PIPING DIA INCH CALCULATION
Butt Welded Joint
No Type Description Factor QTYPipeSize
XFactor
TotalD.I.
1End Joint, without
weldX 0.5 1 2" X 0.5 1
2Pipe Joint, butt
weldedX 1 1 2" X 1 2
3Elbow Joints, butt
weldedX 2 1 2" X 2 4
4Single Elbow Joint,butt welded on one
sidesX 0.5 + X1 1 2" 0.5 X 1 3
5Equal Tee Joints,
butt weldedX 3 1 3" X 3 9
6 EQ Tee 2A Joints X 2.5 1 3" X 2.5 7,5
7 Red Tee Joints X 2A + B 1 3" X 2"X 2A + B
(2 X 3) + 28
8 Red Tee 2A Joints X A + A 1 3" X 2"X 2A
(2 X 3)6
9 Reducer Joint X A + B 1 3" X 2" X 3 + 2 5
10 Reducer A Joint X A + X 0.5 1 3" X 2"X 3 + X
0.54
11 Reducer B Joint 0.5 + X B 1 3" X 2"X 0.5 + X
B3,5
8/18/2019 Piping Volume of Work
3/13
No Type Description Factor QTYPipeSize
XFactor
TotalD.I.
12 PIPE CAP - BW X 1 1 2" 1 2
13 Weldolet Joint B X 1.5 1 6" X 2" 2 X 1.5 3
14 Stub In Joint B X 1.5 1 6" X 2" 2 X 1.5 3
1545º or 90º Seat In
JointX 1.5 1 3" X 1.5 4.5"
Socket Weld Joint
No Type Description Factor QTYPipeSize
XFactor
TotalD.I.
1 Full Coupling SW X 1 1 2" X 1 2
2 Red Coupling SW X A + B 1 2" X 1" X 2 + 1 / 2 1,5
3 Half Coupling SW X 0.5 1 2" X 0.5 1
4 SW X SE Coupling A X 0.5 + B 1 2" X 0.5 + B 3
5SW X SE Red
CouplingA X 0.5 + B 1 2" X 1"
A X 0.5 +B
2
6SE X SW Red
CouplingA X 0.5 + B 1 2" X 1"
A X 0.5 +B
2,5
7 SW 90º or 45º Elbow X2 1 2" X 2 4
8/18/2019 Piping Volume of Work
4/13
8SW X SE 90º or 45º
ElbowA X 0.5 + B 1 2"
A X 0.5 +B
3
9 SW EQ Tee X 1.5 1 2" X 1.5 3
10 SW Red Tee2A + B X
0.51 2" X 1"
2 + 2 + 1 /0.5
2,5
11 SW Full Union X 1 1 2" X 1 2
12 SW Half Union X 0.5 1 2" X 0.5 1
13 SW Pipe Cap X 0.5 1 2" X 0.5 1
Socket End/Threaded Joint
No Type Description Factor QTYPipeSize
XFactor
TotalD.I.
1 SE Full Coupling X 2 1 2" X 2 4
2 SE Red Coupling X A + B 1 2" X 1" X 2 + 1 3
3 SE Half Coupling X 1 1 2" X 1 2
4 45º or 90º SE Elbow X 2 1 2" X 2 4
5 SE Full Union X 2 1 2" X 2 4
6 SE Half Union X 1 1 2" X 1 2
8/18/2019 Piping Volume of Work
5/13
Flanged Connection
No Type Description Factor QTYPipeSize
XFactor
TotalD.I.
7Slip On Flange
Included TighteningX 1.5 1 2" X 1.5 3
8WN Flange Included
TighteningX 1.5 1 2" X 1.5 3
9WN Flg to WN Flg
Included TighteningX 2 1 2" X 2 4
10 SW Flange IncludedTightening X 1 1 2" X 1 2
11 SE Flange X 1 1 2" X 1 2"
Penetration Pieces
No Type Description Factor QTYPipeSize
XFactor
TotalD.I.
1Insert Plate Doubler
PlatePipe Size X
21 4" X 2 8
2 U.T. Doubler PlatePipe Size X
12 4" X 1 4
3 W.T. Doubler PatePipe Size X
21 4" X 2 8
4 BHD REINFORCEDPLATE
X 1 1 4" X 1 4
5Sleeve / RingPenetration
Pipe Size X1
1 4" X 1 4
8/18/2019 Piping Volume of Work
6/13
6Coupling Penetration
SWPipe Size X
21 2" X 2 4
7Coupling Penetration
SEPipe Size X
31 2" X 3 6
8SW X SE Coupling
PenetrationPipe Size X
2.51 2" X 2.5 5
Valve and other piping components
No Type Description Factor QTYPipeSize
XFactor
TotalD.I.
