Post on 07-Jul-2018
transcript
8/19/2019 Perhitungan Drying
1/21
Bukaan 9
t(menit) m (gr) m kering x A (cm2) dX R
3 48 15.1 2.178808 112.64 1.9 0.0849018
6 46.1 15.1 2.05298 112.64 1.9 0.08490189 44.2 15.1 1.927152 112.64 1.4 0.0625592
12 42.8 15.1 1.834437 112.64 1.2 0.0536222
15 41.6 15.1 1.754967 112.64 1.6 0.071496218 40 15.1 1.649007 112.64 1.7 0.0759647
21 38.3 15.1 1.536424 112.64 1.4 0.0625592
24 36.9 15.1 1.443709 112.64 0.6 0.026811127 36.3 15.1 1.403974 112.64 1.4 0.062559230 34.9 15.1 1.311258 112.64 0.6 0.0268111
33 34.3 15.1 1.271523 112.64 0.7 0.0312796
36 33.6 15.1 1.225166 112.64 0.8 0.035748139 32.8 15.1 1.172185 112.64 0.8 0.0357481
42 32 15.1 1.119205 112.64 0.9 0.0402166
45 31.1 15.1 1.059603 112.64 0.7 0.0312796
48 30.4 15.1 1.013245 112.64 0.6 0.026811151 29.8 15.1 0.97351 112.64 0.7 0.0312796
54 29.1 15.1 0.927152 112.64 0.8 0.0357481
57 28.3 15.1 0.874172 112.64 0.6 0.026811160 27.7 15.1 0.834437 112.64 0.7 0.0312796
63 27 15.1 0.788079 112.64 0.5 0.0223426
66 26.5 15.1 0.754967 112.64 0.7 0.031279669 25.8 15.1 0.708609 112.64 0.7 0.0312796
72 25.1 15.1 0.662252 112.64 0.3 0.0134055
75 24.8 15.1 0.642384 112.64 0.6 0.0268111
78 24.2 15.1 0.602649 112.64 0.9 0.040216681 23.3 15.1 0.543046 112.64 0.4 0.0178741
84 22.9 15.1 0.516556 112.64 0.7 0.0312796
87 22.2 15.1 0.470199 112.64 0.8 0.035748190 21.4 15.1 0.417219 112.64 0.7 0.031279693 20.7 15.1 0.370861 112.64 0.7 0.0312796
96 20 15.1 0.324503 112.64 0.7 0.0312796
99 19.3 15.1 0.278146 112.64 0.6 0.0268111102 18.7 15.1 0.238411 112.64 0.5 0.0223426
105 18.2 15.1 0.205298 112.64 0.5 0.0223426
108 17.7 15.1 0.172185 112.64 0.5 0.0223426111 17.2 15.1 0.139073 112.64 0.5 0.0223426
114 16.7 15.1 0.10596 112.64 0.4 0.0178741
117 16.3 15.1 0.07947 112.64 0.4 0.0178741
120 15.9 15.1 0.05298 112.64 0.4 0.0178741123 15.5 15.1 0.02649 112.64 0.3 0.0134055
126 15.2 15.1 0.006623 112.64 0 0
129 15.2 15.1 0.006623 112.64 0 0132 15.2 15.1 0.006623 112.64 0 0
8/19/2019 Perhitungan Drying
2/21
1
0 20 40 60 80 100 120 140 1600
0.5
1
1.5
2
2.5
Bukaan 9
Bukaan 10
Bukaan 11
t (menit)
X (Moisture Content)
8/19/2019 Perhitungan Drying
3/21
Bukaan 10
t(menit) m (gr) m kering x A (cm2) dX
3 45.9 15.1 2.039735 112.64 0.8
6 45.1 15.1 1.986755 112.64 1.29 43.9 15.1 1.907285 112.64 0.6
12 43.3 15.1 1.86755 112.64 1.3
15 42 15.1 1.781457 112.64 0.918 41.1 15.1 1.721854 112.64 0.8
21 40.3 15.1 1.668874 112.64 1.2
24 39.1 15.1 1.589404 112.64 0.727 38.4 15.1 1.543046 112.64 0.830 37.6 15.1 1.490066 112.64 0.8
33 36.8 15.1 1.437086 112.64 0.8
36 36 15.1 1.384106 112.64 0.939 35.1 15.1 1.324503 112.64 0.5
42 34.6 15.1 1.291391 112.64 0.8
45 33.8 15.1 1.238411 112.64 0.7
48 33.1 15.1 1.192053 112.64 0.651 32.5 15.1 1.152318 112.64 0.8
