PNCWA Operators ConferenceEastern Oregon Region AWWA/PNCWA Short School

Water Project of the YearCity of Arlington

Mesa Industrial Park Water System

Project Summary

• $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area

• Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system

• Funded by the City of Arlington and Gilliam County

• The City of Arlington has a shovel-ready industrial park area with full water and sewer system service

Reservoir Construction

Airport Booster Pump Station Piping

250,000-Gallon Steel Storage Reservoir and Booster Pump Station

Mesa Industrial Park Area