Plan of WorkRedesign Update

Adam PreuterNIFA - Planning Accountability & Reporting Staff

• Overview

• Benefits

• Streamlining

• Planning Data

• Reporting Data

• FTE & Financial Reporting

• Demo

• User Testing

• Deployment Schedule

Topics

-REP

Overview

Executive Summary

Multistate and Integrated

Stakeholder Input

Merit/Peer Review

PLAN

Program Initiations

Redesign Conceptual Overview

Unchanged

Project Initiations

Annual Report

Planned Program Datashifted to

Target

Progress Reports

Comprise the AR

Comprise the Plan

Planned ProgramsCritical Issues

-REP

Benefits

Initiate Programs at Anytime

Update Programs at Anytime

As Broad or Granular as Needed

Each Institution Owns Their

Project & Program Data

Centralized Management

Leverage Existing Projects

-REP

Streamlining

Program Initiations = Planned Programs

Progress Reports = Annual Report

-REP

Plan/Initiation Field Reduction

Current Redesign

41 23

Current Redesign

41 21

Data Fields Eliminated

• Program Existence

• Program Duration

• Expending Formula or State Matching Funds

• Expending Other Funds

• Situation and Priorities

• Scope of the Program

• Assumptions Made

• Activity for the Program

• State Defined Outputs

• External Factors

• Planned Evaluation Studies

Data Fields Eliminated

• Evaluation of Multis and Joint Activities

• Address Critical Issues

• Address Underserved Populations

• Describe Expected Outcomes/Impacts

• Improved Program Effectiveness

• State Defined Outcomes

• Outcome Target

• Outcome Type

• Classification

• Associated Institute Type

-REP

AR/Progress Field Reduction

Current Redesign

33 31

Current Redesign

33 22

Data Fields Eliminated

• Activity

• How eXtension was used

• State Defined Outputs

• Institution Type on Outcomes

• External Factors

• Evaluation Results

• Key Evaluation Items for NIFA Attention

• National Outcomes and Indicators

-REP

FTE & Financial Reporting

Collect the same FTE and Financial

Data

Plan FTEs

Current Redesign

Total Estimated FTEs Total Estimated FTEs

Estimated FTEs

Per Planned Program

Estimated FTEs

Per Project & Program

Annual Report FTEs

Current Redesign

Total Actual FTEs Total Actual FTEs

Actual FTEs

Per Planned Program

Actual FTEs

Per Project & Program

Financial Reporting – Current

Total Planned Program

X Actual Formula

X Actual Matching

X Actual Other

Financial Reporting – Redesign

Total Projects & Programs

X Actual Formula

X Actual Matching

X Actual Other

Separate Financial Report Form

Financial Report

Financial Report

206 - Smith Lever207 - 1890 Extension208 - Smith Lever Special Needs

Formula

Financial Report

Not required –but helpful

Financial Report

Matching

Other

No requirement to connect FTEs and

financial expenditures

-REP

Demo

Disclaimer

The system is still under development, and is

SUBJECT TO CHANGE

-REP

User Testing

13 Participants – 10 LGUs (1862 & 1890)

Research & Extension – Experienced & Novice

Tested 17 Different System Scenarios

Web Conference – Live System & Wireframes

Collected Satisfaction and Scenario Completion

Issues Identified Recommendations Completed Remaining

19 21 5 16

Add WYSIWYG Editor

-REP

Deployment Schedule

Phased Deployment

Module Schedule Status

Plan November 2018 On Target

Program/Project

InitiationJune 2019 On Target

Progress/Final Report November 2019 On Target

Financial Report November 2019 On Target

Annual Report Up to November 2020 On Target

OGFM Forms Variable Timelines On Target

-REP

Resources

POW Support Page – Tools/POW

• Redesign Guide

• Mock-ups

• Screenshots

• Sign up for POW list serve

Reporting Web Conference – Search it

• Info on dates and how to attend

• Sign up for RWC list serve

NIFA.USDA.GOV

Adam Preuter

apreuter@nifa.usda.gov

202-690-0124

POW General Support

pow@nifa.usda.gov

202-690-0009

Contacts

-REP

Summary

• Modern Updated Platform

• Integrated with REEport

• Increased Flexibility and Control

• Clearer Reporting Visibility

• Collecting & Reporting on Same Data

• Streamlined Data Collection

• Significant Overall Reduction in Reporting Burden

Summary

-REP

Questions?