OFFICE OF THE PRIME MINISTER
VOTE: 003
MINISTERIAL POLICY STATEMENT
FINANCIAL YEAR: 2015/16
VISION : A P u b l i c S e c t o r t h a t i s r e s p o n s i v e a n d a c c o u n t a b l e i n s t e e r i n g
U g a n d a t o w a r d s r a p i d e c o n o m i c g r o w t h a n d d e v e l o p m e n t
o
THE REPUBLIC OF UGANDA
Presented to Parliament for the
Debate on Estimates for Revenue and Expenditure
Prof. Tarsis Bazana Kabwegyere
Minister for General Duties / Office of the Prime Minister
w w w . o p m . g o . u g
Office of the Prime Minister Ministerial Policy Statement
Table of Contents
Forward ......................................................................................................................................... i
Abbreviations and Acronynms ................................................................................................... ii
Structure of the Ministerial Policy Statement .............................................................................. iv
Executive Summary ..................................................................................................................... vi
V1: Vote Overview ....................................................................................................................... 1
V2: Vote Performance for FY 2014/15 and Planned Outputs for FY 2015/16 ........................... 2
V3: Detailed Planned Outputs for FY 2015/16 .......................................................................... 16
V3.1: Vote Function Profiles, Programme/Project Profiles and Work plan Outputs ................. 25
V3.2: Past and Medium Term Key Vote Output Indicators ....................................................... 82
V3.3: Key Unit Costs of Services Provided and Services Funded ............................................ 83
V3.4: Allocations by Class of Output over the Medium Term .................................................. 83
V3.5: Major Capital Investments ............................................................................................... 84
V3.6: Vote Actions to Improve Sector Performance ................................................................. 87
V4: Proposed Budget Allocations for 2013/14 and the Medium Term ...................................... 88
V4.1: Past Outturns and Medium Term Projections by Vote Function ..................................... 89
V4.2: Key Changes in Vote Resource Allocation ..................................................................... 89
V4.3: 2014/15 and 2015/16 Budget Allocations by Item .......................................................... 90
V5: Vote Cross-Cutting Policy and Other Budgetary Issues ..................................................... 91
Annex 1: Annual Cash Flow Plan
Annex 2: Overview of Wage Estimates
Annex 3: Staff Lists
Annex 4: Staff Recruitment Plan
Annex 5: Vote Procurement Plan
Annex 6: Pension and Gratuity Details
Office of the Prime Minister Ministerial Policy Statement
Page i
Foreword
The Right Honourable Speaker,
A. INTRODUCTION In accordance with the Public Finance Management Act, 2015, Section 13(13) on the
Annual Budget and the adjusted budget process for FY 2015/16 for Central Governments, I
have the honour to present to the 9th Parliament the Ministerial Policy Statement of Vote 003
Office of the Prime Minister for FY 2015/16.
For the FY 2015/16, the preparation of Vote 003 Budget Framework Paper (BFP),
Ministerial Policy Statement and detailed Budget Estimates centred around the Vote
Functions and attainment of specific outputs.
B. MANDATE
Article 108 A of the Constitution mandates the Prime Minister to:
(i) Be the Leader of Government Business in Parliament and be responsible for the
coordination and implementation of Government Policies across Ministries,
Departments and other Public Institutions.
(ii) Perform such other functions as may be assigned to him or her by the President or as
may be conferred on him or her by the Constitution or by law.
C. FUNCTIONS.
The Office is responsible for the following functions:
(i) Leading Government Business in Parliament;
(ii) Monitoring and Evaluation of the implementation of Government Policies and
Programmes;
(iii) Coordinating the implementation of Government Policies, Programmes and Projects;
(iv) Coordinating the implementation of the National Development Plan (NDP);
(v) Propagating the National Vision, defining National Character, National Values and
National Common Good for development;
(vi) Coordinating and providing public relations to ensure a good Government image;
(vii) Coordinating the development of capacities for prevention, preparedness, and
response to natural and human induced disasters and refugees; and
(viii) Coordinating and monitoring the implementation of Special Government Policies
and programmes for Karamoja, Northern Uganda, Luwero-Rwenzori, Bunyoro and
Teso Affairs.
Prof. Tarsis Bazana Kabwegyere
Minister for General Duties
Office of the Prime Minister
Office of the Prime Minister Ministerial Policy Statement
Page ii
Abbreviations and Acronyms
ALREP Agricultural Livelihoods Recovery Programme
ATIA Access To Information Act
AU African Union
BFPs
CMEBP
Budget Framework Papers
Coordination Monitoring Evaluation Budgeting and Planning
DEC's District Executive Committee
FY Financial Year
FFS
GAPR
GAHPR
GEF
GIS
HCIII
Farmer Field Schools
Government Annual Performance Report
Government Half-Annual Performance Report
Government Evaluation Facility
Geographical Information System
Health Centre Three
HCIV Health Centre Four
HISP
HOD
Household Income Support Project
Heads of Department
ICT
IDPs
Information Communication Technology
Internally Displaced Persons
IGAs Income Generating Activities
IGAD Inter Governmental Authority on Development
KALIP Karamoja Livelihoods Programme
JBSF Joint Budget Support Framework
JCB
KIDP
Joint Cross Boarder
Karamoja Integrated Development Programme
LG Local Government
LR Luwero- Rwenzori
LRDP Luwero-Rwenzori Development Plan
MDAs
MDGs
Ministries Departments and Agencies
Millennium Development Goals
M &E
MTEF
Monitoring and Evaluation
Medium Term Expenditure Framework
NDP National Development Plan
NECOC National Emergency Coordination Operation Centre
NGOs
NIMES
Non-Government Organizations
National Integrated Monitoring and Evaluation Strategy
NPA
NULEP
National Planning Authority
Northern Uganda Livelihood Program
NUSAF II Northern Uganda Social Action Fund (Phase II)
OPM Office of the Prime Minister
PCC Policy Coordination Committee
Office of the Prime Minister Ministerial Policy Statement
Page iii
PFA Prosperity For All
PIRT Presidential Investors Round Table
PMC Project Management Committee
PRDP Peace, Recovery and Development Plan
PWDs
PSM
People Living with Disabilities
Public Sector Management
ROM Result Oriented Management
SACCOs
SIP
Saving and Credit Cooperatives
Strategic Investment Plan
SMC
TCC
TMC
TWG
Senior Management Committee
Technical Implementation Coordination
Top Management Committee
Technical working Group
UVAB Uganda Veterans’ Association Board
UXOs Unexploded Ordinances
Office of the Prime Minister Ministerial Policy Statement
Page iv
Structure of the Ministerial Policy Statement
The Public Finance management Act, 2015, Section 13 (13) Annual Budget requires that:
“The Minister responsible for a vote, ministry or the head responsible for a Vote, shall by
the 15th of March submit to Parliament, the policy statements for the proceeding financial
year, for the Ministries or the other votes, as the case may be.
Vote Functions:
The Office of the Prime Minister (Vote 003) comprises of four Vote Functions namely;
1301- Policy Coordination, Monitoring and Evaluation
1302- Disaster Preparedness, Management and Refugees
1303- Management of Special Programmes
1349- Administration and Support Services
Structure
The Ministerial Policy Statement of the Office of The Prime Minister is structured as
follows:
VI. Vote Overview
i. Vote Mission statement
ii. Summary of Medium Term : Budget allocations
iii. Table V1.1 Overview of Vote Expenditures
iv. Chart V1.1 Medium Term Budget projections by Vote function
v. Vote outcomes and Outcome indicators
V2 Vote performance for the FY 2014/15 and Planned Output for 2015/16
vi. Past Vote Outputs
vii. Preliminary 2014/15 performance
viii. Table V1.3 past and 2015/16 Planned key outputs
V3 Detailed Planned Outputs for Financial Year 2015/16
ix. 2015/16 Planned outputs
x. Table V3.1 Vote Function profile, programme/project profiles and work plan outputs
xi. Table V3.2 Past Medium Term Vote Output Indicators
xii. Measures to improve performance
xiii. Table V3.3 Allocations to key sector and service delivery outputs over the medium term
Office of the Prime Minister Ministerial Policy Statement
Page v
Vote investment Plans
Table V3.4 Allocations by class of output over the medium Term
Table V3.5 Major Capital Investments
Priority Vote actions to improve Sector performance
Table V3.6 Vote actions to improve sector performance
V4. Proposed Budget allocation for 2015/16 and Medium Term
Table V4.1 Past outturns and Medium Term projections by Vote Function
i) The Total Budget over the Medium term
ii) The major expenditure allocations in the Vote for 2015/16
iii) The major planned changes in resource allocations within the Vote for 2015/16
Table V4.2 key changes in Vote Resource allocation
Table V4.3 2014/15 and 2015/16
V5. Vote cross Cutting Policy and other budgetary issues
Cross-cutting Policy issues
a. Gender and Equity
b. HIV/AIDS
c. Environment
Staff Establishment Structure
i. Detailed costed Staff List by February 2015
ii. Staff Recruitment Plan 2015/16
Conclusion: Comments, Responses and Recommendations on Issues Raised by
Parliament and other Institutions
This Section provides comments and responses to issues raised by the Parliamentary
Committee on Presidential Affairs on the Ministerial Policy Statement and Budget Estimates
for the Financial Year 2014/15. This is the last section (Annex) and is found on page 163.