54 31.7 15.1 1.099338 112.64 0.9
57 30.8 15.1 1.039735 112.64 0.260 30.6 15.1 1.02649 112.64 0.9
63 29.7 15.1 0.966887 112.64 1
66 28.7 15.1 0.900662 112.64 0.769 28 15.1 0.854305 112.64 0.8
72 27.2 15.1 0.801325 112.64 0.6
75 26.6 15.1 0.761589 112.64 0.7
78 25.9 15.1 0.715232 112.64 0.981 25 15.1 0.655629 112.64 0.8
84 24.2 15.1 0.602649 112.64 0.5
87 23.7 15.1 0.569536 112.64 0.890 22.9 15.1 0.516556 112.64 0.693 22.3 15.1 0.476821 112.64 0.6
96 21.7 15.1 0.437086 112.64 0.6
99 21.1 15.1 0.397351 112.64 0.3102 20.8 15.1 0.377483 112.64 0.6
105 20.2 15.1 0.337748 112.64 0.4
108 19.8 15.1 0.311258 112.64 0.4111 19.4 15.1 0.284768 112.64 0.4
114 19 15.1 0.258278 112.64 0.4
117 18.6 15.1 0.231788 112.64 0.4
120 18.2 15.1 0.205298 112.64 0.4123 17.8 15.1 0.178808 112.64 0.4
126 17.4 15.1 0.152318 112.64 0.2
129 17.2 15.1 0.139073 112.64 0.5132 16.7 15.1 0.10596 112.64 0.2
135 16 5 15 1 0 092715 112 64 0 2
8/19/2019 Perhitungan Drying
4/21
138 16.3 15.1 0.07947 112.64 0.3
141 16 15.1 0.059603 112.64 0144 16 15.1 0.059603 112.64 0
147 16 15.1 0.059603 112.64 0
2
30 40 50 60 70 80 90 100 1100
2
4
6
8
10
12
14
ΔP mmH2O
Bukaan
R (gr2/cm
8/19/2019 Perhitungan Drying
5/21
Bukaan 11
R t(menit) m (gr) m kering x A (cm2)
0.035748 3 49.8 15.1 2.298013 112.64
0.053622 6 48.3 15.1 2.198675 112.640.026811 9 47.3 15.1 2.13245 112.64
0.058091 12 46.6 15.1 2.086093 112.64
0.040217 15 46.1 15.1 2.05298 112.640.035748 18 45.4 15.1 2.006623 112.64
0.053622 21 44.5 15.1 1.94702 112.64
0.03128 24 43.1 15.1 1.854305 112.640.035748 27 42.2 15.1 1.794702 112.640.035748 30 41.5 15.1 1.748344 112.64
0.035748 33 40.6 15.1 1.688742 112.64
0.040217 36 39.7 15.1 1.629139 112.640.022343 39 38.7 15.1 1.562914 112.64
0.035748 42 37.9 15.1 1.509934 112.64
0.03128 45 37.2 15.1 1.463576 112.64
0.026811 48 36.5 15.1 1.417219 112.640.035748 51 35.9 15.1 1.377483 112.64
0.040217 54 35.1 15.1 1.324503 112.64
0.008937 57 34.4 15.1 1.278146 112.640.040217 60 33.4 15.1 1.211921 112.64
0.044685 63 32.9 15.1 1.178808 112.64
0.03128 66 31.9 15.1 1.112583 112.640.035748 69 31.4 15.1 1.07947 112.64
0.026811 72 30.3 15.1 1.006623 112.64
0.03128 75 29.7 15.1 0.966887 112.64
0.040217 78 28.8 15.1 0.907285 112.640.035748 81 28.3 15.1 0.874172 112.64
0.022343 84 27.7 15.1 0.834437 112.64
0.035748 87 27.3 15.1 0.807947 112.640.026811 90 26.5 15.1 0.754967 112.640.026811 93 25.9 15.1 0.715232 112.64
0.026811 96 25.2 15.1 0.668874 112.64
0.013406 99 24.8 15.1 0.642384 112.640.026811 102 24.1 15.1 0.596026 112.64
0.017874 105 23.6 15.1 0.562914 112.64
0.017874 108 22.9 15.1 0.516556 112.640.017874 111 22.8 15.1 0.509934 112.64
0.017874 114 22.5 15.1 0.490066 112.64
0.017874 117 22 15.1 0.456954 112.64
0.017874 120 21.6 15.1 0.430464 112.640.017874 123 21.2 15.1 0.403974 112.64
