PNG MINING CADASTRE SYSTEM (ALIAS ‘FLEXI’) 12 MONTHS ON… GRETEL ORAKE MANAGER – TECHNICAL...

Post on 18-Jan-2016

229 views 0 download

Tags:

transcript

PNG M

ININ

G CADASTR

E SYS

TEM

(ALIA

S ‘FLE

XI’)

12 MONTH

S ON…

G

R

E

T

E

L

O

R

A

K

E

M

A

N

A

G

E

R

T

E

C

H

N

IC

A

L

A

S

S

E

S

S

M

E

N

T

,

M

IN

E

R

A

L

R

E

S

O

U

R

C

E

S

A

U

T

H

O

R

IT

Y

M

R

A

M

IN

IN

G

I

N

D

U

S

T

R

Y

F

O

R

U

M

2

7

T

H

N

O

V

E

M

B

E

R

2

0

1

5

K

O

N

E

D

O

B

U

,

P

N

G

.

1

OUTLINE

Background

Development of Cadastre based on Flexicadastre application

Benefits of ‘Flexi’

Implementation challenges

Next steps to better…

2

BACKGROUND

• World Bank funded project commencing July 2013.

• Spatial Dimensions (now Trimble) owned Flexicadastre application was tailored to capture the Mining Act 1992 processes Launched in mid-2014 by Minister for Mining.

• On-going support and training by Spatial Dimensions.

3

DEVELOPMENT OF ‘FLEXI’

4

Required TEAM WORKBut HARD WORK!!

system for mineral tenements administration

and management

Provide a central system storing the complete

set of information pertaining to the

administration of mineral tenements (internal)

Provide a public mineral tenement web portal

(external)

Improve the management and administration of

mineral tenements and the distribution of data

via a web portal thereby increasing

transparency and attracting investors

Computerized Mining

Cadastre SystemWHAT MRA WANTED …

Company Registered User to Manage Licence Portfolio

Public User

PUBLIC MAP PORTALONLINE MINING CADASTRE TRANSACTIONAL PORTAL

FLEXICADASTREINTERNAL AND EXTERNAL DATA DISTRIBUTION

TEAM BEHIND FLEXIMRA Regulatory Operations

Administrators Louie Kawale James Vuvu (Cartographer)

Clusters Registration & Maintenance Team Dealings Hearing Team Assessment Team Management Team

MRA IT

Manager IT & Team

Spatial Dimensions (now Trimble) Eva Stredder (Sydney), Charles Young and Team (Cape Town).

BENEFITS OF ‘FLEXI’

Internally Tracking of Applications have improved. Reporting of tenement status improved. Management of tenement work improved. Internal transfer of data improved (e.g. annual reports to library upon expiry

or surrender).

Externally Information on status of applications is available on Map Portal for public Option for tenement holders to manage obligations directly is available

(e.g.report submissions and rental payments) Improved transparency of mineral tenement applications Collaboration with other government agencies is improved (e.g. OCCD/JICA,

landuse mapping project).

8

CHALLENGES

• Internet dependent • Cloud solution is therefore vital for when online

applications.

• Needs commitment from associates to ensure data is up to date.• Incorporated performance management framework.

• Lack of legislation supporting online application option.

• Needs all tenement holders to use to refine.

9

ONLINE TRANSACTIONAL PORTAL USERS

Number of active portal users 33

Registered by Cadastre Office in Person

Representing one or more companies

29

Representing the user in his/her personal capacity

2

Representing the user AND one or more companies

2

No. of Flexicadastre Legal Entities (Peopl or Companies) represented by Active Portal Users

58

10

OVERVIEW OF VISITS TO MAP PORTAL

11

NEXT STEPS TO BETTER…

Workshop to introduce the online transactional portal.

Increased use of portal to improve quality of Flexi.

Encourage users to make suggestions via email tenementsinfo@mra.gov.pg

12

THANK YOU FOR YOUR TIME

13