Office of the Prime Minister Ministerial Policy Statement
Page vi
Executive Summary
This section presents the achievements for the Financial Year 2014/15 (July 2014-March
2015), and highlights of the outputs to be delivered during the next Financial Year 2015/16.
Achievements for the Financial Year 2014/15 (July 2014-March 2015)
The Office of the Prime Minister during the Financial Year 2014/15 had an approved budget
of Ushs.192.14bn shillings for both Development and Recurrent activities (o/w: Wage
Ushs.2.58bn; Non-wage Ushs.48.23bn; GoU Development Ushs.80.50bn and Donor
Development Ushs.60.83bn).
The Office registered a number of achievements in accordance with the planned outputs for
the Financial Year 2014/15 and within the available resource envelope. The key
achievements by vote function are highlighted as follows:
A) VOTE FUNCTION 1301: POLICY COORDINATION, MONITORING AND
EVALUATION
Parliamentary Business and Strategic Coordination under the Executive Office (Prime
Minister, Second Deputy Prime Minister and Government Chief Whip)
1. Provided strategic leadership for Government Business in Parliament through coordinating the programming of the legislative agenda and attendance of Cabinet
Ministers to their parliamentary responsibilities of responding to questions, and
presenting Government Bills and Ministerial Statements in Parliament. This was
instrumental in the passage by Parliament of fifteen (15) Bills, conclusion of twenty
three (23) Committee Reports, passage of eighteen (18) Motions, presentation of
thirty (30) Ministerial Statements and the conclusion of six (6) Petitions, ten (10)
questions for oral responded to.
2. The Prime Minister and the 2nd Deputy Prime Minister presided over strategic coordination of various government undertakings such as chairing the
preparatory meetings for the Presidential Investors’ Round Table (PIRT) which took
place in January/February 2015 to review progress in implementation of the Fourth
Phase of the PIRT, coordinating the Joint Budget Support leading to holding of the
meeting between the Joint Policy Coordination Committee (PCC) and the Joint
Budget Support Framework Development Partners Policy Committee (JBSF DP-PC)
on 15th July 2014 where the Fifth Round of the Joint Assessment Framework (JAF
5) was concluded and the Sixth round of the Joint Assessment Framework (JAF 6)
Matrix of Indicators and Targets was agreed; holding consultations with the United
Nations Representatives (United Nations Country Team – UNCT) on the
establishment of a high-level modality for Government engagement with the United
Nations Agencies, implementation of undertakings from the Uganda Mineral Sector
Retreat which took place on 16th December 2013 at State House Entebbe
3. The Prime Minister and his Deputy oversaw many other strategic coordination platforms such as the Annual Monitoring Committee meeting for the Peace
Recovery and Development Programme (PRDP 2); the Cabinet Committee on
Constitutional Amendments and a Committee Report to Cabinet was finalized, the
Office of the Prime Minister Ministerial Policy Statement
Page vii
Presidential advisory Committee on the Budget (PACOB) which compiled and
submitted a report to H.E the President on the Budget Strategy for FY 2015/16 and
other strategic coordination meetings on the ongoing development of the
Sustainable Development Goals (SDGs) , Environment and management of
wetlands, the Climate Change Policy, Oil Companies and Taxation.
4. The Prime Minister facilitated government international engagement to promote investment and international cooperation where international delegations on
development were hosted from North Korea, Netherlands and Egypt.
5. The Prime Minister and the 2nd Deputy Prime Minister officiated at a number of events and explained government policies such as monitoring Implementation of
public policies, programmes and projects in Rubirizi and Kumi Districts, handling
resettlement of the landless Sebei, etc.
6. Coordinated a number of Government policies such as the Public Sector Management programmes, cross cutting issues in Government, National budgeting
process, production of the Annual Performance implementation reports, etc
7. Provided leadership towards the reconciliation of the warring Muslim factions. 8. Monitored implementation of Government policies, programmes and projects in
Rubirizi, Kabarole, Kasese, Kamwange, Busoga, Kiruhura, Mbarara, Kisoro, Sebi
and Kumi district Local Governments.
Information and National Guidance
1. Implemented the Government Communication Strategy through a series of activities
like completing the Development of the Government Web Portal (www.gov.ug),
collecting and uploading information onto the Government web portal and OPM
website for improved coordination of Government communication, conducting a
survey in seven (7) Ministries to assess the status of the Government Communication
Units, holding three consultative meetings with Government Public Education Sub-
Region Coordinators in Lango and Acholi Sub regions, facilitating social media
monitoring activities on the use of free Government Airtime, holding meetings with
the Districts in Central Region on issues of Service Delivery and formed Media
Regional Teams, and training of all Communication Officers across MDAs, etc.
2. Carried out Assessment of UBC Inventory in Eastern Region.
3. Facilitated Media Management Activities on T/V and Radio talk shows.
4. Conducted Media and Publicity on the 52nd Independence Celebrations
5. Finalized a roadmap for developing the National Guidance Policy. Accordingly, a
task force to lead and manage the process was appointed and inaugurated
6. Conducted Sensitization meetings on National Values, National Interest, and
National Common Good in Primary schools in six sub-regions of Acholi, Ankole,
Bunyoro, Kigezi, Lango and West Nile Sub-regions of Uganda.
7. Conducted Pre-sensitization in Hoima and Kabarole districts.
8. Collected Data on Common Good and National Values in the districts of
Kiryandongo, Kitgum, Pader and Amuru .
Office of the Prime Minister Ministerial Policy Statement
Page viii
9. Conducted Sensitization meetings on National Values, interests and Common Good
in eighteen (18) Primary Teachers Training Colleges of, Elgon/Busoga/Bukedi sub
regions.
10. Collected Materials for the Newsletter Premier Magazine Vol. 13 in Acholi,
Karamoja and West Nile Regions.
11. Collected data and carried out one (1) support supervision on the use of Social Media
in the districts of Mubende, Kayunga, Mityana and Mpigi.
12. Conducted one (1) training session for PRO’s and Media Activists in presentation
and appearance on Talk shows TV and Radios.
Monitoring and Evaluation
1. Produced the Draft Government Annual Performance Report (GAPR) 2013/14 and Government Half Annual Performance Report (GHAPR) for 2013/14 and 2014/15
respectively the which were discussed in the two government retreats for Cabinet
Ministers, Ministers of State, Permanent Secretaries and representative of Local
Governments in December 2014 and March 2015
2. Conducted on spot field visits to verify submissions from MDAs which informed the GAPR and GHAPR for FY 2013/14 and 2014/15.
3. Carried out comprehensive Prime Minister Integrated Management Information System (PIMIS) study on Gov’t M&E systems and a report produced.
4. Developed and disseminated the Implementation strategy for National Policy on Public sector M&E
5. Held Quarter two (2) National Monitoring and Evaluation technical Working Group (NM&E TWG) meeting
6. Trained staff locally & internationally on Monitoring, Evaluation, Information systems & Project management
7. Trained all technical officers from MDAs, CAOs and Local Government Planners on Target setting & Indicator profiling.
8. Carried out a needs assessment for redesigning and development of a more robust Government Evaluation Facility (GEF)
9. Held Barazas, “peoples accountability foras” in Eight (8) district local Governments (Isingiro, Kumi, Lira, Lyatonde, Kayunga, Kabaale, Adjumani and Rukungiri)
Policy Implementation and Coordination
1. The Fourth Presidential Investors’ Round Table (PIRT IV) implementation progress
report was finalized and discussed by the main PIRT meeting. There was good
progress recorded on joint undertakings between Government and private investors.
2. A final draft Coordination report for FY 13/14 has been finalized. The report
highlights the outcomes and challenges of the current Government coordination
mechanisms.
3. The Final draft of the National Coordination Policy was finalized and a Cabinet
Memorandum forwarded to Cabinet.
Office of the Prime Minister Ministerial Policy Statement
Page ix
4. The Public Sector Management sector agreed to common undertakings to guide the
sector in the FY 2015/206.
5. A National Partnership Forum comprising Government and all development partners
was established and launched to guide and ensure alignment of external financial
support to the NDP II and ruling party manifesto.
6. Government and the United Nations County Team jointly developed a UN-
Development Assessment Framework to guide integrated development planning.
The Framework will ensure that Government and UN-Country team deliver as one.
7. Inducted 48 Districts Nutrition Coordination Committees on their roles to expedite
the implementation of the Uganda Nutrition Action Plan.
8. Finalized a UNAP National Advocacy and Communication strategy.
9. Finalized a draft Nutrition Monitoring and Evaluation Strategy.
10. Developed an Issues paper on Nutrition for incorporation in the NDP II.
11. Developed and incorporated the PSM-Issues paper in the NDP II.
12. Developed the PSM-Sector BFP for FY 2015/2016
B) VOTE FUNCTION 1302: DISASTER PREPAREDNESS, MANAGEMENT AND
REFUGEES
Disaster Preparedness and Management
1. Procured 2,868 acres of land to relocate 1000 households at risk of land slides in the
Elgon region
2. Completed finishes for 25 houses in Kiryandongo
3. Distributed food and non-food relief items to in 31 districts (598,300kgs of Maize
flour and 184,000kgs of beans and 13,960 iron sheets, 7,850tarpaulines, 3,040
blankets, 1,950 jerrycans, 2,700 plastic cups and 2,600 plates, 1,660 mosquito nets
and I,550 saucepans and 150 basins to 24 districts
4. Produced Risk, Hazard & Vulnerability draft reports, profiles and maps for Busoga,
Acholi and West Nile sub regions.