0.008937 126 20.8 15.1 0.377483 112.64
0.022343 129 20.5 15.1 0.357616 112.640.008937 132 20.1 15.1 0.331126 112.64
0 008937 135 19 7 15 1 0 304636 112 64
8/19/2019 Perhitungan Drying
6/21
0.013406 138 19.4 15.1 0.284768 112.64
0 141 19.2 15.1 0.271523 112.640 144 18.9 15.1 0.251656 112.64
0 147 18.5 15.1 0.225166 112.64
150 18.2 15.1 0.205298 112.64
153 18.2 15.1 0.205298 112.64
156 18.2 15.1 0.205298 112.64
!re"a#i A"at
0 0.5 1 1.5 20
0.01
0.02
0.03
0.040.05
0.06
0.07
0.08
0.09
X (Moisture Content)
R (gr2/cm2.mnt)
0 0.5 1 1.5 2 2.50
0.010.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
Bukaan 9
Bukaan 10
Bukaan 11
X (Moisture Content)
2.mnt)
8/19/2019 Perhitungan Drying
7/21
dX R Bukaan
1.5 0.067028 1 35
1 0.044685 2 50
0.7 0.03128 3 58
0.5 0.022343 4 65
0.7 0.03128 5 73
0.9 0.040217 6 76
1.4 0.062559 7 83
0.9 0.040217 8 87
0.7 0.03128 9 910.9 0.040217 10 94
0.9 0.040217 11 96
1 0.044685 12 970.8 0.035748
0.7 0.03128
0.7 0.03128
0.6 0.0268110.8 0.035748
0.7 0.03128
1 0.0446850.5 0.022343
1 0.044685
0.5 0.0223431.1 0.049154
0.6 0.026811
0.9 0.040217
0.5 0.0223430.6 0.026811
0.4 0.017874
0.8 0.0357480.6 0.0268110.7 0.03128
0.4 0.017874
0.7 0.031280.5 0.022343
0.7 0.03128
0.1 0.0044690.3 0.013406
0.5 0.022343
0.4 0.017874
0.4 0.0178740.4 0.017874
0.3 0.013406
0.4 0.0178740.4 0.017874
0 3 0 013406
mm$2%
8/19/2019 Perhitungan Drying
8/21
0.2 0.008937
0.3 0.0134060.4 0.017874
0.3 0.013406
0 0
0 0
0 0
2.5
Bukaan 9
Bukaan 10
Bukaan 11
0 20 40 600
10
20
30
40
50
60
Wa
massa bahan (gr)
0 0.5 1 1.5 2 2.50
0.010.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
Bukaan 9
Bukaan 10
Bukaan 11
X (Moisture Content)
R (gr2/cm2.mnt)
8/19/2019 Perhitungan Drying
9/21
8/19/2019 Perhitungan Drying
10/21
80 100 120 140 160 180
Bukaan
Bukaan
Bukaan
tu (menit)
8/19/2019 Perhitungan Drying
11/21
B&A'% R*%BAA'
+!du" , -ringe"!m/!k , A8
'ama , 1. Bi"" Ar!kman 3335121465
2. itri au R!a 3335122093A#i#ten , *!iru" mam
1. !"era#i A"at
Bukaan1 35
2 50
3 584 65
5 73
6 767 838 87
9 91
10 9411 96
12 97
2. r!#e# engeringan
ma##a (g) d in(*) in(*) d !ut(*)
48 46 30 29 5946.1 61 30 29 6744.2 65 30 29 70
42.8 70 31 30 7041.6 72 31 30 73
40 73 31 30 73
33.3 74 32 31 75
36.9 75 32 31 7536.3 75 32 31 75
34.9 75 32 31 79
34.3 75 32 31 7833.6 75 32 31 80
32.8 76 32 31 81
32 76 32 31 85
mm$2%
Bukaan 9 mm$2% 91
:am/"e aa" 50 gram 120*
(*)
8/19/2019 Perhitungan Drying
12/21
31.1 76 32 31 85
30.4 79 32 31 87
29.8 77 32 31 8829.1 77 32 31 88
28.3 88 33 31 89
27.7 98 33 32 9127 103 33 32 92
26.5 103 33 32 94
25.8 104 33 32 97
25.1 105 33 32 9924.8 104 34 33 99
24.2 104 34 33 99
23.3 105 34 33 9922.9 107 34 33 9922.2 107 34 33 99
21.4 106 34 33 99
20.7 106 35 33 9920 106 35 33 99
19.3 106 35 33 99
