Pacific Island Global Climate Observing System...

Post on 19-Jul-2020

1 views 0 download

transcript

Pacific Island Global Climate Observing System (PI-GCOS)

30-September-2004

Pacific Data Management Workshop

Honolulu, Hawaii

Howard Diamond, NOAA/NCDCU.S. National GCOS Program Manager

Silver Spring, Maryland USA

Agenda

• Background of Global Climate Observing System (GCOS)

• Overview of In-Situ GCOS Networks

• Pacific Islands Regional GCOS Program

• NOAA PRIDE Initiative

• Contact Information

GCOS OBSERVING NETWORKS

ATMOSPHERIC OBSERVATIONS:

GCOS Surface Network (GSN)

GCOS Upper-Air Network (GUAN)

Global Atmosphere Watch (GAW)

Atmospheric Brown Cloud (related to GAW but not a formal GCOS network per se)

GCOS Surface Network (GSN)981 Stations

GCOS Secretariat 26 May 1999

STATUS OF THE GSN

GCOS Upper Air Network (GUAN)

GCOS Secretariat 21 April 1999

152 Stations

GSN/GUAN: Performance MonitoringGSN/GUAN: Performance MonitoringGUAN: Reception rate over the globe (Dec 2002)

Project Atmospheric Brown Cloud (ABC)- AsiaSurface Observation System

Proposed locations for ABC observatories (red dots). Green dots indicate existingobservatories to be used as is. The yellow dots indicate locations under consideration.

(V. Ramanathan, 2003)

GCOS OBSERVING NETWORKS

OCEAN OBSERVATIONS:Climate Components of:

Ships of Opportunity Programme (SOOP/XBT)Global Sea-Level Observing System (GLOSS)Tropical Atmosphere-Ocean (TAO) ArrayPIRATADrifting Buoys (DBCP)Array of 3,000 ARGO Floating Buoys in Pacific, Indian, and Atlantic Oceans

Multinational Contributions (including New Zealand)

The Future Sustained Ocean Observing Systemfor Climate -- Target 2008

1250 Surface Drifting Buoys(Global Coverage)

3000 Argo Profiling Floats(Global Coverage)

Sea Surface Temperature, Sea Surface Height, and Surface Vector Wind from Space

86 Tide Gauge Stations, All GPS/DORIS located.

(Global Coverage)

Global System 100 % Complete

Total Number of Observations

In 1998.

Tropical Moored Buoys

Ships of Opportunity

Argo Profiling Floats

Tide Gauge Stations

Ocean Reference Stations

Surface Drifting Buoys

Dedicated Ships

Coastal Moored Buoys

note note note

GCOS OBSERVING NETWORKS

TERRESTRIAL OBSERVATIONS:

Climate Components of:

Coral Reef Monitoring (e.g., Hotspot Monitoring)Coastal Observations (e.g., IOOS)Other Paleoclimate ProxiesCarbon Flux (FLUXnet)Hydrology (GTN-H) [proposed]Permafrost (GTN-P)Glaciers (GTN-G)

US/NZ Bi-Lateral Climate Activities of Interest to the NDSC

• Bi-Lateral Climate Change Partnership signed July 2003

• 9 out of 26 proposals involve NOAA and NIWA; 7 of the 9 addressspecific observing projects as follows:

• Proposed Flask Sampling From a Ship Plying The Western Pacific for CO2 Measurements in the Southern Ocean

• Stratospheric Water Vapor Profiles at Lauder

• Dobson Spectrophotometer Measurements of Stratospheric Ozone

• Network for the Detection of Stratospheric Change (NDSC)

• Surface Ozone Measurement Project at South Pole

• Improved climate monitoring systems for the Pacific (GCOS)

• Improved ocean climate observations for the Pacific (GOOS)

Trend of Water Vapor Over Boulder, CO(1980-2000) for All Months

Trend (%/year)

Altit

ude

(km

)

30

28

26

24

22

20

18

16

14

12

10-5 -4 -3 -2 -1 0 1 2 3 4 5

Pacific Island GCOS (PI-GCOS)

Hilo

Christmas

Rorotonga

Atouna

Papette

Rapa

PenrhynFunifuti

Pago Pago

Honiara

Vanuatu

Nouma

Port Moresby

Tarawa

MajuroTruk

Guam

Koror

PI-GCOS ‘Fale/House’

PI-GCOS Implementation

• Regional GCOS Implementation Plan Developed (Finalized but stillin draft form)

• Prioritized list of 31 Projects in 5 Objective Areas• Advocacy• Sustaining Operational Observing Networks• Managing and Exchanging Regional GCOS Data• Accessing and Developing Products and Services• Building Capacity for Long-Term PI-GCOS Sustainability

• Selected Projects With Identified Funding• Regional GCOS Coordinator [US] • Demonstration Project for GCOS [NZ] • Expanding the Use of Climate Prediction [BoM] • Maintenance Support [US]• Pacific Data Portal

• Scope of the other 27 Pacific Island GCOS Projects is in the range of $24M (US) over the period from 2003 through 2008

SPREP

GCOSSteering

Committee

WMO / IOC / UNEP / ICSU UNFCCC

GTOS

GOOS

WMOSubRegional

Office

GCOSSecretariat

PI-GCOSSteering

Committee

PI-GCOS Conceptual Framework

StakeholdersGCOS

NationalCoordinators

PI-GCOS Officer

http://pi-gcos.org