5. Conducted a dissemination workshop on Disaster Preparedness and Management
Policy in Kabarole, Kamuli, Buyende and Luuka districts.
6. Held eight (8) Peace and four (4) Disaster Risk Reduction (DRR) platform meetings
for coordinating disaster preparedness and management activities
7. Launched the mini NECOC at Postel building during the celebrations to mark the
DRR week
8. Carried out Simulation exercises to test NECOC.
9. Produced a Draft Disaster Management Bill
Office of the Prime Minister Ministerial Policy Statement
Page x
10. Completed back filling of two acres of land at Namanve which has facilitated
commencement of the preliminary construction works of National Store
11. Trained DDMCs and DDPCs for Iganga, Busia, Butaleja, Ngora & Kanungu
districts
12. Organized 3 regional trainings on DRR in conjunction with Education sector for
districts of Karamoja, Acholi & West Nile, and Western & South Western Uganda.
13. Carried out disaster assessments in the districts of Namutumba, Buhweju, Kumi,
Moyo, Koboko, Nebi, Kabale, Rakai, Amuria, Rukungiri, Mbarara, Alebtong,
Bukomansimbi, Rubirizi districts
Produced a situational report highlighting the effects of “Marburg and Ebola” epidemics
Refugees Management
1. Demarcated thirty (30,000) plots for settling 141,000 refugees
2. Surveyed Kiryandongo refugee settlement
3. Carried out renovation works on six (6) staff houses in Kyangwali settlement camp
4. Registered and received 34,650 South Sudanese refugees.
5. Supplied refugees and host communities’ twenty three thousand (23,000) seedlings
to improve their livelihood.
6. Carried out four (4) missions in the South west sub region (Kyangwali, Kyaka 2,
Rwamwanja, Nakivale and Oruchinga)
7. Provided 3,827 refugees with IDs and issued 35 refugees with CTDs
8. Carried out fifteen (15) OPM/UNHCR supervisory missions to South West and West
Nile
9. Conducted one monitoring mission to South Western sub-region to agree on new
environment interventions
10. Held 7 REC Sessions in Jinja district where 9,805 individuals in 5,116 households
were granted individual refugee status
11. Facilitated the Hon. Minister to travel to Geneva with Commissioner for Refugees to
attend the EXCOM from 26th Sep. to 1st October 2014.
12. Conducted Asylum profiling for 3090 individual Refugees.
13. Resettled 15,614 Congolese Refugees in Rwamwanja and Kyangwali Refugee
Settlements.
C) VOTE FUNCTION 1303: MANAGEMENT OF SPECIAL PROGRAMS
C1 Northern Uganda
Office of the Prime Minister Ministerial Policy Statement
Page xi
The key achievements realized under each of the projects implemented in Northern Uganda
include:
Post-war Recovery and Presidential Pledges
1. Procured and distributed six (6) hydra form machines
2. Procured and distributed three thousand one hundred forty five (3,145) cattle under
the restocking programme for the four sub-regions of Northern Uganda (Acholi,
Lango, Teso and West Nile). The restocking programme started in FY 2013/14 and
so far 17,899 cattle have been procured and distributed to the beneficiaries. The
target up to the end of FY 2014/15 is 36,499.
3. Procured and delivered thirty one thousand (31,000) hand hoes for women and youth
groups
4. Procured and delivered four hundred (400) sewing machines for women and youth
groups to OPM stores
5. Procured and delivered three thousand (3,000) bags of cement and five thousand
(5,000) iron sheets to OPM stores
6. Held eight (8) sub regional meeting at Gulu regional office to review PRDP work
plans
7. Carried out one (1) monitoring visit on the restocking program for the Northern
Ugnada in the sub-regions of West Nile, Lira, Acholi and Teso.
8. Disbursed UGX 0.8bn to the beneficiary districts as operational funds for the
restocking programme
9. Held three PRDP TWG meetings to review Local Government PRDP work plans.
10. Held six monthly coordination meetings at OPM, Gulu and Soroti regional offices to
harmonize PRDP work plans.
11. Held one training session for 150 beneficiaries of Hydra form technology at Abia
institute in Alebtong district.
ALREP
1. Conducted Exit training for ALREP staff
2. Conducted a Regional Closure workshop in Gulu
3. Organized the 12th Programme Steering committee meetings
4. Trained 78 (36m/42f) beneficiaries in animal traction in Akokoro Sub County, Apac
district.
5. Distributed 37 long horned oxen to 143 (85m/63f) beneficiaries in Akokoro sub county,
Apac district.
6. Consultants from Kawanda Research Station trained 371 (251m/120f) progressive
farmers from Lango sub region in practical value addition.
Office of the Prime Minister Ministerial Policy Statement
Page xii
7. Distributed 98 kg of groundnut foundation seeds to 7 groups of progressive farmers in
Apac, Kole and Oyam districts.
8. Trained 11 district production staff from Apac, Kole and Oyam districts on artificial
insemination
9. Distributed 26 dairy heifers to 26 progressive farmers in Aduku and Ibuje sub counties
in Apac district.
10. Distributed 146 bags of Napier grass and 10.5 kgs of Calliandra to 42 progressive
farmers.
11. Trained 187 (125m/62f) progressive farmers on basic animal husbandry in preparation
for receiving dairy animals.
12. Trained 316 (176m/140f) farmers on animal traction, trained 41 pairs of oxen and made
39 yokes, 12 strops, 10 ox-chains, 6 controlling ropes and 14 halters in Alebtong and
Otuke district.
13. Monitored VSLAs groups in which savings reached UGX 20,714,000 and loan amount
of UGX 18,546,000 during the quarter.
14. Trained 176 (70m/106f) members from 11 groups on financial linkages with Micro
finance institutions in Apac, Kole and Oyam districts.
15. Supplied 830 bicycles for the Project Management Committees in Acholi, Lango and
Teso sub regions.
16. Completed the construction of 6 Produce Stores and latrines in Koch Goma Sub County
in Nwoya District; Pabbo Sub County in Amuru District, in Laguti and Purongo sub
counties in Pader District and in Lapono and Adilang Sub Counties in Agago District
17. Completed the fencing of valley dam in Akwang Sub County, Kitgum District
18. Completed the construction of 02 shallow wells in Apala Sub County in Alebtong
Districts
19. Completed the construction of 7 markets of 40 stalls each in Patongo and Alero sub
counties in Agago district, in Atanga Sub County in Pader District, in Morungatuny and
Kuju Sub Counties in Amuria district, in Koro Sub-County in Gulu District, and in
Alero Sub-County in Nwoya District; and 07 markets of 80 stalls each in Palabek Kal in
Lamwo district, in Mucwini sub county in Kitgum district, in Palabek Gem sub county
in Lamwo district, in Abok sub county in Oyam District, in Bungatira and in Unyama
Sub Counties in Gulu and in Toroma sub county, Katakwi district
20. Completed the construction of 02 Agricultural/community centres in Puranga and Lapul
sub counties in Pader District
21. Completed the drilling of 15 boreholes with cattle troughs in Agago, Amuru, Kitgum,
Lamwo, Nwoya, Otuke, Katakwi and Amuria districts and 01 borehole without cattle
trough in Kole district
22. Completed the construction of 01 warehouse at Elegu in Atiak Sub County, Amuru
District.
Office of the Prime Minister Ministerial Policy Statement
Page xiii
23. Completed the construction of 01 slaughter slab, 2-stance VIP latrine, and fencing of 03
sub county production offices in Iceme, Aleka and Acaba in Oyam district
24. Captured the geo references of projects in Gulu, Amuru and Nwoya districts.
25. Verified the output of CESVI grant for developing productive infrastructure and assets
to improve agriculture production and profitability in Lango sub region.
26. Verified the output of ACTED grant for building productive infrastructure to support
agriculture and livelihoods in Amuru, Nwoya and Gulu Districts.
27. Conducted impact studies on ALREP support on strengthening the capacity of District
Local Government and implementing Labour intensive works in 15 districts in Acholi,
Teso and Lango sub regions.
28. Supplied 73 agro-processing equipments through matching grants to agro-processors in
Acholi, Lango and Teso sub regions
29. Completed the improvements of 88 Agro-input shops for agro-input dealers
30. Supported the licensing of 88 Agro-input shops and 88 agro-input dealers
31. Constructed 2-stance VIP latrine at Elegu warehouse, 5 stance VIP latrine at Kole fish
market
32. Conducted ALREP closure workshop involving officials from the 15 ALREP
operational districts, EU Delegation, MoFPED, OPM, Steering committee and the
media.
33. Trained 15 District Focal Point Officers and 15 Clerk of Works from the 15 ALREP
operational districts in computer operations.
34. 2Trained 30 districts technical staff and 30 political leaders (LCV Chairpersons and
RDCs) of the 15 ALREP operational districts in computer operations
35. Trained 90 District technical staff of 15 districts Acholi, Lango and Teso sub regions in
Environmental issues
36. Procured 830 bicycles for PMCs in the various projects in 15 districts of Acholi, Lango
and Teso.
37. Procured and distributed Livestock equipment and tools to the 15 districts of Acholi,
Lango and Teso sub regions.