18.7 105 35 33 9918.2 106 35 33 99
17.7 105 35 33 99
17.2 105 35 33 9916.7 107 35 33 9916.3 107 35 33 100
15.9 108 35 33 100
15.5 109 35 33 10115.2 109 35 33 10315.2 108 35 33 103
15.2 108 35 33 103
ma##a (g) d in(*) in(*) d !ut(*)
45.9 65 35 34 62
45.1 68 35 34 7243.9 72 35 34 72
43.3 74 35 34 74
42 75 35 34 7440.3 75 35 34 74
39.1 76 35 34 74
Bukaan 10 mm$2
% 94
:am/"e Aa" 50 gram 120 *
(*)
8/19/2019 Perhitungan Drying
13/21
38.4 76 35 34 75
37.6 77 35 34 75
36.8 77 35 34 7536 77 35 34 75
35.1 77 35 34 75
34.6 77 35 34 7533.8 77 35 34 7533.1 77 35 34 75
32.5 78 35 34 75
31.7 79 35 34 7530.8 80 35 34 78
30.1 81 35 34 79
29.7 84 35 34 8028.7 100 35 34 82
28 103 35 34 95
27.2 104 35 34 97
26.6 105 35 34 9825.9 105 35 34 98
25 105 35 34 98
24.2 106 35 34 9823.7 106 35 34 98
22.9 106 35 34 98
22.3 106 35 34 9821.7 106 35 34 9821.1 106 35 34 98
20.8 106 35 34 98
20.2 106 35 34 9819.8 106 35 34 9829.4 105 35 34 97
19 105 35 34 98
18.6 105 35 34 9818.2 106 35 34 97
17.8 106 35 34 98
17.4 106 35 34 9817.2 106 35 34 98
16.7 106 35 34 98
16.5 107 35 34 98
16.3 107 35 34 9816 107 35 34 98
16 108 35 34 98
16 108 35 34 98
8/19/2019 Perhitungan Drying
14/21
ma##a (g) d in(*) in(*) d !ut(*)
49.8 45 33 32 5848.3 60 33 32 68
47.3 68 33 32 69
46.6 70 34 33 7046.1 71 34 33 71
45.4 72 34 32 7344.5 73 34 33 73
43.1 74 35 33 76
42.2 74 35 33 7841.5 75 35 34 78
40.6 76 35 34 78
39.7 77 35 34 7538.7 75 35 34 75
37.9 74 35 34 78
37.2 74 34 33 7436.5 74 34 33 74
35.9 76 34 33 75
35.1 75 34 33 75
34.4 75 34 33 7433.4 75 34 33 74
32.9 75 34 33 74
31.9 75 34 33 7331.4 76 34 33 76
30.3 77 34 33 74
29.7 77 34 33 7428.8 77 34 33 7428.3 77 34 33 74
27.7 77 34 33 7427.3 77 34 33 75
26.5 77 34 33 7525.9 77 34 33 76
25.2 77 34 33 75
24.8 77 34 33 7524.1 77 34 33 75
23.6 78 34 33 75
22.9 77 35 34 7522.8 77 35 34 76
22.5 77 35 34 75
Bukaan 11 mm$2% 96
:am/"e Aa" 50 gram 120 *
(*)
8/19/2019 Perhitungan Drying
15/21
22 77 35 34 75
21.6 78 35 34 75
21.2 78 35 34 7620.8 80 35 34 76
20.5 80 35 34 77
20.1 79 35 34 7819.7 77 35 34 7619.4 77 35 34 75
19.2 77 35 34 75
18.9 78 35 34 7518.5 78 35 34 75
18.2 78 35 34 75
18.2 78 35 34 7618.2 78 35 34 76
8/19/2019 Perhitungan Drying
16/21
!ut(*)
576568
727171
73
7373
77
7678
79
79
8/19/2019 Perhitungan Drying
17/21
83
86
8787
88
908991
94
9797
97
969696
96
9696
96
9696
96
969999
100
100101103
103
!ut(*)
60
7070
72
7272
72
8/19/2019 Perhitungan Drying
18/21
74
74
7474
74
747474
74
7477
78
798193
94
9696
97
9797
97
979797
97
979797
96
9797
97
9797
97
97
9797
97
97
8/19/2019 Perhitungan Drying
19/21
!ut(*)
5460
66
6870
7272
72
7474
74
7472
74
7272
72
73
7272
72
7172
72
737373
7372
7475
74
7474
74
7475
74
8/19/2019 Perhitungan Drying
20/21
74
74
7575
76
767574
74
7474
74
7474
8/19/2019 Perhitungan Drying
21/21