Pinal County Air Quality Workshop

Post on 13-Jan-2016

30 views 1 download

Tags:

description

Pinal County Air Quality Workshop. Compliance Reporting And Inspections Casa Grande – January 14, 2014 Bob Farrell Environmental Engineer. Compliance Reporting. Reports you need to submit to PCACQD on a periodic basis. Quarterly/Semi-Annual/Annual Appendix “A” Reports. - PowerPoint PPT Presentation

transcript

Pinal County Air Quality WorkshopPinal County Air Quality Workshop

Compliance Reporting And

Inspections

Casa Grande – January 14, 2014

Bob FarrellEnvironmental Engineer

Compliance ReportingCompliance Reporting

Reports you need to submit to Reports you need to submit to PCACQD on a periodic basisPCACQD on a periodic basis

Quarterly/Semi-Annual/Annual Quarterly/Semi-Annual/Annual Appendix “A” ReportsAppendix “A” Reports

• Semi-Annual - Due on/by Jan 30th and July 30th

• Annual – Due Jan 30th

• Quarterly – 30 Days After each Quarter

Example of Appendix “A” Example of Appendix “A” ReportReport

Annual CertificationsAnnual Certifications

Due on/by Jan 30Due on/by Jan 30thth of each year of each year

Emission InventoryEmission Inventory

• Due 90 days after receipt of EI Package from PCAQCD, usually due late spring of each year.

Example of An Emission Example of An Emission Inventory Form For a Large Inventory Form For a Large

SourceSource

InspectionsInspections

What To ExpectWhat To Expect

• Unannounced Visit• Presentation of a PCAQCD entry form.• Record Review (site specific)

Examples: Production Reports

Inspection of Baghouse Logs Water Logs

• Tour of Site• Conduct EPA Method 9 Opacities of

Stacks and Vents

PCAQCD Entry StatementPCAQCD Entry Statement

Inspection ChecklistInspection Checklist

• Permit Posted?• Annual regular compliance/compliance report submitted?• Semi-Annual or annual compliance report submitted?• Emissions inventory report submitted?• Meet opacity threshold?• Source performance testing conducted?• Record keeping complete?• Any new or non-permitted equipment?• Emissions control equipment operating efficiently?• Any abnormal operations, shutdowns, or malfunctions?• Any CEM equipment?

Inspection ReportInspection Report

Submitted to facility within 30 working days of inspection.

QuestionsQuestions

Who To Call?Who To Call?

•Bob Farrell, Environmental EngineerBob Farrell, Environmental Engineer

•(520) 866-6949(520) 866-6949

•Bob.Farrell@pinalcountyaz.govBob.Farrell@pinalcountyaz.gov