PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

A Famous Water Power plant in Rjukan

Amund Geicke

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Rjukan Chain

Google maps

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Rjukan Chain

Frøystul

Såheim

Inlet Moflåt

Dam Dale

Dam Mæland

Vemork

Krokan

Skarsfoss

Outlet MoflåtInlet Mæl

Outlet Mæl

Norsk Hydro

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Rjukan Chain

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Construction

• Vemork 1911

• Såheim 1915

• Frøystul 1926

• Moflåt and Mæl 1952-57

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Why is it famous?

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

History of the Vemork plantAmong the worlds largest power plants in 1911.

The Vemork factory in front of the power plant.

From 1934 the factory produced heavy water

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid(s)

• Operations Grouse and Freshman, October 1942

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid

• Operations Grouse and Freshman, October 1942

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid(s)

• Operation Gunnerside, February 1943

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid(s)

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid(s)

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid(s)

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid(s)

• Bombing, November 1943

• 143 B-17's

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The Vemork Raid(s)

• Sinking of D/F Rjukan

• Timed bomb

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Back to the future…

• Project initiated and planning startet in 2009.

• Inspections and concrete sampling in 2011 and 2012.

• Excecution of repair and construction works during production stops in the summer months of 2011-2014.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Design basis

• Operating time 20 years

• Low focus on visual appearance.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Scope 2012

Frøystul

Såheim

Inlet Moflåt

Dam Dale

Dam Mæland

Vemork

Krokan

Skarsfoss

Outlet MoflåtInlet Mæl

Outlet Mæl

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Skarsfoss

New dam

Inlet Skarsfoss

Demolish dam 2014

Inlet tunnel to Vemork

2 gates

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Inlet Skarsfoss

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Inlet Skarsfoss - Damages

Freezing/thawing and Cracking caused by alcali-aggregate reaction (AAR).

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Inlet Skarsfoss - assessment

• Coating will not stop AAR

• The cracking will have very small consequences the next 20 years

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Inlet Skarsfoss

Original scope:

•Mechanical concrete repairs.

•Polyurea on everything.

Resulting scope after inspection:

•Mechanical concrete repairs.

•New structural elements.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Scope 2012

Frøystul

Såheim

Inlet Moflåt

Dam Dale

Dam Mæland

Vemork

Krokan

Skarsfoss

Outlet MoflåtInlet Mæl

Outlet Mæl

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Krokan- Damages

Freezing/thawing and cracking caused by AAR

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Krokan- Damages

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Krokan- Damages

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Krokan - assessment

The structure does not have sufficient load bearing capasity.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Krokan - Scope

Original scope:

•Mechanical concrete repairs.

•Polyurea on everything.

Resulting scope after inspection:

•New Dam Krokan.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Scope 2012

Frøystul

Såheim

Inlet Moflåt

Dam Dale

Dam Mæland

Vemork

Krokan

Skarsfoss

Outlet MoflåtInlet Mæl

Outlet Mæl

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Spillway wall - damages

Leaching caused by poorly compacted concrete.

Cracking from AAR

Damages also downstream.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Spillway wall - assessment

• Concrete of varying quality. Especially in the lower parts of the wall.

• Difficult access downstream.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Spillway wall - Scope

Original scope:•Mechanical concrete repairs.•Polyurea on the upstream side.

Resulting scope after inspection:•New concrete wall on the lower parts.•Mechanical concrete repairs.•Polyurea on the upstream side.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Scope 2012

Frøystul

Såheim

Inlet Moflåt

Dam Dale

Dam Mæland

Vemork

Krokan

Skarsfoss

Outlet MoflåtInlet Mæl

Outlet Mæl

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Mæland

Dam MælandMåna river

Inlet duct

Inlet Moflåt

Gate housing

access to river

Såheim outlet

El. inst

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Mæland

Spillway wall

Dam, walls, bridge etc – Repair works on all concrete surfaces and railings etc.

Coffer dam

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Dam Mæland

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Bridge

Damages:

Rebar corrosion and freezing/thawing

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Bridge

Original scope:

•Mechanical concrete repairs.

•Polyurea coating on top.

Resulting scope after inspection:

•Mechanical concrete repairs.

•Polyurea coating on top.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Pillars

Damages:

Cracking caused by AAR

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Pillars

assessment:

•Small consequences of cracking on vertical surfaces.

•Coating will not stop AAR

•Possible increased risk of damages from freezing/thawing with coating.

•Damages have little impact on the load bearing capasity.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Pillars

Original scope:•Mechanical concrete repairs.•Polyurea coating.

Resulting scope after inspection:•Mechanical concrete repairs.•Roof over horisontal surfaces.•Cleaning.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Walls

Damages:

Cracking caused by AAR

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Walls

assessment:

•Small consequences of cracking on vertical surfaces.

•Coating will not stop AAR

•Possible increased risk of damages from freezing/thawing with coating.

•Damages have little impact on the load bearing capasity.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Walls

Original scope:

•Mechanical concrete repairs.

•Polyurea coating.

Resulting scope after inspection:

•Mechanical concrete repairs.

•Cleaning with ultra high pressure. Removing old coating.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Baseplate

Damages:

Cracking caused by AAR and Freezing/thawing

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Baseplate

assessment:

•Risk of full disintegration of baseplate within the next 20 years.

•The baseplate is critical for the function of the sealing injection screen.

•Repair costs will be almost as high as the construction cost of a new slab.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Baseplate

Original scope:

•Mechanical concrete repairs.

Resulting scope after inspection:

•New Baseplate

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Ducts

Damages:

Cracking caused by AAR

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Ducts

assessment:

•Small consequences of cracking on vertical surfaces.

•Coating will not stop AAR

•Possible increased risk of damages from freezing/thawing with coating.

•Damages have little impact on the load bearing capasity.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Mæland - Ducts

Original scope:

•Mechanical concrete repairs.

•Polyurea coating.

Resulting scope after inspection:

•Mechanical concrete repairs.

•Cleaning with high pressure.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Pictures 2012

Downstream wall Mæland

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Pictures 2012

Core from spillway wall Såheimstoppen.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Pictures 2012

Pillar Mæland.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

The new Dam Krokan

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Downstream wall MælandWhy don't we coat this?

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Pro coating

• Appearance

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Against coating

• Massive structures not depending on reinforcement.

• The opposite side may not always be dry. Risk of freezing/thawing damages behind coating.

• Compressive strength of concrete increases with AAR.

• Structural integrity may not always be intact.

PDA Europe 2012 Annual Conference –Istanbul, 12-14 November

Can you coat this?