PASSIVE HOUSE POSTER

Post on 24-Jul-2015

8,314 views 10 download

Tags:

transcript

UP

-6' -

0" -5' - 0"

-4' - 0"

-3' - 0"

-2' - 0"

-1' - 0"

0' - 0"

1' - 0"

2' - 0"

3' - 0"

4' - 0" 5' - 0"

6' - 0"

7' - 0"

8' - 0"

9' - 0"

10' - 0" 1

1' - 0

"

1

2' - 0"

3' - 0"

4' - 0" 5' - 0"

6' - 0"

0"

UP

DN

PINE STR

EET

SHERWOOD COURT

Magnetic North

Solar South

3 1/2" structural stud wall

Rock woll in service cavity

OSB

Dashed line of air control layer

Vycor flashing tape

Spray foam insulation

11 7/8" TJI vertical

Dense pack cellulose insulation

Extension jamb

Dashed line of thermal control layer

Tyvek=water control layer

3/4" furring and air space

Painted gypbd

1 1/4" Timberstrand

Blocking / furring

2x4 stud

Vycor flashing tape

1 1/4" #12 screws

Window installation clip

Fiberboard sheathing

Intus eforte triple paneinswing casement window

EPS insulation

Dashed line of thermal control layer

Extension jamb

3M 8067 flashing tape

Aluminum window sill beyond

1' - 4 7/8"

Vented wood siding

3/4" furring strips

Fiberboard

Tyvek

11 7/8" dense pack cellulose

11 7/8" TJI @ 2'-0"O.C.fastened to 2x4 withGRK structural screws

2x4 wall stud @ 2'-0" O.C.

Flashing tape at TJI to OSB

5/8" gypbd

GREEN - Air and vapor control layer

RED - Thermal control layer

BLUE - Water control layer

2x4 at corner

1' -

6 5

/8" EPS insulation

Wall r-value = 50.7

Timberstrand LSL

2x4

2x4

OSB

First Floor Plan0' - 0"

Second Floor Plan10' - 0"

Roof18' - 0"

Bottom of SlabInsulation

-2' - 2"

Control Layers Legend

1. Thermal Control Layer2. Water Control Layer3. Vapor Control Layer4. Air Control Layer

Thermal bridge free to0.006 BTU/HRFT2F

TJI Wall Assembly (R=60.7)11 7/8" TJI @ 24" O.C.Gypbd wall finish3 1/2" rock wool batts in 2x4 wall cavity1/2" OSB caulked and taped - air seal11 7/8" dense pack cellulose in TJI cavity1/2" celotex fiberboardTyvek3/4" furringBoard and batten siding

Triple pane Intuscasement windowsU =.15

Roof Assembly (R=85.4)30" raised heel wood trussGypbd ceiling finish1/2" OSB caulked and taped - air sealWood truss24" blown in cellulose isulationRoof sheathingTyvek3/4" furringMetal roof

EPS frost skirt

Slab Assembly (R=75.8)6" Reinforced concrete floor finishTaped polyethylene water and vapor barrier8" perlite12" rigid under slab insulation2" flowable fill8" perlite

SOUTH

NORTH

6 / 12

All control layers are to be continuous

5 8' -

0"

10' -

0"

Hall

7

Bath 1

11

Mudroom

1

Living Room

4

Mechanicalchase

8' -

10

3/4"

30" raised heel energy truss

2x4 top plate

5/8" gypbd

11 7/8" TJI joists @ 2'-0" O.C.

EPS insulation

2x4 plate

3/4" floor sheathing

3/4" T&G wood flooring

GREEN - Air and vapor control layer

RED - Thermal control layer

BLUE - Water control layer

11 7/8" LVL continuous rim joistwith stl hangers above openings

Continuous 2x10 blockingbehind 2x10 ledger

Continuous 2x10 ledger withSDS screws and STL hangers

2x8 porch roof rafter

2x4 top plate

5/8" Gypbd

OSB glued to truss withseams caulked and taped

6" OSB strip beforetruss with seamsblocked and taped

Screened cladding vent

Vented soffit

Metal roof

Insulation baffle

2'-0" loose fill insulation

5/8" Roof sheathing

30" Raised heel truss

OSB continuous to top chord

Undisturbed soil

8" of compacted #2B stone

12" of EPS insulation withseams sealed

8" of Perlite in bags

Grade

2" EPS frost wing

2' - 0"

0' -

6"

Parged fibercement

Screened cladding vent

Continuous 1 1/4" PSL

6" poured concrete slab

2x4 plate with anchor bolts4'-0" O.C. and sill seal

10 mil poly wrapedto OSB and taped

5/8" gypbd

Structural 2x4 stud wall @ 24" O.C.

OSB glued to frame - caulked and taped

1' -

2"

11 7/8" TJI @ 2'-0" O.C.

