Post on 20-Oct-2021
transcript
INSTALLATION OF
FOR THE
CONSTRUCTION DRAWINGS
SHEET NO. TITLE FILENAME
DRAWING NO. PM152CV1
SHEET NO. TITLE FILENAME
INDEX TO TRANSMISSION DRAWINGS
INDEX TO SUBSTATION DRAWINGS
INVITATION FOR BIDS # 085-16
LOCATION MAP
NOT TO SCALE
PROJECT LOCATION7754 POINT MEADOWS DRIVE
Point
Meado
ws Dr
Baymeadows Road Baymeado
ws Rd East
Baymeadows Road Baymeado
ws Rd East
15 OF 15
14 OF 15
13 OF 15
12 OF 15
11 OF 15
10 OF 15
9 OF 15
8 OF 15
7 OF 15
6 OF 15
5 OF 15
4 OF 15
3 OF 15
2 OF 15
1 OF 15
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
TR1304.DWG
PROJECT # 8001210 AND 8001208
AND RELAY ENGINEERING
TRANSMISSION, SUBSTATION,
PROJECT DESIGN SEGMENT 20410
946/956 INTERCONNECT
& TRANSMISSION CIRCUIT
230/26KV SUBSTATION
POINT MEADOWS
STR #113A TO #114 STRINGING CHART
STR #113B TO #113A STRINGING CHART
STR #S11(B) TO #113B STRINGING CHART
STR #112B TO #S11(A) STRINGING CHART
STR #112A TO #112B STRINGING CHART
STR #110 TO #112A STRINGING CHART
STR #113B CONFIGURATION
STR #113A CONFIGURATION
STR #112B CONFIGURATION
STR #112A CONFIGURATION
FOUNDATION DESIGN
DETAILS A AND B
PLAN / PROFILE
NOTES / STANDARDS / LEGEND
COVER SHEET
80 OF 80
79 OF 80
78 OF 80
77 OF 80
76 OF 80
75 OF 80
74 OF 80
73 OF 80
72 OF 80
71 OF 80
70 OF 80
69 OF 80
68 OF 80
67 OF 80
66 OF 80
65 OF 80
64 OF 80
63 OF 80
62 OF 80
61 OF 80
60 OF 80
59 OF 80
58 OF 80
57 OF 80
56 OF 80
55 OF 80
54 OF 80
53 OF 80
52 OF 80
51 OF 80
50 OF 80
49 OF 80
48 OF 80
47 OF 80
46 OF 80
45 OF 80
44 OF 80
43 OF 80
42 OF 80
41 OF 80
40 OF 80
39 OF 80
38 OF 80
37 OF 80
36 OF 80
35 OF 80
34 OF 80
33 OF 80
32 OF 80
31 OF 80
30 OF 80
29 OF 80
28 OF 80
27 OF 80
26 OF 80
25 OF 80
24 OF 80
23 OF 80
22 OF 80
21 OF 80
20 OF 80
19 OF 80
18 OF 80
17 OF 80
16 OF 80
15 OF 80
14 OF 80
13 OF 80
12 OF 80
11 OF 80
10 OF 80
9 OF 80
8 OF 80
7 OF 80
6B OF 80
6A OF 80
5B OF 80
5A OF 80
4 OF 80
3 OF 80
2 OF 80
1 OF 80
STATION SERVICE AND YARD PANELS
FIBER DETAILS
DISTRIBUTION CONDUIT DETAILS
CONDUIT DETAILS SHEET 4
CONDUIT DETAILS SHEET 3
CONDUIT DETAILS SHEET 2
CONDUIT DETAILS SHEET 1
FIBER CONDUIT PLAN
DISTRIBUTION CONDUIT PLAN
SECURITY CONDUIT PLAN SHEET 2
SECURITY CONDUIT PLAN SHEET 1
EQUIPMENT CONDUIT PLAN SHEET 2
EQUIPMENT CONDUIT PLAN SHEET 1
GROUDNING DETAILS SHEET 3
GROUDNING DETAILS SHEET 2
GROUNDING DETAILS SHEET 1
GROUNDING PLAN
CONTROL HOUSE DETAILS SHEET 2
CONTROL HOUSE DETAILS SHEET 1
CONTROL HOUSE RACEWAY PLAN
CONTROL HOUSE ELECTRICAL PLAN
CONTROL HOUSE ARRANGEMENT PLAN
CONTROL HOUSE PLUMBING DETAILS
CONTROL HOUSE PLUMBING PLAN
CONTROL HOUSE CONSTRUCTION DETAILS