38. Collected UGX 12,738,750 from 43 beneficiary mini-groups in Apac, Kole and Oyam
districts as cost-share contribution for procurement of ox-planters, ox-weeders and ox-
harrows.
39. Disseminated the findings of Value Chain Analysis survey to 135 district staff and
farmers in Apac, Kole and Oyam districts
40. Created linkages among 88 famers and produce buyers from Apac and Kole in order to
improve information about access market for agricultural produce.
41. Procured 9 grinding mills at UGX 70,223,400 for value addition in Apac, Kole and
Oyam districts
Office of the Prime Minister Ministerial Policy Statement
Page xiv
42. Fabricated and distributed 100 ox-carts to74 farmer groups and 8 bulking stores in
Apac, Kole and Oyam districts
43. Trained 45 farmers in operation and maintenance of the grinding mills in Apac, Kole
and Oyam districts.
44. Developed and distributed guidelines for reference on Farmer Level Seed
Multiplication System in Apac, Kole and Oyam districts.
45. Procured and distributed Artificial insemination items aimed at improving the local
breeds of livestock in Apac, Kole and Oyam districts.
46. Trained 54 Community Animal Health Workers (CAHWs) in Apac, Kole and Oyam
districts on disease diagnosis, prevention and surveillance
47. Collected UGX 46,458,000 from 87 progressive farmers as cost-share contribution for
the dairy animals and UGX 2,280,000 from 38 progressive farmers for pastures grazing
land in Apac, Kole and Oyam districts
48. Distributed 157 dairy animals (75% crosses of Friesian breed) to progressive farmers in
Apac, Kole and Oyam districts
49. Trained 70 progressive farmers in Apac, Kole and Oyam districts in establishments and
management of napier cuttings and calliandra grass seeds for feeding the dairy heifers.
50. Trained 81 members from nine dairy associations to promote dairy production within
Oyam, Kole and Apac districts.
51. Distributed milk equipment to dairy associations in Apac, Kole and Oyam districts
52. Trained 230 progressive farmers in Apac, Kole and Oyam districts on basic animal
husbandry practices and feed formulation
53. Distributed 60 ox-weeders and 60 ox-harrows to 60 farmer groups of 430 progress
farmers in Lira, Alebtong and Otuke
54. Disseminated the findings of Value Chain Analysis to 41 progressive farmers in
Alebtong district
55. Established links of 225 input dealers and produce buyers of cassava stems and tubers,
oil seeded crops and agricultural chemicals and improved seeds in Lira, Alebtong and
Otuke
56. Distributed 31 ox-carts to progressive farmers in Lira, Alebtong and Otuke districts
57. Distributed and installed 5 grinding mills, 1 maize sheller and 3 rice shellers and hullers
at UGX 76,393,400 for value addition in Lira, Alebtong and Otuke districts
58. Trained 65 operators in operation and maintenance of value addition machinery in Lira,
Alebtong and Otuke districts
59. Rehabilitated 13.5 km Adipala Agonga Road in Amuria district
60. Completed fencing of Akwang valley dam in Kitgum District
61. Completed 02 shallow wells in Apala Sub County, Alebtong District
Office of the Prime Minister Ministerial Policy Statement
Page xv
62. Completed 01 cattle crush in Apoi, Akokoro Sub County, Apac District
63. Distributed moisture meters (7), tarpaulins (14), pallets (56), weighing scales(7),
sampling spears(7) and record books (7) for improving post harvest handling during
storage
64. Distributed 75 ox carts to progressive farmers in Lango sub region.
65. Completed construction of 74 km of community access roads in Apac, Lira, Kole and
Oyam districts.
66. Paid UGX 316,776,792 for Cash for Work and UGX 557,707,325 for the
mechanisation during opening / rehabilitation of community access roads.
67. Completed the construction of 4 District Production offices in Kole, Oyam, Agago and
Lamwo districts
68. Completed the construction of 2 Sub-county production offices in Ngariam and
Kapujan sub counties in Katakwi District
69. Completed the construction of 01 Animal and Plant Diagnostic Laboratory in Amuria
district
70. Completed the fencing of the District Production Office in Amuria District
71. Supplied and installed solar power units in 5 District production offices of Amuru,
Nwoya, Agago, Lamwo & Kole and 20 Sub County production offices in Kitgum,
Pader, Lira, Otuke, Alebtong, Katakwi and Amuria Districts
72. Drilled 27 boreholes (15 new and 12 rehabilitated) in Apac, Lira, Kole and Oyam
districts.
73. Completed construction and technical handover of 14 cattle crushes in Apac (6), Lira
(4) and Oyam (4).
74. Completed construction and technical handover of 12 latrines at market centres in Apac
(3), Lira (3), Kole (3) and Oyam (3).
75. Completed construction of 04 markets with water harvesting facilities and a 5 – stance
76. Constructed drainable latrine, in each in the sub counties of Abarilela in Amuria
District, Usuk in Katakwi District and Patongo in Agago District
77. Completed construction of 01 warehouse in Elegu, Atiak Sub county in Amuru District
78. Completed construction of 02 Agricultural produce stores and 2 – stance drainable
latrines in Lapono and Adilang Sub Counties, Agago District
79. Completed 01 animal and plant diagnostic laboratory in Amuria Town Council in
Amuria district
80. Completed 01 slaughter slab with 2-stance drainable latrine, waste pits and incinerator
in Aduku Sub County, Apac District and one slaughter slab, 2-stance drainable latrine,
waste pit and incinerator in each of the sub counties of Acaba, Iceme and Aleka in
Oyam District.
Office of the Prime Minister Ministerial Policy Statement
Page xvi
81. Procured office supplies (office stationery, equipment and tools) to 6 districts of Gulu,
Agago, Amuru, Pader, Lamwo and Amuria
82. Subscribed for internet access for 1 month for 15 ALREP operational districts in
Acholi, Lango and Teso sub regions
83. Procured equipment, stationery and printer cartridges for Gulu, Amuria, Lamwo,
Amuru, Pader and Agago districts
84. Conducted interviews and filming of the TV documentary to showcase ALREP’s
achievements.
85. Conducted interviews of stakeholders and beneficiaries for the development of ALREP
story book
Karamoja sub region
The achievements registered by the projects implemented in Karamoja sub-region include:
Karamoja Intergrated Development Programme (KIDP)
1. Disbursed funds for the construction of ten (10) valley tanks to Ministry of Water
and Environment (MoWE) and work are on going
2. Procured and distributed one thousand two hundred fifty (1,250) Ox-ploughs
3. Procured and distributed one thousand (1,000) heifers for selected groups in Karamoja
4. Procured and distributed two thousand (2,000) Oxen to farmers in Karamoja
5. Branded thirteen thousand (13,000) cattle in Karamoja
6. Supported Uganda Prison Services (UPS) to open land for production of food for
feeding program for primary schools in Karamoja sub-region. So far three hundred
fifty (350) tons of maize have been harvested
7. Procured and distributed five hundred and fifty (550) sewing machines for women
and youth groups
8. Procured one (1) Station wagon for the Hon. MSKA
9. Conducted three (3) KIDP TWG regional meetings.
10. Conducted eight (8) National KIDP TWG meetings.
11. Facilitated one Elders’ meeting.
12. Facilitated one exposure visit and study tour for North Karamoja Mothers Union.
13. Facilitated the evaluation of the Disarmament exercise in Karamoja which was
conducted by Ministry of Defence as per KPC resolution.
14. Facilitated two monitoring exercises of Government programs and mobilization
visits
15. Conducted one peace and security meeting which was chaired by HE the President at
Morulinga State Lodge
16. Facilitated two meetings with selected farmers and agricultural officers to determine
appropriate technology.
17. Supported UWESO to look after 30 homeless Karimojong children.
Karamoja Livelihoods Program (KALIP)
1. Conducted one(1) regional closure workshop
Office of the Prime Minister Ministerial Policy Statement
Page xvii
2. Organized the 12th Programme Steering committee meeting
3. Supported 5 monitoring trips for district officials
4. Supported 3 inter-district meetings
5. Distributed 9 refrigerators to the districts of Amudat (3), Kaabong (2), Kotido (2) and
Nakapiripirit (2) for animal health improvement.
6. Distributed 1,560 T-Shirts to the school and community crime prevention clubs/groups.
7. Released UGX 2,550,000 to the DPCs of Amudat and UGX 2,836,000 for Nakapiripirit
for community policing activities
8. Conducted interviews of stakeholders and beneficiaries for the development of KALIP
story book.
9. Conducted interviews and filming for production of a documentary on KALIP success
that will be serialised on NTV Uganda to improve KALIP visibility.
10. Excavated 20 valley tanks as follows: Akado in Abim Sub County in Abim district,
Akurion-Pilil in Amudat Sub County in Amudat district, Longurangole in Kapedo Sub
County in Kaabong district, Nadomeit in Kaabong East Sub County in Kaabong
district, Nasak-Napura in Panyangara Sub County in Kotido district, Nakonyen in
Tapac Sub County in Moroto district, Sakale in Nabilatuk Sub County in Nakapiripirit
district, Nagirongole in Lotome Sub County in Napak district, Kakutalem in Ngoleriet
Sub County in Napak, at Lomogol and Lokitelaekoroit in Nakapiripirit district,
Kangorok and Waliwal in Kotido district, Akeler and Puno in Abim district, Lokithile
and Akwapua in Moroto district, Lodoon and Nangirongole in Napak district
and Lokirimo and Kalopungongole in Kaabong district district.
