDULES •
P4.0 PLUMBING DETAILS •
P5.0 PLUMBING SPECIFICATIONS •
ELECTRICAL
E1.0 ELECTRICAL SYMBOLS & DETAILS •
E1.1
ELECTRICAL NOTES &
ABBREVIATIONS
•
E2.0
ELECTRICAL 1ST FLOOR PLAN -
LIGHTING
•
E3.0
ELECTRICAL 1ST FLOOR PLAN -
POWER
•
E3.1 ELECTRICAL ENLARGED PLANS •
E3.2
ELECTRICAL 1ST FLOOR PLAN -
HVAC POWER
•
E3.3 ELECTRICAL ROOF PLAN - POWER •
E4.0 ELECTRICAL ONE-LINE DIAGRAM •
E4.1 ELECTRICAL PANEL SCHEDULES •
E4.2 KITCHEN EQUIPMENT SCHEDULE •
E4.3 KITCHEN EQUIPMENT SCHEDULE •
E5.0 ELECTRICAL DETAILS •
E5.1
ELECTRICAL DETAILS - CAPTIVE
AIRE
•
E5.2
ELECTRICAL DETAILS - CAPTIVE
AIRE
•
E5.3
ELECTRICAL DETAILS - CAPTIVE
AIRE
•
E5.4
ELECTRICAL DETAILS - CAPTIVE
AIRE
•
E6.0 ELECTRICAL SPECIFICATIONS •
FIRE PROTECTION
FA1.0
FIRE ALARMS SYMBOLS, NOTES &
DETAILS
•
FA2.0 1ST FLOOR FIRE ALARM PLAN •
FP1.0
FIRE PROTECTION SYMBOLS &
NOTES
•
FP2.0 FIRE PROTECTION FLOOR PLAN •
ABV
AP
ACS
ACT
AD
ADD
ADDL
ADH
ADJ
ADJT
AFF
AGG
AC
ALT
ALUM
AB
ANOD
APPROX
ARCH
ASPH
AUTO
AVG
BBD
BP
BSMT
BM
BEL
BMK
BET
BYD
BIT
BLK
BLKG
BLS
BD
BS
BOT
BOC
BOF
BOS
BOW
BRCG
BRKT
BRK
BC
BRZ
BLDG
CAB
CPT
CB
CK
CLG
CEM
CTR
CL
CT
CHBD
CHAM
C
CO
CLR
CLO
CW
COL
COMB
COMP
COMPR
CONC
CMU
COND
CNDT
CONN
CONST
CONT
CONTR
CJT
COORD
CPR
CORR
CNTR
CFL
CS
CRS
CVR
CFT
CYD
CUS
DPR
DMPF
DL
DEMO
DEPT
DEPR
DET
DTL
DIA
DIFF
DIM
DISP
DIV
DR
DBL
DWL
DN
DS
D
DWR
DWG
EA
E
ELAS
ELEC
EP
EWC
ELEV
EL
EMER
ENC
ENT
EPX
EQ
EQP
EST
EXC
EXH
EXG
ED
EPS
EB
EJT
EXP JT
EXP
EXT
EXTR
FAB
FB
FO
FOB
FOC
FOM
FOS
FOW
FCU
FDV
FND
FNV
FBD
FGL
FIN
FFL
FFE
FGD
FF
FA
FEC
FRC
FRT
FPF
FXD
FLG
FLX
FLR
FD
FLUOR
FT
FTG
FDN
FR
FS
FBO
FOIC
FURN
FUR
FUT
GA
GAL
GALV
GSM
GSTL
GL
GFRG
GLZ
GBR
GD
GRN
GND
GWP
GT
GWB
HNRL
HDW
HDWD
HDR
HTR
HTG
HVAC
HT
HEX
HP
HM
HMDRF
HK
HORIZ
HW
HWH
HR
HYD
IN
INCL
ID
INSUL
INT
INV
JAN
JT
JTF
KPL
LBL
LAD
LAM
LAV
LCCPR
L
LH
LNG
LT
LTG
LW
LMS
LIN
LTL
LL
LKG
LVR
LP
MACH
MH
MFR
MRB
MAS
MO
MARL
MAX
MECH
MED
MEMB
MTL
MM
MWK
MIN
MIR
MISC
MOD
MLDG
MR
MRT
MT
MOV
MUL
NAT
NEO
NOM
N
NIC
NTS
NUM
OC
OPQ
OPNG
OPP
OPPF
OPPH
OPPS
OZ
O TO O
OD
OVHD
OA
P
PNT
PR
PNL
PTD
PTR
PARA
PAR
PBD
PTN
PVMT
PERF
PERI
PERP
PLAS
PLAM
PL
PNT
PLYWD
PWD
PSF
PSI
PIP
PFB
PFN
PFM
PMF
PRT
PROJ
QT
QTR
RAD
REC
RECT
REF
RP
RFL
REFR
REG
REINF
RLF
RMV
REQ
RES
RTN
RA
REV
RH
R
RD
RFG
RM
RO
RND
RBR
SFGL
SCHD
SCN
SNT
SEC
SSK
SB
SHTH
SHT
SHL
SHRG
SIM
SLV
SP
S
SPK
SPL
SPEC
SFP
SQ
SF
STAG
SST
STD
STL
STOR
STRUCT
SUR
SUSP
SW
SYM
SYN
SYS
TKBD
TEL
TEMP
TC
THER
THRSHLD
THK
TLT
T&G
TO
TOC
TOF
TOS
TOW
TD
TRANS
TR
TYP
UCT
UL
UNF
UON
URTH
U/S
UTIL
VB
VNR
VENT
VIF
VERT
VCB
VCT
VSB
VOL
WSCT
WC
WR
WS
WPF
WT
WWF
W
WF
WDW
WM
W/
W/O
above
access panel
acoustical
acoustical ceiling tile
area drain
addendum
additional
adhesive
adjacent
adjustable
above floor finish
aggregate
air conditioning
alternate
aluminum
anchor bolt
anodized
approximate
architect, -ural
asphalt
automatic
average
base board
base plate
basement
beam
below
bench mark
between
beyond
bituminous
block
blocking
bluestone
board
both sides
bottom
bottom of concrete
bottom of footing
bottom of steel
bottom of wall
bracing
bracket
brick
brick course
bronze
building
cabinet
carpet
catch basin
caulk
ceiling
cement
center
center line
ceramic tile
chalkboard
chamfer
channel
clean out
clear, clearance
closet
cold water
column
combination
computer
compress, -ed, -ion, -ible
concrete
concrete masonry unit
condition, -al
conduit
connect, -or, -ion
construction
continuous
contract, -or
control joint
coordinate
copper
corrugated
counter
counterflashing
countersunk
course, -s
cover
cubic foot
cubic yard
custom
damper
dampproofing
dead load
demolish, demolition
department
depress, -ed
detail
detail
diameter
diffuse
dimension
dispenser
division