CONTROL HOUSE SECTIONS SHEET 2
CONTROL HOUSE SECTIONS SHEET 1
CONTROL HOUSE ELEVATIONS
CONTROL HOUSE PLAN
CONTROL HOUSE NOTES
FOUNDATION DETAILS SHEET 3
FOUNDATION DETAILS SHEET 2
FOUNDATION DETAILS SHEET 1
FOUNDATION PLAN
ELECTRICAL DETAILS SHEET 3
ELECTRICAL DETAILS SHEET 2
ELECTRICAL DETAILS SHEET 1
26KV ELECTRICAL SECTIONS C, D, E, F, G
230/26KV ELECTRICAL SECTIONS C, D, E, F
230KV ELECTRICAL SECTIONS A, B
26KV ELECTRICAL PLAN
230KV ELECTRICAL PLAN
MASTER ELECTRICAL PLAN
SINGLE LINE DIAGRAM
LANDSCAPE IRRIGATION PLAN SHEET 2
LANDSCAPE IRRIGATION PLAN SHEET 1
LANDSCAPE PLAN SHEET 3
LANDSCAPE PLAN SHEET 2
LANDSCAPE PLAN SHEET 1
PEDESTRIAN TRAFFIC CONTROL
TRAFFIC CONTROL SHEET 4
TRAFFIC CONTROL SHEET 3
TRAFFIC CONTROL SHEET 2
TRAFFIC CONTROL SHEET 1
EROSION CONTROL SHEET 3
EROSION CONTROL SHEET 2
EROSION CONTROL SHEET 1
WATER AND SEWER DETAILS
WATER AND SEWER PLAN
GATE DETAILS
FENCING DETAILS SHEET 2
FENCING DETAILS SHEET 1
SITE DETAILS SHEET 3
SITE DETAILS SHEET 2
SITE DETAILS SHEET 1
DRAINAGE PLAN SHEET 2
DRAINAGE PLAN SHEET 1
GRADING PLAN
ACCESS ROAD SHEET 3
ACCESS ROAD SHEET 2
ACCESS ROAD SHEET 1
RETAINING WALL SHEET 3
RETAINING WALL SHEET 2
RETAINING WALL SHEET 1
SITE PLAN SHEET 4
SITE PLAN SHEET 3
SITE PLAN SHEET 2
SITE PLAN SHEET 1
CLEARING AND TREE REMOVAL SHEET 2
CLEARING AND TREE REMOVAL SHEET 1
GENERAL NOTES
COVER SHEET
PM152LV1.DGN
PM152CD6.DGN
PM152CD5.DGN
PM152CD4.DGN
PM152CD3.DGN
PM152CD2.DGN
PM152CD1.DGN
PM152CP6.DGN
PM152CP5.DGN
PM152CP4.DGN
PM152CP3.DGN
PM152CP2.DGN
PM152CP1.DGN
PM152GD3.DGN
PM152GD2.DGN
PM152GD1.DGN
PM152GP1.DGN
PM152CE5.DGN
PM152CE4.DGN
PM152CE3.DGN
PM152CE2.DGN
PM152CE1.DGN
PM152PB2.DGN
PM152PB1.DGN
PM152CH6.DGN
PM152CH5.DGN
PM152CH4.DGN
PM152CH3.DGN
PM152CH2.DGN
PM152CH1.DGN
PM152FD3.DGN
PM152FD2.DGN
PM152FD1.DGN
PM152FP1.DGN
PM152ED3.DGN
PM152ED2.DGN
PM152ED1.DGN
PM152E52.DGN
PM152E51.DGN
PM152E91.DGN
PM152EP3.DGN
PM152EP2.DGN
PM152EP1.DGN
PM152SL1.DGN
PM152IR2.DGN
PM152IR1.DGN
PM152LP3.DGN
PM152LP2.DGN
PM152LP1.DGN
PM152TC5.DGN
PM152TC4.DGN
PM152TC3.DGN
PM152TC2.DGN
PM152TC1.DGN
PM152EC3.DGN
PM152EC2.DGN
PM152EC1.DGN
PM152WD1.DGN
PM152WP1.DGN
PM152SD6.DGN
PM152SD5.DGN
PM152SD4.DGN
PM152SD3.DGN
PM152SD2.DGN
PM152SD1.DGN
PM152GR3.DGN
PM152GR2.DGN
PM152GR1.DGN
PM152RD3.DGN
PM152RD2.DGN
PM152RD1.DGN
PM152RW3.DGN
PM152RW2.DGN
PM152RW1.DGN
PM152SP6.DGN
PM152SP5.DGN
PM152SP4.DGN
PM152SP3.DGN
PM152SP2.DGN
PM152SP1.DGN
PM152GN1.DGN
PM152CV1.DGN
BR2
BR2 90°
BASELINE
EAST-WEST
BA
SE
LIN
E
NO
RT
H-S
OU
TH
PP3PP2
PP1
19'-0"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