11. Trained Water User Committees for the valley tanks in Abim, Kotido and Kaabong
12. Completed and commissioned Kangole police station in Napak district commissioned
by Minister of Karamoja Affairs
13. Furnished Kangole police station with office tables, chairs and filing cabinets
14. Completed fencing of 7 police posts of Kanu in Abim district, Karita in Amudat
district, Lobalangit in Kaabong district, Kacheri in Kotido district, Rupa in Moroto
Moroto district, Lolachat in Nakapiripirit district and Lokopo in Napak district
15. Drilled and installed 5 boreholes at police posts of Kanu in Abim district, Kacheri in
Kotido district, Rupa in Moroto district, Lolachat in Nakapiripirit district and Lokopo in
Napak district
16. Drilled boreholes at Kanu, Kacheri and Rupa police posts to provide clean water for
police officers.
17. Constructed 1 regional veterinary laboratory in Moroto
18. Constructed 1 district production office Amudat
19. Constructed a production office at Karita sub-county
20. Returned 40 contractors to rectify defects observed at their sites
Office of the Prime Minister Ministerial Policy Statement
Page xviii
21. Installed 16 solar power units at 12 sub-county and 4 district production offices
22. Supplied an assortment of veterinary laboratory equipment to 7 districts and cold-chain
and animal vaccination kits to sub-county production offices
23. Supplied 1 deep freezer and 2 big refrigerators to regional laboratory
24. Supplied and 1 installed solar power at the regional veterinary laboratory
25. Completed the construction and technical handover of Alerek and Abim sub county
production offices in Abim district.
26. Rectified the defects on completed production offices in Kaabong, Nakapiripirit and in
Amudat district.
27. Completed the construction and technical handover of Lokopo police post.
28. Construction of Kangole police post progressed to the level of plastering
29. Completed the perimeter fencing of Kanu police post in Abim district.
30. Distributed assorted furniture to all the 30 Sub-County and 7 district production offices
comprising 103 office desks, 103 office chairs, 194 guest chairs, 74 conference tables,
296 conference chairs and 103 filing cabinets.
31. Supplied and installed solar power units at 10 Sub County/Town Council and 2 District
Production Offices in Karamoja
32. Supplied furniture to Moroto regional laboratory
33. Supplied wireless internet modems to 7 district production offices
34. Distributed 9 refrigerators to the districts of Amudat (3), Kaabong (2), Kotido (2) and
Nakapiripirit (2) for animal health improvement. S
35. upplied and installed solar power units at 10 Sub County/Town Council and 2 District
Production Offices in Karamoja
Dry lands Integrated Development Project
1. Conducted a baseline survey in the 4 project districts of, Nakapiripirit, Napak, Moroto
& Amudat to provide the initial data/information to inform project implementation
2. Paid Technical fee to MDA Centre of UgX440,000,000
3. Paid contract staff salaries a total of Ugx 581,234,500 for Nov 2014 to March 2015
C3 NUSAF 2
1. Disbursed a sum of UGX 26,216,143,686 to districts as operations fund and to
facilitate EPRA processes in Karamoja Districts;
2. Received Subproject accountability which is at 83.8% and subprojects completion
status at 83.2%.
3. Oriented 6 NDOs of new districts to NUSAF2 operations.
Office of the Prime Minister Ministerial Policy Statement
Page xix
4. Completed 33 CIR subprojects were commissioned in Karamoja sub region.
5. Held 3 Technical working committee meetings.
6. Produced 5 page supplements in the New Vision on NUSAF2 in Acholi and
Bunyoro.
7. Produced 2 Articles in the East African and 3 Full Page story series in the Monitor.
8. Produced 4 half page story series in the New Vision and produced 2 Publications in
the New Vision on impact of NUSAF2 in Teso, Bukedi and Elgon sub regions.
9. Produced 1 Article on commissioning of NUSAF2 in Karamoja.
10. Supported UMCAT student writing contest on NUSAF2
C4 Luwero-Rwenzori
1. Paid 8,496 civilian veterans a one off gratuity
2. Disbursed grants worth UGX4.4bn to the sixteen (16) LRDP districts (Kasese,
Kabarole, Ntoroko, Bundibugyo,Kyenjojo, Kyegegegwa ,Mityana ,Mubende,
Kiboga ,Kyankwanzi, Luwero, Kayunga, Mukono, Nakasongola,Nakaseke and
Wakiso) to support community driven enterprises to enhance their household
incomes
3. Facilitated thirty two (32) micro projects to enhance household incomes for youth,
women and farmer groups, and PWDs0
4. Established eight (8) crop nurseries and seven (7) mother gardens in former war
zones (Butambala, Lwengo, Mukono, Kiboga and Nakaseke districts)
5. Completed 50% of the construction works for Nalutuntu Health Centre III
6. Undertook twelve (12) technical support supervision and monitoring missions in 43
district local Governments of LRDP
7. Undertook four (4) political monitoring missions in the Luwero Rwenzori sub-region
8. Undertook 1 Monitoring and supervision mission of the anti-poverty campaign.
9. Held 3 series of meetings with district technical staff in Kabarole, Luwero &
Wakiso to harmonize LRDP district work-plans
10. Held three (3) LRTWG meetings.
C5 Bunyoro Affairs
1. Finalized the draft Bunyoro Integrated Affirmative Development Plan (BIADP)
which is ready for Cabinet approval. The plan highlights Government proposed
costed strategic interventions in this sub region and provides a roadmap for
implementation with clear time lines.
2. Procured and distributed three thousand (3,000) hand hoes for the vulnerable groups
Office of the Prime Minister Ministerial Policy Statement
Page xx
3. Completed the renovations and furnishing of the liaison office in Hoima office which
was commissioned.
4. Undertook eight (8) political monitoring and supervision missions of Government
development programs and projects in the sub-region
5. Undertook two (2) bench marking visits
C6 Teso Affairs
1. Finalized the draft Teso Development Plan (TDP) which is ready for Cabinet
approval. The plan highlights Government proposed costed strategic interventions in
this sub region and provides a roadmap for implementation with clear time lines.
2. Procured one Hydra form machine for Serere districts.
3. Procured 1160 bags of Cement for religious institutions
4. Procured 2500 Iron sheets for Tisai Island
5. Held one Policy Committee Meeting
6. Held three coordination meetings at OPM Soroti regional office
7. Held three (3) PRDP performance monitoring exercises for Teso sub-region
8. Transferred UGX 0.280 billion to Kumi District Local Government (o/w UGX
0.260Bn for training of youth in Hydraform technology and construction of
Mukongoro Police Post and Police staff quarters and UGX 0.02Bn roofing of
Omatenga Antenatal Unit)
Office of the Prime Minister Ministerial Policy Statement
Page xxi
D. VOTE FUNCTION 1349 ADMINISTRATION AND SUPPORT SERVICES
1. Produced fourth Quarter and Annual Performance Progrss Report Performance for
FY 2013/14,Quarter one (1) and Quarter two (2) progress reports for FY 2014/15
2. Completed and submitted Final Accounts for FY 2013/14 to Accountant General
3. Facilitated eight (7) Top Management and 22 Heads of department meetings.
4. Retired 96 % of Accountabilities.
5. Implemented Audit recommendations.
6. Responded to PAC queries of FY 2012/13
7. Labelled equipment and updated Assets register.
8. Developed Draft Training Policy and Guidelines.
9. Developed training plan for FY2014/15
10. Procured sixty one (61) Desk tops, sixteen (160 laptops, twenty three (23)
Tablets/Ipads I Mac for OPM and sixteen (16) firewall licenses
11. Procured and catalogued nine hundred twenty (920) new library documents
12. Participated in the annual Cancer Run on 31st September 2014
13. Developed concept paper on Gender Mainstreaming in OPM
14. Operationalized the new modern OPM library and Resource center.
15. Facilitated OPM website and social media platforms where at least one new news
article is published every day
16. Produced the Draft of OPM Risk management Plan.
Planned Priorities for FY 2015/16
The Office of the Prime Minister during the FY 2015/2016 expects to achieve the following
outputs through its respective Vote Functions.
A) VOTE FUNCTION 1301: POLICY COORDINATION, MONITORING AND
EVALUATION
Executive Office (Prime Minister, 2nd Deputy Prime Minister and Government Chief
Whip)
1. Strategic coordination meetings organized and facilitated. (Policy Coordination
Committee-PCC, Policy Committee on Environment - PCE, Presidential Investors’
Round Table – PIRT, Prime Minister’s Private Sector Forum, and many other
coordination platforms and meetings).
Office of the Prime Minister Ministerial Policy Statement
Page xxii
2. Government Business in Parliament coordinated, parliamentary proceedings
monitored and the whipping capacity strengthened.
3. Political monitoring of implementation of government policies and programmes in
the districts undertaken.
4. Prime Minister’s Delivery Unit established which will institute a framework for
signaling government priorities and providing visible internal focus for all MDAs
5. International engagements of the Executive Office facilitated.
6. Public Relations and Communications of the Office of the Prime Minister effectively
managed.
Information and National Guidance
1. Two (2) Media Policies reviewed.
2. One hundred (100) Public education programmes on radio and TVs coordinated.
3. Twelve (12) consultative meetings with media owners, editors and reporters to
improve Government-Media relations held
4. Fifty two (52) Weekly Publicity coordination meetings held to harmonize press
releases and press conferences.