door
double
dowel
down
down spout
drain
drawer
drawing
each
east
elastomeric
electric, -al
electrical panel
electrical water cooler
elevation
elevator
emergency
enclosure
entrance
epoxy
equal
equipment
estimate
excavator, excavation
exhaust
existing, existent
existing dimension
expanded polystyrene
expansion bolt
expansion joint
expansion joint
expose, -d
exterior
extrusion
fabricate, fabricator
face brick
face of
face of building
face of concrete
face of masonry
face of stud
face of wall
fan coil unit
fire department valve
feminine napkin disposal
feminine napkin vendor
fiberboard
fiberglass
finish
finish floor
finish floor elevation
finish grade
finished face
fire alarm
fire extinguisher cabinet
fire-resistant coating
fire-retardant
fireproof, -ing
fixed
flashing
flexible
floor
floor drain
fluorescent
foot, feet
footing
foundation
frame, -d, -ing
full size
furnish by others
furnished by owner,
installed by contractor
furnish, -ed
furred, -ing
future
gauge
gallon
galvanize, -d
galvanized sheet metal
galvanized steel
glass
glass fiber reinforced gypsum
glaze, -d, -ing
grab bar
grade, -ing
granite
ground
grounded waterproof outlet
grout
grypsum wall board
handrail
hardware
hardwood
header
heater
heating
heating, ventilating, & air
conditioning
height
hexagonal
high point
hollow metal
hollow metal door frame
hook
horizontal
hot water
hot water heater
hour
hydrant
inch
include, -d,- ing
inside diameter
insulate, -d, -ing
interior
invert
janitor
joint
joint filler
kick plate
label
ladder
laminate, -d
lavatory
lead coated copper
left
left hand
length, long
light
lighting
lightweight
limestone
linoleum
lintel
live load
looking
louver
low point
machine
manhole
manufacturer
marble
masonry
masonry opening
material
maximum
mechanical
medium
membrane
metal, -ic
millimeter
millwork
minimum
mirror
miscellaneous
modular
molding
mop receptacle
mortar
mount, -ed
movable
mullion
natural
neoprene
nominal
north
not in contract
not to scale
number
on center
opaque
opening
opposite
opposite face
opposite hand
opposite side
ounce
out to out
outside diameter
overhead
overall
page
paint, -ed
pair
panel
paper towel dispenser
paper towel receptacle
paragraph
parallel
particle board
partition
pavement
perforate, -d
perimeter
perpendicular
plaster
plastic laminate
plate
paint, -ed
plywood
plywood
pounds per square foot
pounds per square inch
poured in place
prefabricated
prefinished
preformed
premolded filler
pressure treated
project
quarry tile
quarter
radius
recessed
rectangular
reference
reference point
reflect, -ed
refrigerator
reglet
reinforcing, -ment
relief
remove, -able
require, -d
resilient
return
return air
revise, -d, -ion
right hand
riser
roof drain
roofing
room
rough opening
round
rubber
safety glass
schedule
screen
sealant
section
service sink
setting bed
sheathing
sheet
shelf, shelving
shoring
similar
sleeve
soundproof, -ing
south
speaker
special
specification, -s
spray fireproofing
square
square foot
staggered
stainless steel
standard
steel
storage
structure, -al
surface
suspended
switch
symmetrical
synthetic
system
tackboard
telephone
temperatire
terra cotta tile
thermostat
threshold
thick, -ness
toilet
tongue and groove
top of
top of concrete
top of footing
top of steel
top of wall
towel dispenser
transparent
tread
typical
undercut
underwriter's laboratory
unfinished
unless otherwise noted
urethane
underside
utility
vapor barrier
veneer
ventilating
verify in field
vertical
vinyl cove base
vinyl composite tile
vinyl straight base
volume
wainscot
water closet
water repellent
water stop
waterproof, -ing
weight
welded wire fabric
west
wide flange
window
wire mesh
with
without