1. INRODUCTION AND GOALS

INTRODUCTION

I am glad to introduce by myself. My name is Hyunjong Choi who is enrolled in the Building Renova-

tion Technician Program at George Brown College in Toronto.

I am currently learning skills involved in the building construction, such as how to use various tools,

how to build efficiently. I also have good communications and teamwork skills through several group

projects; wall framing, roof framing, stairs, ceiling, and so on.

I intend to graduate April 2017. For practicing what I have learned at college, I have been working

at a construction site of Habitat for Humanity GTA as a volunteer since October 2016.

GOALS

1. Successfully graduating from college with good grades.

2. Continually self-develop skills.

3. By working with strong sense of responsibility, contributing to company success.

4. Taking construction managements program to achieve higher position in company.

5. Building my house by myself in the future.

3 of 23

2. RESUME

CAREER OBJECTIVE

To attain a position as responsible employee to utilize my skills and abilities in the field of Construc-

tion that offers professional growth while being active, creative, and innovative.

EDUCATION

Building Renovation Technician 2016 -

Present George Brown College Toronto, ON

Bachelor of Science 2001 -

2009 Chungbuk National University Chungbuk, Republic of Korea College of Natural Science Major : Earth and Environmental Sci-ence

WORK EXPERIENCE

Volunteer 2016 -

Present Habitat for Humanity GTA Scarborough, ON

Assistant Manager of Project Management 2012 –

2015 KTI Engineering & Construction Co., Ltd. Seoul, Republic of Korea

4 of 23

3. EDUCATION

Building Renovation Technician (T110) – George Brown College (for 2 years 2016 – 2017)

• Interior Millwork & Finishes

• Residential Building Renovation & Restore

• ICI Renovation & Restoration

• Associated Trades

Weeks Shops01 - 07 Hand Tools / Joinery & Trim / Kitchen Cabinet

09 - 15 Stairs Calculations & Assembly

Weeks Shops01 - 07 Wood Foundation / Walls / Ceiling / Sidings

09 - 15 Roofs / Shingles / Dormer

Weeks Shops01 - 07 Steel Frames / Drywalls / Mudding / Ceiling

09 - 15 Concrete Frameworks / Leveling

Weeks Shops01 - 07 Electrical / Plumbing

09 - 15 Masonry / HVAC5 of 23

3. EDUCATION

Interior Millwork & Finishes

◀ Trim

•Some tips for using hand tools

•Properly cutting and installing small-scaled mould-

ings

•Fundament construction rules

Kitchen Cabinet ▶

• Starting with basic furniture

• How to use power tools

• Layout cabinet

6 of 23

3. EDUCATION

Interior Millwork & Finishes

◀ Stairs Calculations & Assembly

•Interpreting layout of stairs

•Calculation of rise, run, tread, and

handrails

•Open and closing stringers

•Stair codes

•Assemble the stairs

7 of 23

3. EDUCATION

Residential Building Renovation & Restore

◀ Wood Foundation / Walls / Ceiling / Sidings

•Layouts for foundation, wall fames, and doors

•Assemble of walls and joists

•Calculation of door and wall sizes

Roofs / Shingles / Dormer ▶

• Layouts for roof rafters, shingles, and trusses

• Calculation of rafters, trusses, and dormers

• Equal roof framing

• Making dormers

• Theory of OBC (Ontario Building Codes)8 of 23

3. EDUCATION

ICI Renovation & Restoration

◀ Steel Frames / Drywalls / Mudding / Ceiling

•Unequal slope roof

•Steel framing

•Drywall

9 of 23

3. EDUCATION

ICI Renovation & Restoration

◀ Steel Frames / Drywalls / Mudding / Ceiling

•Openings (Door / Window / Skylight / Arch opening)