5. Twelve (12) monthly magazines for Ministry of Information and National Guidance
produced.
6. Four (4) Quarterly Newsletter produced.
7. Twelve (12) sensitization sessions on social media support held
8. Access to Information Act implemented and fast tracked.
9. Fifteen (15) Supervision field trips undertaken to strengthen the link between Central
Government and the District Information Officers.
10. 8 MDAs supported in developing respective communication strategies.
11. The production and dissemination of fifteen (15) audio-visual messages coordinated.
12. 1,500 copies of Information Education Communication materials on National
Guidance produced.
13. National Values, National Objectives, National Interest and National Common Good
propagated in 45 Primary Teachers Colleges.
14. Draft National Guidance Policy produced and approved.
15. Sensitization on National signs and symbols, National anthem and National identity
carried out.
16. Research on public understanding of National Guidance issues conducted in four
regions.
17. Six double cabin pickups procured
Office of the Prime Minister Ministerial Policy Statement
Page xxiii
Monitoring and Evaluation
1. National Monitoring & Evaluation Policy implemented
2. 8 National Technical Working Group and Subcommittee meetings on Evaluation and
Monitoring & Oversight (M&O) conducted.
3. Government Annual Performance Report for FY 2014/15 and Half Annual
Performance report for FY 2015/16 produced and discussed during the respective
Government Performance Retreats.
4. Citizens’ information fora (Barazas) carried out in 32 districts.
5. National Integrated Monitoring and Evaluation Strategy (NIMES) implemented.
6. The Government Evaluation Facility (GEF) to strengthen the evaluation functions in
Government maintained.
7. Evaluation of 2 key policies or programmes/projects conducted;
8. Partnership Policy M&E framework developed;
9. A functional M&E Management Information System (MIS) established
Policy Implementation and Coordination
1. Progress report on the implementation of recommendations of the Fifth Presidential
Investors’ Tables (PIRT V) produced.
2. Delivery Unit supported through Government Coordination Framework Mechanism.
3. Evaluation of the Presidential Investors’ tables PIRT I to PIRT IV carried out
4. Evaluation of the Institutional Coordination Framework conducted.
5. Coordination of Platforms (National Partnership Forum, GOU-UN Engagement,
GOU- SME etc ) operationalized.
6. National Coordination Policy approved and operationalized
7. Joint Public Sector Management Review (JPSMR) for FY 2014/15 conducted.
8. Sector Plans aligned to the NDPII and the ruling party manifesto.
9. Report on Implementation of the Uganda Nutrition Action Plan (UNAP) produced
10. Nutrition Forum (2015) held
11. Public Sector Management -Sector BFP developed.
Office of the Prime Minister Ministerial Policy Statement
Page xxiv
B) VOTE FUNCTION 1302: DISASTER PREPAREDNESS, MANAGEMENT AND
REFUGEES
Disaster Preparedness and Management
1. Nine hundred (900) households at risk of landslides in the Elgon sub region resettled
in Bulambuli
2. One thousand five hundred (1500) acres of land purchased.
3. Preparation of ground and construction of wall fence for the planned NECOC in
Namanve carried out.
4. One (1) National relief stores in Namanve constructed.
5. Fifty (50) district Risk Hazard, Vulnerability and disaster assessment report, profile
and maps produced.
6. Emergency assessments and provision of 20,000 MT of relief food and 5,000
assorted non-food relief items for disaster victims procured.
7. Disaster Preparedness and Management Bill developed.
8. One (1) Twelve (12) Ton truck, two (2) Trailers and one double cabin pick up
procured
9. Development and implementation of one National and fifty (50) Districts Disaster
Preparedness and Contingency Plans
10. Resettlement of 900 families of Ugandans expelled from neighbouring countries and
other landless persons.
Refugees Management
1. Sixty thousand (60,000) new refugees received and re-settled
2. Twelve thousand (12,000) new plots demarcated for settling refugee new arrivals
3. One thousand five hundred (1500) Refugee and 300 host community House Holds
supported with seedlings
4. Two (2) livelihood sensitization meetings conducted in refugee settlements
5. Ten thousand (10,000) Asylum seekers profiled
6. Twelve (12) Refugee Eligibility Committee meetings, 12 Eligibility sessions and12
Refugee Appeals Board sessions held
7. Twelve thousand (12,000) Refugees provided with Identity and 1500 refugees
provided Conventional Travel documents
8. One thousand two hundred (1200) Counselling sessions for refugees conducted
9. Contribution to international organizations done
10. One (1) Tripartite meeting with Congo government held
11. Alternative durable solutions for protracted refugee caseloads implemented
Office of the Prime Minister Ministerial Policy Statement
Page xxv
12. Voluntary repatriation of Congolese refugees conducted
13. Systematic survey of Nakivale Refugee Settlement undertaken.
14. Quarterly livelihood monitoring missions conducted
15. Ten (10) OPM staff houses in Nakivale renovated
16. National Refugee Policy Developed
C) VOTE FUNCTION 1303: MANAGEMENT OF SPECIAL PROGRAMS
C1 Northern Uganda
The key planned priorities under each of the three projects implemented in Northern Uganda
include:
Post-war Recovery and Presidential Pledges
1. Seven hundred (700) Oxen for youth and women groups to promote Commercial
agriculture procured.
2. One thousand (1,200) ox ploughs for youth and women groups to promote
Commercial agriculture procured.
3. Thirty four thousand (34,000) hand hoes procured for women and youth groups and
other farmers.
4. One hundred (100) Cassava chippers for youth and women groups Procured.
5. Ten thousand (10,000) bags of cement for special interest groups/institutions
procured.
6. Butaleja Produce Store construction works completed.
7. Six hundred (600) bicycles procured for selected youth and religious leaders
8. Eighteen thousand six hundred (18,600) cattle for restocking the Sub regions of West
Nile, Lango, Teso and Acholi procured.
9. Lango Chiefs Complex (Palace, offices and cultural center) construction works
completed.
10. Thirty three (33) Low cost houses for vulnerable groups (former IDPs) in Northern
Uganda constructed
11. Five hundred (500) Sewing Machines for Women and Youth groups procured.
12. Five (5) tractors for distribution to farmer groups procured.
13. One hundred sixty (160) Motorcycles for distribution to selected youth groups and
religious leaders procured.
14. Installation of solar power completed for the Fifty four (54) Acholi Chiefs houses
15. Two hundred (200) bicycle repair kits and 200 motorcycle repair kits procured
Office of the Prime Minister Ministerial Policy Statement
Page xxvi
C2 Karamoja Sub Region
The key planned priorities under each of the three projects implemented in Karamoja sub-
region include:
Karamoja Intergrated Development Programme (KIDP)
1. 2,000 Heifers procured and distributed
2. 1,600 Oxen for farmer groups procured and distributed
3. 800 Ox-ploughs procured and distributed.
4. Ten (10) parish valley tanks (Parish dams) constructed
5. 100 bulls and 100 Heifers for Cattle breed improvement for selected farmers
procured and distributed in Collaboration with Nabwin.
6. Five hundred (500) improved HE goats provided to farmers in Karamoja sub-region
7. 25,000 Cattle in Karamoja branded.
8. Irrigation water provided to sixteen (16) famers in Karamoja
9. 1,000 bags of cassava cuttings procured and distributed to farmers in Karamoja
10. Five (5) dormitory blocks for selected primary school in Karamoja constructed.
11. Uganda Prison Services supported to produce food for schools in Karamoja .
12. Six (6) cattle dips constructed
13. Ten thousand (10,000) Iron sheets procured
14. One (1) tractor for Koblin Rehabilitation Centre procured
15. Koblin Rehabilitation Centre supported with UGX. 0.2bn
16. Fifty (50) housing units constructed for grinding machines for youth and women
groups
17. Two (2) double cabin pickups, and one (1) station wagon procured
18. Twenty (20) micro projects supported
19. Eight (8) kitchens constructed in selected schools in the sub region
20. 7000 Basins and 7000 Jericans procured and distributed
C3 Dry lands integrated development project
1. Continued capacity building and equipping of 20 community agricultural and 20
community livestock workers undertaken ,
2. 1 community managed artificial insemination centre established,
3. 6 farmer training and demonstration centres established,
4. 40 tons of subsidised agricultural planting seeds procured and distributed,
Office of the Prime Minister Ministerial Policy Statement
Page xxvii
5. 80 tons of subsidized fertilizers procured and distributed,
6. 80 nr improved goat and shoal breeds procured and distributed
7. 80 nr improved cattle breeds procured and distributed
8. 2 tree nurseries established for natural resource management
9. 10 micro irrigation kits installed
10. Water management interventions initiated
11. 2 rounds capacity building trainings to government extension staff done
12. Community mobilization and institutional capacity development, gender trainings
done in agriculture and Environment
13. 1 piped water scheme based on a motorized borehole(s) constructed
14. 3 parish level valley dams/tanks constructed
15. 4 village level water ponds constructed
16. 15 solar mini-grid systems set up
17. 150 energy saving household cooking stoves distributed/built
18. 20 biogas units built
19. 1 farmer training and information centre set up
20. 2 rounds community capacity building in implementation and management of
infrastructure activities conducted
21. Community mobilisation and extension work in energy, infrastrcture and ICT
offered
22. Support the operations of training and operations of 90 community health workers
23. Medical drugs and supplies to 7 Health Centres procured and distributed
24. 1 Round refresher training of 50 health workers conducted
25. 6 rain water harvesting systems in primary schools installed
26. 4 school boreholes sunk
27. Installation 4 solar systems in 4 schools done
28. Sustainable school feeding program initiated in 15 primary schools in partnership
with other development partners.