12'-0"
14'-0"
21'-0"16'-0"24'-0"18'-9"15'-6"11'-0"14'-0" 8'-0"21'-0"
5'-0"6'-6"6'-6"5'-0"5'-6"
5'-6"5'-6"
28'-0"
19'-0"
19'-0"
28'-0"
28'-0"
21'-0"
21'-0"
28'-0"
6'-6"
6'-6"
14'-0"
12'-0"
12'-0"
14'-0"
S11 S11
S11S11
S12 S12
S17
S17
1'-0"
S17
S17
S17
S17
1'-0"
S12 S12S12
S12 S12S12
S12 S12
S12 S12
S12
S12 S12
S12
S12
S12
S12 S12
S11
BR1
BR1
BR1
BR1
7'-6"
10'-9"
S1
S1
S1
S1 S1
S1
S1
S1 S1
S2
S3
S3S3
S3
S3
S3
S3
S3
S3S3
S3
S3 S3
S3
S4S4
S1
10'-0"
10'-0"
12'-6" 2'-0"
CB1
BR2
8'-0"21'-0"21'-0"16'-0"24'-0"
5'-0" 6'-6"6'-6"
3'-0"
5'-0"
2'-0"
6'-6"
13'-3"
6'-0"6'-0"5'-0"
ENGINEERING
DRAFTING
BY
BY
DATE
DATE
DESIGN FILENAME:
DRAWING NO.:
SHEET NO.:
SCALE: IFB. NO.:
DESIGNED
CHECKED
APPROVED
PRELIMINARY
FINAL DESIGN
AS BUILT
BY DATE APPROVEDNO. REVISIONS TO DRAWING
PROJECT DESIGN SEGMENT 20410
1
230/26kV LOW PROFILE SUBSTATION
2 JWR
JWR
JWR
3
LJG 4-28-15
4-28-15
4-28-15
4-28-15
INSTALLATION OF POINT MEADOWS SUBSTATION
FOUNDATION PLAN
PM152FP1.DGN
PM-23026-15
47 OF 80
030' 30' 60'15'
1" = 15'
S18
S18
S18
JWR LJG
TR1
085-16
83'-10 7/8 "
4'-2"
3'-4"
1.
FOUNDATION PLAN NOTES
2.
POLES, ETC. ARE SHOWN ELSEWHERE IN THIS DRAWING SET.
FOUNDATIONS FOR THE CONTROL HOUSE, HVAC UNITS, PERIMETER SECURITY
FOUNDATIONS ONLY FOR MAJOR SUBSTATION YARD EQUIPMENT ARE SHOWN HERE.
3.
4.
NOT MOVE IN A HORIZONTAL DIRECTION.
JUMPER FROM BUS WILL DROP IN A STRICTLY VERTICAL DIRECTION AND DOES
(S17) HAVE BEEN OFFSET BY A DISTANCE OF ONE (1) FEET SO THAT THE
A-FRAME. THE FOUNDATIONS FOR THE SINGLE PHASE POTENTIAL TRANSFORMERS
STRUCTURES. THE CENTER OF 230KV BREAKERS SHOULD MATCH THE CENTER OF
BR2 FOUNDATIONS WITHIN THE VICINITY OF THE SUBSTATION A-FRAME
THE CONTRACTOR SHOULD PAY CLOSE ATTENTION WHEN INSTALLING THE S12 AND
REPORT AND ABIDE BY THEM.
ATTENTION TO THE SITE PREPARATION RECOMMENDATIONS OUTLINED BY THE
DOCUMENTS OF THIS PROJECT. THE CONTRACTOR SHALL PAY SPECIFIC
ASSOCIATES ENGINEERING," AND IS ATTACHED AS AN APPENDIX TO BIDDING
SUBSURFACE SOIL CONDITIONS. THIS REPORT WAS PREPARED BY "MESKEL &
GEOTECHNICAL EXPLORATION REPORT FOR INFORMATION REGARDING THE SITE
IT IS OF EXTREME IMPORTANCE FOR THE CONTRACTOR TO REVIEW THE
REMOVAL, SOIL EXCAVATION AND/OR BACKFILLING.
RECOMMENDATIONS FOR SITE PREPARATION, COMPACTION REQUIREMENTS, MUCK
THE CONTRACTOR SHALL FULLY ADHERE TO THE GEOTECHNICAL SOIL REPORT
SEE FD1 NOTE 16 FOR THE INSTALLATION OF 85' PROBE POLES (PP1~PP3)
S4
S2
S11 S11
S11
7'-6"
7'-6"
05-12-16ADDED MORE ANCHOR BOLTS TO BR1
BASELINE
EAST-WEST 90°
SP2
X
X
X
XXXX XXX
X
X
X
X
XX
XX
XX
X
CONTROL HOUSE
XX
X
XX
XX
XX
XX
XXXXX
X
XX
X
X
X
SP3