•Bulkhead with steel material

•Mud coating

•Ceiling layout & framing

10 of 23

3. EDUCATION

ICI Renovation & Restoration

Concrete Frameworks

•Layout foundations & footings

•Label & square

•Concrete forms for footings, stairs, and flat-

form

11 of 23

4. WORK EXPERIENCE

Block A

Habitat for Humanity GTA Volunteer - Build Site

•Location : 140 Pinery Trail, Scarborough, ON

•3 three-stories buildings for total fifty residential

units

- Block A (3 stories / 15 units)

- Block B (3 stories / 15 units)

- Block C (3 stories / 20 units)

•On December 2016, it is currently under construc-

tion

since August as phase 1. 12 of 23

4. WORK EXPERIENCE

•Education for safety

•Floor joists on 1st floor

•Installation particle wall frames

•Fastening door frames

•Installation insulations between basement & 1st floor

13 of 23

4. WORK EXPERIENCE

•Teamwork : Moving LVL beams on place

•Cutting & installation LVL beams prop-

erly

14 of 23

4. WORK EXPERIENCE•Production of simple tables, benches, & shelves

•Assemble scaffoldings

15 of 23

4. WORK EXPERIENCE

•Using variety power tools for cutting & fastening LVL beams;

reciprocating saws, nailing guns, & pneumatic staple guns

• Layout LVL beams & floor joists for 2nd floor

• Working at height safely

• Installation guardrails on 2nd floor

16 of 23

4. WORK EXPERIENCE

KTI Engineering & Construction Co., Ltd. - Head office

•Location : Gangnam, Seoul, South Korea

•Tel : +82-2-574-8886

•Homepage : http://www.ktienc.co.kr

•Position : Assistant Manager

•Department : Overseas Business Division

•Employment Period : 2012 - 2015 (for 3 years)

•Responsibilities

- Project management : 12 projects in the world

- Analyzing daily, weekly, & monthly reports of

sites

- Management of progress payment

- Management of manpower for projects

- Purchase and delivery of materials

- Quality & environment management system

(ISO 9001 & 14001) 17 of 23

4. WORK EXPERIENCE

• Projects in charge

Ain Arnat 1200MW CCPP Project

•Country : Algeria

•Owner : CEEG. Spa

•Period : Jul. 2013 ~ Feb. 2016

•Work Scope : Equip’ Installation & Piping Work

•Value (US$) : 11,489,624

A’seeb Sewage Treatment Plant Project-OCU Installation

• Country : Oman

•Owner : Haya Water

•Period : Nov. 2011 ~ Feb. 2013

•Work Scope : Equip’ Installation & Piping Work

•Value (US$) : 5,867,000

18 of 23

4. WORK EXPERIENCE

• Projects in charge

New Haripur Power Plant Development Project

• Country : Bangladesh

•Owner : EGCB

•Period : Oct. 2011 ~ Jul. 2013

•Work Scope : Equip’ Installation & Piping Work

•Value (US$) : 6,793,326

Habshan-5 Utility & Offsites Project

• Country : UAE

•Owner : GASCO

•Period : May. 2010 ~ Sep. 2012

•Work Scope : Steel Structure, Equip’ Installation &

Piping Work

• Value (US$) : 14,259,89919 of 23

5. CERTIFICATIONS

•Working at Heights

- Theory & Fundamentals of Fall Prevention

•Driver License (G)

•Carpentry Certification (will be updated soon)

20 of 23

5. CERTIFICATIONS

•Employment Certificate of KTI E&C

•Graduation Certificate of Chungbuk National Univer-

sity

•Microsoft Office Specialist Master

21 of 23

6. REFERENCES

Study plan

2016 Winter 2016 Spring 2016 Fall 2017 Winter

Architectural Plan Interpretation I

Residential Building Renovation &Restoration

ICI Renovation & Restoration Associated Trades

Applied Theory & ApplicationBuilding Science &

EnvironmentInterior Millwork &

FinishesMethods of

Measure

Site Management & Construction

Safety

Architectural Plan Interpretation II

DeconstructionMethods

Estimating

ConstructionLayout & Rigging

Math for BuildingTechnologies 2 Portfolio

Professional Communication

for BuildingTechnologies

22 of 23

THANK YOU