29. Provision of post primary scholarships for 120 girls rolled out
30. Educational Materials for schools procured
31. 2 teacher of refresher training conducted
Office of the Prime Minister Ministerial Policy Statement
Page xxviii
32. Community mobilization and institutional capacity development, gender and
extension workers in Pre Primary and Post Primary education institutions and
Education workers program conducted.
33. Formation and/or facilitation of Legalization and functioning of 5 farmer and
business groups and/or cooperatives (grain banks, facilities) done
34. Facilitation of the formation of 1 savings and credit cooperative organisation done
35. Provision of vocational and business skills training to 40 former cattle rustlers done
36. Construction of 1 community grain warehouse done
37. 2 Milk collection centers constructed and functionalized
38. 1 livestock slaughter sites set up.
39. Construction of 2 staff housing blocks each 4 units in health centers done
40. Construction of 2 outpatient departments (OPD) and 2 patient wards in health centres
done
41. Construction of 2 blocks of dormitories in model primary schools done.
42. 3 blocks of classrooms constructed
43. Construction of 15 low cost school kitchens with institutional cookstoves in 15
primary schools done.
44. Construction of 5 nr-5 stance VIP Latrine facilities in 5 schools done.
45. 20 km of community access roads opened,
46. 10 km of community access roads rehabilitated
47. 1 nr 4-wheel drive ambulance station wagon vehicle procured,
48. 8 nr 100-125 cc motor cycles procured,
49. 1 nr 4-wheel drive double cabin pick up vehicle procured,
50. 2 nr 4-wheel drive station wagon vehicles procured
51. Medical Equipment for 4 health centres procured
C4 Luwero-Rwenzori
1. 11,000 civilian veterans paid one off gratuity (Akasiimo).
2. Four thousand (4,000) iron sheets procured and distributed to the elderly, institutions
and Civilian Veterans.
3. Four thousand (4000) bags of cement procured and distributed elderly, institutions
and Civilian Veterans.
4. Two Tipper Lorries to support the hydra form yards procured.
5. Ten thousand (10,000) hand hoes procured and distributed to farmer groups.
Office of the Prime Minister Ministerial Policy Statement
Page xxix
6. Two thousand (2,000) spray pumps procured and distributed to selected farmer
groups.
7. Ten (10) crop nurseries and banana mother gardens established for Civilian Veterans
in former war zones.
8. Grants to sixteen (16) LRDP districts to support community driven enterprises to
enhance household incomes disbursed.
9. Sixty (60) Micro projects to enhance household incomes for youth, women, farmer
groups and PWDs supported.
10. Construction of Nalutuntu HC III completed.
11. Regional office constructed in Luwero district.
12. One (1) motor vehicle for monitoring of LRDP procured.
13. Two (2) Benchmarking visits to Asia and African countries undertaken
14. Specialized training through institutions (Enterprise Uganda, USSIA and UCSCU)
offered to beneficiaries of LRDP funds
15. Ten Thousand (10,000) hand hoes procured and distributed
C5 Bunyoro
1. Fifty (50) micro projects to enhance household incomes for youths, women, and
farmer groups and PWDs supported.
2. Thirteen thousand (13,000) hand hoes procured and distributed to farmer groups.
3. Two Thousand (2000) iron sheets procured and distributed
4. Four thousand one hundred (4100) bags of cement procured and distributed
5. One (1) Baseline survey on the impact of oil and gas to the wellbeing of the
communities conducted
6. Four (4) crop nurseries supported
7. Three hundred (300) spray pumps procured and distributed
C6 Teso
1. One hundred (100) Ox-Ploughs procured
2. Construction of Omatenga HC III completed.
3. Construction of Kadami HC III completed.
4. Six thousand (6000) bags of cement procured and distributed.
5. Eight thousand (8000) Gauge 28 ordinary corrugated iron sheets for people of Tisai
Island. Kachumbala and Angasia procured
Office of the Prime Minister Ministerial Policy Statement
Page xxx
6. UGX 0.25Bn transferred to support to Micro Projects for women, youth, elderly and
PWDs
7. 1 double cabin Pick-up for regional office procured
8. Two Policy Committee meetings held
9. Two consultative meetings held
D) VOTE FUNCTION 1349 ADMINISTRATION AND SUPPORT SERVICES
1. Vote 003 Budget Estimates for FY 2016/17 prepared.
2. Vote Ministerial Policy Statement and detailed Budget Estimates for FY 2016/17
prepared.
3. Four (4) performance Quarterly progress Reports produced.
4. Four (4) budget performance reports produced.
5. Four (4) Quarterly Quality Assurance Exercises conducted.
6. Vote 003 BFP for FY 2016/17 prepared and submitted to Public Sector Management
Secretariat.
7. Internal Policy Research and Analysis to generate evidence for implementable Policy
options for the OPM undertaken.
8. Vote 003 Final Accounts for FY 2014/15 produced
9. OPM Risk Management plan finalized
10. OPM HRM matters coordinated
11. Responses to Audit queries compiled
12. Internal Policy, Programme and Project Monitoring and Evaluation undertaken.
13. Short term consultancies on policy development undertaken.
14. Induction training of new employees conducted.
15. OBT, Planning and Budgeting training for budget officers and end users conducted.
16. Report on Review of Final Accounts produced.
17. Report on Accountability and advances review produced.
Office of the Prime Minister Ministerial Policy Statement
Page xxxi
18. Report on Evaluation of internal controls, stores management, cash management &
advances / accountability, fleet management produced.
Office of the Prime Minister Ministerial Policy Statement
Page xxxii
Unfunded Priorities and funding Gap
The Office has a number of unfunded priorities totalling to UGX 551.24 Billion for which
funding has not been provided for in Vote 003 MTEF for FY 2015/16 (The details of these
priorities are provided below).
S/NO Description of the
unfunded priorities
Budget
(Ushs.bn)
Justification
01 Digital Migration Capital
Investment
69.90 It’s an international requirement for all
countries to migrate from Analogue to
Digital. Failure to comply will result into
international black out which will have
adverse consequences on the country.
There is HE directive to MoFPED to
facilitate UBC acquire supplier credit to
the tune of USD 23.3 million to
implement the project
02 Effective Coordination of
Government policies &
\programmes
4.69 Support the operationalization strategic
Coordination Platforms of the National
Partnership Forums, and the Forums of
GOU and UN County Team, the GOU and
NGO and the GUO and Small and
Medium Enterprises.
Kick staring the implementation of the
National Coordination Policy
03 Implementation of M&E
Policy & rolling out the
Baraza initiative
6.00 The implementation of the National M&E
Policy and the Baraza initiative will
require additional resources especially for
the operationalization of the Evaluation
function which has hitherto not been fully
operational, as well as facilitate the roll
out of the Baraza initiative to all LGs in
the country and the inclusion of LGs on
the Government Performance Assessment
process.
04 Full scale implementation
of LRDP
98.00 The full scale implementation of the
LRDP in 43 District Local Governments
requires Ushs108bn every FY. However
since FY 2011/12 the funding level has
been maintained at Ushs10bn which
covers only 14 districts. Additional
funding is needed to roll out the
implementation.
05 Acquisition of land to
resettle 3000 Expellees
from Tanzania, 3,000
vulnerable communities
15.45 HE the President and Cabinet directives to
resettle landless communities of the Benet
in Sebei, the Ndorobos and the Banyoro
that have been displaced over the previous
Office of the Prime Minister Ministerial Policy Statement
Page xxxiii
outside the Elgon region
and emptying of wastes
from drainable toilets in
Bundibugyo
years.
The need to improve the hygienic
condition in the Refugee reception centers
and settlements to avoid outbreak of
epidemics.
06 Presidential Advisory
Committee on Budget
(PACOB)
0.50 HE the President directed that the
Presidential Advisory Committee on
Budget be established under the Office of
the Government Chief Whip but with
funding provided by MFPED (a copy of
the directive attached as Annex)
07 Additional funding for the
Executive Office for
setting up the Prime
Minister’s Delivery Unit
(PMDU)
3.00 This funding is required to enable the Prime Minister and Leader of Government Business to establish a framework for signalling Government
priorities and providing visible internal
focus for all MDAs on key government priorities
08 Anti-Poverty programmes
for Civilian Veterans in
Luweero-Rwenzori sub-
Region.
12.54 HE the Presidents directive on Anti-
Poverty campaign in the Luwero-
Rwenzori Region
09 Contribution to
International
Organizations (IOM)
3.00 Uganda is a member of IOM and therefore
required to make annual subscriptions to
renew its membership but has always been
in arrears. There are enormous benefits
derived from IOM membership which
include: helping Ugandans in the diaspora
when being repatriated back home;
handling the evacuation of high profile
refugees from Uganda to other countries;
and handling IDPs.