11 7/8" dense pack cellulose insulation

Fiberboard sheathing

Tyvek housewrapwith seams taped

RED - Thermal control layer

3/4" furring and air space

Painted wood cladding

3.5" mineral wool insulation

(3) #4 bars @ 3" fromedges and bent WWF

Termite shield

Header as per structural drawings

3/4" window jamb extension

1 1/4" Timberstrand

1 1/4" #12 wood screws

Triple pane Intus Eforte windowsInswing casement window

Under sill profile by Intus

Window installation clip

1 1/4" #12 wood screws

Vycor

Tyvek=water control layer

3/4" window jamb extension

3M 8067 tape over tyvek

EPS insulation

Metal window sill

Spray foam or foam tape

Window jamb beyond

Extension jamb

EPS insulation

Spray foam or foam tape

Spray foam or foam tape

3M 8067 over Tyvek

Tyvek=water control layer

Vycor prior to setting roof truss

Dashed line is air control layer

OSB

Window clip

Vycor

Vycor

1 1/4" Timberstrand

11 7/8" TJI vertical

Dense pack cellulose

Dashed line of air control layer =OSB

Rock wool insulation in service cavity

3 1/2" structural stud wall

0' - 0 3/4"0' - 0 3/4"0' - 0 1/2" 0' - 11 7/8" 0' - 0 1/2" 0' - 3 1/2" 0' - 0 1/2"

3/4" furring and air space

Dashed line of thermalcontrol layer

Cor o vent

3M 8067 tape

11 7/8" TJI vertical

3/4" furring and air space

Dashed line of thermalcontrol layer

Cor o vent

Metal drip cap

Dense pack cellulose insulation

Capillary break

Equal Equal

Install window at centerof thermal enclosure

1' - 6 3/8"

0' - 9 3/4"

0' - 10 3/4"

0' -

2 2

5/32

"

OSB strip before setting roof truss

Taped seam at OSB

DESCRIPTIONA NEW 2 STORY RESIDENCE FOR A FAMILY OF 4 IN SCRANTONPENNSYLVANIA ON A CITY LOT 100’ X 180’

LOCATION SCRANTON, PA

PRECERTIFIED JULY 2013

CONSTRUCTION NOVEMBER 2013

PHPP VERIFICATION

ANNUAL HEAT DEMAND 4.52 KBTU/(FT2YR)

HEAT LOAD 2.75 BTU/(FT2HR)

PRIMARY ENERGY 31.5 KBTU/(FT2YR)

TRANSMISSION LOSSES 11,632 KBTU/YRHEAT GAIN SOLAR RADIATION 12,148 KBTU/YRENCLOSURE R-VALUE 36.2ENVELOPE AREA TO TFA 3ENVELOPE AREA TO GLAZING 16%

TREATED FLOOR AREA (TFA)FIRST FLOOR 888SECOND FLOOR 885TOTAL TFA 1,773

NET AIR VOLUME 16,326 CU/FT

GROSS BUILDING VOLUME 25,299 CU/FT

CLIMATE DATA CLIMATE ZONE 6HEATING DEGREE DAYS 6291COOLING DEGREE DAYS 539MEAN DAYS CLEAR 70MEAN DAYS RAIN 140MEAN DAYS SNOW 13PERCENT POSSIBLE SUNSHINE 51%AVERAGE PRECIPITATION YR 36”AVERAGE SNOWFALL YR 47”

OUTLINE SPECIFICATION

FLOOR R=75.86" REINFORCED CONCRETE SLAB OVER 8" OF PERLITE WITH 12"TYPE IX EPS SUB SLAB INSULATION.

EXTERIOR WALL R=60.7LOAD BEARING OVE 2X4 INTERIOR WALLS INSULATED WITHROCK WOOL AND SHEATHED WITH ½” OSB CAULKED ANDTAPED AS AIR BARRIER. 11 7/8” TJI SCREWED TO STRUCTURAL2X4 WALLS WITH DENSE PACKED CELLULOSE TO 3.5 PCF ANDSHEATHED WITH CELOTEX FIBERBOARD, TYVEK, AND VENTEDWOOD CLADDING.

ROOF R=85.430" RAISED HEEL ENGINEERED ROOF TRUSS WITH INTERIOR1/2" OSB CAULKED AND TAPED AS AIR SEAL. 24" OF BLOWNCELLULOSE.

WINDOW FRAME U=0.17 BTU/HR.FT2FINTUS EFORTE

WINDOW GLAZING U=0.09 BTU/HR.FT2FINTUS STANDARD GLAZING SHGC=0.529

VENTILATIONULTIMATE AIR 200 DX ERV, 83% EFFICIENT, 0.72W/CFM

HEATING AND COOLINGMITSUBISHI INVERTER MSZ-FE09NA & MUZ-FE09NA

DOMENSTIC HOT WATERRINNAI RL75I TANKLESS GAS HOT WATER HEATER

129 SAWKILL AVENUE MILFORD, PA 18337

OFFICE (570) 296-0466

MOBILE(267) 294-9818

RICHARD@RICHARDPEDRANTI.COM

WWW.RICHARDPEDRANTI.COM

KARPIAK MULHALL PASSIVE HOUSE

FIRST FLOOR PLAN SECOND FLOOR PLAN

1. MUDROOM2. LIVING ROOM3. KITCHEN / DINING4. LAUNDRY / POWDER5. MECHANICAL6. OFFICE7. SCREEN PORCH8. FRONT PORCH9. GARDEN TERRACE10. HALL11. LIBRARY12. MASTER BEDROOM13. MASTER BATH14. BEDROOM15. BEDROOM16. BATH

SOUTH ELEVATION EAST ELEVATION

NORTH ELEVATION WEST ELEVATION

1

2

3

456

7

8

9

10

11

12

13

14

15

16

SITE PLANBUILDING CROSS SECTIONWINDOW HEAD AND SILL DETAILS

WINDOW JAMB DETAILS

TYPICAL WALL SECTION

TYPICAL PLAN CORNER DETAIL

VIEW FROM THE SOUTHWEST VIEW FROM THE SOUTHEAST VIEW FROM THE NORTHEAST VIEW FROM THE NORTHWEST