9BW Weco Union
(IncludedThightening)
X 3 1 2" X 3 6
10Half BW Weco Union
(IncludedThightening)
X 1.5 1 2" X 1.5 3
11 Purchased Scrupper A X 1 1 4" X 2" 4 X 1 4
12 Fab. Scrupper A X 2 1 6" X 4" 6 X 2 12
13 Fab. Long Scrupper W X 2 + L 16" X 18"
L2 X 6 + 18 30
14BW Valve
(Included ValveHandling)
X 3 1 3" X 3 9
15Flanges Valve
(Included Handling &Thightening)
X 2 1 3" X 2 6
16 Screw End Valve X 2 1 2" X 2 4
17
Wafer Type ButterflyValve (Included
Handling &Thightening)
X 2 1 4" X 2 8
8/18/2019 Piping Volume of Work
7/13
18
Lug Type ButterflyValve (Included
Handling &Thightening)
X 3 1 4" X 3 12
19Extension Valve
Spindle
Valve SizeX 1 perDeck
1 4" X 1 4
20Straner Installation
(Included Handling &Thightening)
X 2 1 12" X 2 24
21 Rose Box Installation X 1 1 4" X 1 4
22 Dresser Coupling X 1 1 8" X 1 8
23 Install Hoses X 1 1 1" X 1 1
24Flanges toEquipmentTightening
X 0.5 1 2" X 0.5 1
25Extension Joints
InstallationX 1 1 4" X 1 4
26 Union Tightening X 1 1 2" X 1 2
27 Splash Plate X 0.25 1 6" X 0.25 1,5
28Preload Dumping
PlateX 1 1 4" X 1 4
29 Sounding Cap /Pipe Cap X 1 1 2" X 1 2
8/18/2019 Piping Volume of Work
8/13
1. F C
: .
:
. E .
B
, , , ,
.
.
A .
. C .
B ,
. C
. C
.
.
. .
.
2. E
: .
:
. E .
B
, , , ,
.
.
A .
8/18/2019 Piping Volume of Work
9/13
. C .
B ,
. C
. C
.
. .
/ ( )
.
. .
D
1 2 40 / 12 E
2 1 40
/
10 E
3 1 40 / 3 E
. E .
B
. .
F :
1. B/ ( )
2. F/ ( )
F :
1. B/
2. F
3.
4.
F : 2 40 1 3 6
.
8/18/2019 Piping Volume of Work
10/13
D
1 2 40 / 12 E
2 1 40 / 10 E
3 1 40 / 3 E
4 E 2 40 / 36 E
5 E 1 40 / 30 E
6 E 1 40 / 9 E
7 E 2 40 / 4 F
8 C 21 1 F
. A .
A , , .
. C .
. A 20% .
8/18/2019 Piping Volume of Work
11/13
D C
1.
B
.
:
. D .
F 1500 .
. D .
1. F
. F
. C ( )
.
. C ( )
. H ( )
2. E
. F
. E
.
. ( )
3. H
. D .
.
8/18/2019 Piping Volume of Work
12/13
1 F F 1 , 1 40 /
2 F 1 A 50 /
3 F 1 GA 70 /
4 F E 1 , 1 20 /
5 E 1 A 40 /
. E .
:
1.
.
.
F : 1500 , , 4
(4 4 ) 40 / .
9.3 .
2. D
.
F : 1500 , 7 . A 5.3 (6 ).
. A .
.
2. B/C
F .
:
1.
2.
3. C
8/18/2019 Piping Volume of Work
13/13
B
: 1500
:
: F. 7500/, H. 6500/, A.9000, GA.11.000
: 1 C H.3.500.000, 1 A.2.500.000
:
/ / D
1 F 4 4 .392.000 160 10 . 3.920.000
2
FGA
1 .77.000 70 22 . 1.694.000
3
F
A
2 .126.000 100 15 . 1.890.000
4 F E 5 5 .490.000 100 15 . 7.350.000
5 E
A
2 .126.000 80 19 . 2.394.000
.12.000.000
B . 29.248.000
.
: $12/ / , .
F 1500 $ 18.000 (. 126.000.000 $ 1 = . 7.000)
. ,
.
: C H, C , E G, D C, C, H .
C: G D, , C D, C .