In case the outstanding subscription fees
are not paid, Uganda risk losing it
membership and thus all the benefits listed
above
10 Establishing a
Government Call Centre
0.50 There is a Cabinet directive to improve
communication between Government and
the public. This is intended to: Allow
Government to communicate packaged
information to the public; and improve
accountability and transparency by
enabling the public have access to
information on government programs,
reporting cases of poor service delivery
and also reporting instances of abuse of
office by public officials
11 Government Web Portal 0.50 There is a Cabinet directive to establish a
single point of access for all Government
websites and web services within and
outside the country. This is intended to
Office of the Prime Minister Ministerial Policy Statement
Page xxxiv
provide a single point of access for all
information on Uganda thereby promoting
the country’s tourism potential and
investment opportunities.
12 Budget enhancement for
UVAB
0.50 This funding is required over the medium
Term as top up on the current GOU
subvention of UGX 0.5bn to UVAB to
bridge the gap left when donors withdrew
their funding to the Board.
13 Full scale Implementation
of the Teso Development
Plan (TDP).
131.34 H.E the President, in May, 2011 created a
Ministry in charge of Teso Affairs under
the Office of the Prime Minister (OPM) to
monitor and coordinate service delivery
and development initiatives in the sub-
region. However, no budgetary provisions
were provided for the new portfolio
created.
The draft TDP was finalized and awaits
Cabinet approval.
The required cost for implementing the
TDP over the Medium Term will be UGX
656.7 billion
14 Full scale Implementation
of the Bunyoro Integrated
Affirmative Development
Plan (BIADP) over the
medium Term
182.72 H.E the President, in May, 2011 created a
Ministry in charge of Bunyoro Affairs
under the Office of the Prime Minister
(OPM) to monitor and coordinate service
delivery and development initiatives in the
sub-region. However, no budgetary
provisions were provided for the new
portfolio created.
The draft BIADP was finalized and awaits
Cabinet approval.
The required cost for implementing the
BIADP over the Medium Term will be
UGX 913.6 billion
15 Capitalization of UBC 10.60 O/w Ushs.5bn is for rolling out the DTT
Network; Ushs.1.6bn for implementing
HE the President’s directive of setting up
radios in the Karamoja sub region;
Ushs.2.8bn for countrywide structural
analysis of UBC Towers; Ushs.0.3bn for
the procuring of equipment required for
mobile Satellite uplink” to improve Live
Coverage; and Ushs.1.2bn for upgrading
the satellite Uplink that carries all UBC
radio and television signals
16 Construction and
operationalization of the
National Emergency
Coordination and
Operations Centre
7.00 The NECOC is a Policy issue that was
approved by Cabinet in April 2011.
Subsequently OPM acquired land from
UIA in Namanve to construct a fully-
fledged NECOC to improve Preparedness
Office of the Prime Minister Ministerial Policy Statement
Page xxxv
(NECOC) and timely response to disasters in the
Country.
17 Budget enhancement for
food and non-food relief
items to cater for
emerging disasters over
the Medium Term
5.00 Regular occurrences of disasters has
resulted into high demand for relief and
emergency response throughout the
country yet the current budgetary
allocations are inadequate to meet the
demands.
Total 551.24 This figure is likely to increase if/when
the proposal in the NDP2 to establish a
Special Program for Busoga Sub
Region is implemented (details are
being worked out
These unfunded priorities have been communicated to MoFPED for consideration given the
resource constraints. The implication of this is that Office of the Prime Minister may not be
able to implement these important priorities over the Medium Term.
Office of the Prime MinisterVote:
Ministerial Policy StatementOffice of the Prime Minister
003
The chart below shows total funding allocations to the Vote by Vote Function over the medium term:
Table V1.1: Overview of Vote Expenditures (UShs Billion)(ii) Summary of Past Performance and Medium Term Budget Allocations
0
20
40
60
80
100
120
140
160
Ad
min
istr
ati
on
an
d S
up
po
rt
Serv
ices
Dis
ast
er
Pre
pare
dn
ess
,
Man
ag
em
en
t
an
d R
efu
gees
Man
ag
em
en
t o
f
Sp
ecia
l
Pro
gra
ms
Po
licy
Co
ord
inati
on
,
Mo
nit
ori
ng
an
d
Ev
alu
ati
on
Ush
s B
illi
on
2014/15 Approved Budget Estimates 2015/16 Budget Projections 2016/17 Budget Projections
Chart V1.1: Medium Term Budget Projections by Vote Function (Excluding Taxes, Arrears)
V1: Vote Overview
“To instil and maintain efficient and effective systems in Government that enable Uganda to rapidly
develop”
The Vision is: “A Public Sector which is Responsive and Accountable in Steering Uganda Towards
Rapid Economic Growth and Development” .
The Mandate is: “To lead Government Business in Parliament; be responsible for the coordination
and implementation of Government policies across MDAs including policy and management issues on
disaster and refugees, special programs on pacification and development of Northern Uganda, Luwero,
Karamoja,, Bunyoro, Teso, Information and National Guidance”
(i) Vote Mission Statement
Wage
Non Wage
GoU
Ext. Fin
GoU Total
Total GoU + Ext Fin (MTEF)
Development
Recurrent
Taxes 3.7205.100 1.640 1.800
Total Budget 192.147111.123 145.500 146.582
(ii) Arrears
and Taxes
Arrears 0.0100.000 0.003 0.000 N/A
N/A
N/A
N/A
N/A N/A
(i) Excluding Arrears, Taxes
2.8392.5751.930 1.570 2.575 2.704
56.77248.22626.683 35.735 48.226 52.084
123.71676.78577.411 63.671 80.023 88.369
0.00060.8320.000 42.880 13.958 14.253
183.327127.586106.023 100.976 130.824 143.157
183.327188.418106.023 143.857 144.781 157.410
2017/182013/14
Outturn
Rel. by
End Mar
Approved
Budget 2015/16 2016/17
MTEF Budget Projections2014/15
Vote Overview
Page1
Office of the Prime MinisterVote:
Ministerial Policy StatementOffice of the Prime Minister
003
V2: Vote Performance for FY 2014/15 and Planned Outputs for FY 2015/16
(i) Past Vote Outputs
This section describes past vote performance and planned Outputs, in terms of key vote outputs
Vote 003: OPM Achievements for FY 2014/15 (July 2014-March 2015)
A) VOTE FUNCTION 1301: POLICY COORDINATION, MONITORING AND EVALUATION
Parliamentary Business and Strategic Coordination under the Executive Office (Prime Minister, Second
Deputy Prime Minister, Minister for General Duties and Government Chief Whip)
1. Provided strategic leadership for Government Business in Parliament through coordinating the
programming of the legislative agenda and attendance of Cabinet Ministers to their parliamentary
responsibilities of responding to questions, and presenting Government Bills and Ministerial Statements in
Parliament. This was instrumental in the passage by Parliament of fifteen (15) Bills, conclusion of twenty
three (23) Committee Reports, passage of eighteen (18) Motions, presentation of thirty (30) Ministerial
Statements and the conclusion of six (6) Petitions, ten (10) questions for oral responded to.
2. The Prime Minister and the 2nd Deputy Prime Minister presided over strategic coordination of various
government undertakings such as chairing the preparatory meetings for the Presidential Investors’ Round
Table (PIRT) which took place in January/February 2015 to review progress in implementation of the
Fourth Phase of the PIRT, coordinating the Joint Budget Support leading to holding of the meeting between
the Joint Policy Coordination Committee (PCC) and the Joint Budget Support Framework Development
Partners Policy Committee (JBSF DP-PC) on 15th July 2014 where the Fifth Round of the Joint Assessment
Framework (JAF 5) was concluded and the Sixth round of the Joint Assessment Framework (JAF 6) Matrix
of Indicators and Targets was agreed; holding consultations with the United Nations Representatives
(United Nations Country Team – UNCT) on the establishment of a high-level modality for Government
engagement with the United Nations Agencies, implementation of undertakings from the Uganda Mineral
Sector Retreat which took place on 16th December 2013 at State House Entebbe
3. The Prime Minister and his Deputy oversaw many other strategic coordination platforms such as the
Annual Monitoring Committee meeting for the Peace Recovery and Development Programme (PRDP 2);
the Cabinet Committee on Constitutional Amendments and a Committee Report to Cabinet was finalized,
the Presidential advisory Committee on the Budget (PACOB) which compiled and submitted a report to
H.E the President on the Budget Strategy for FY 2015/16 and other strategic coordination meetings on the
ongoing development of the Sustainable Development Goals (SDGs) , Environment and management of
wetlands, the Climate Change Policy, Oil Companies and Taxation.
4. The Prime Minister facilitated government international engagement to promote investment and
international cooperation where international delegations on development were hosted from North Korea,
Netherlands and Egypt.
5. The Prime Minister and the 2nd Deputy Prime Minister officiated at a number of events and explained
government policies such as monitoring Implementation of public policies, programmes and projects in
Rubirizi and Kumi Districts, handling resettlement of the landless Sebei, etc.
6. Coordinated a number of Government policies such as the Public Sector Management programmes,
cross cutting issues in Government, National budgeting process, production of the Annual Performance
implementation reports, etc
7. Provided leadership towards the reconciliation of the warring Muslim factions.
8. Monitored implementation of Government policies, programmes and projects in Rubirizi, Kabarole,
Kasese, Kamwange, Busoga, Kiruhura, Mbarara, Kisoro, Sebi and Kumi district Local Governments.
Prel