Portobello & CraigmillarEnvironment Forum
February 2013
East Neighbourhood Roads Services
2
This presentation will:
• Introduce the East Roads Team• Talk about what they do and their
responsibilities• Focus on the Portobello and Craigmillar Action
Plan• Update you on current NEPS and other
projects; and invite suggestions for future works
• Invite you to participate in a ‘mini workshop’
3
Who are the East Roads Team?
James HunterEast Environment
Manager
Scott ThomsonCommunity Parks
Officer
Andy MathesonEast Area Roads
Manager
Andy HunterTask Force Manager
Katie QuinnESDO
Russell LintonPark Ranger
Willie BarkerRoads Officer
(Ward 14)
Keith AllisonRoads Officer
(Ward 17)
Andy PringleRoads Inspector
(Ward 17)
Tam FairgrieveRoads Inspector
(Ward 14)
4
What are we responsible for?Ward 14 – Craigentinny and Duddingston:Category 1 Roads- 6.7kmCategory 2 Roads- 9.1kmCategory 3 Roads- 7.5kmCategory 4 Roads- 47.4km
Total = 70.7km
Ward 17 – Portobello and Craigmillar:Category 1 Roads- 19.1kmCategory 2 Roads- 4.2km Category 3 Roads- 6.6kmCategory 4 Roads- 63.3km
Total = 93.2km
5
What are we responsible for?
• Inspection and maintenance of roads and pavements
• Co-ordinating utility works• Allocating disabled parking spaces• Organising road markings and general road
repairs• Providing permits (for scaffolding, skips, etc).
94 permits have been processed by the team since March 2012
6
What are the team’s key work priorities?
• Inspection of roads and pavements• Coordinating road works through the Road Register• Defect repairs• Weather emergencies• Right First Time• Administer Capital and Revenue road repair budgets• NEP projects• Customer enquiries including accident and property damage
claims• Process traffic orders• Large scale works on the road network:- New traffic signals at Milton Road junction and both Newcraighall Road junctions
with A1.
7
How can I report an issue?
• Call the Clarence switchboard on 0800 232323, or email clarence@edinburgh.gov.uk
• Contact the East Environment Team on 0131 529 3298, or at eastenvironment@edinburgh.gov.uk
• Attend Environment Forum meetings and complete New Local Issues forms
8
Portobello and Craigmillar Community Plan Actions• Publicise Neighbourhood Environment Programme budget: Members of the public
were asked for project nominations; and decisions were agreed by the Environment Forum in March 2012
• Nominations for 2013 projects: A bus tour took place in November 2012, to invite suggestions for 2013 projects. Nominations are invited at the end of this meeting
• Receive updates on NEP projects progress: A written report of actions is provided at each meeting.
• Encourage local reporting of roads & pavement issues through ‘Local Issues’ reporting form: the New Local Issues form is distributed at each meeting
• Walking and cycling on the Promenade and Eastfield: markings are being installed at entrances to Portobello Prom, to advise that it is part of Core Path Network (open to pedestrian, cyclists, horse riders)
• Identify and solve accident black spots. Examples include the Jewel to Asda rat-run: A mini workshop at the end of this meeting invites you to give us your thoughts on potential black spot areas in Ward 17.
9
Current Projects:Right First Time
• Right First Time is an ongoing project to permanently repair defects on roads and pavements throughout the city
• A repair squad is working within East Neighbourhood to repair defects up to 10m2 in size. If there are defects bigger than this, they will be identified and repaired at a later date
• Recent locations in Ward 17 include Regent Street, Marlborough Street, Niddrie Mill, the Cleekim’s and Wisp Green.
• Approximately £400k spent on this project in East Neighbourhood in 2012/ 2013
10
Recent Projects:Local Capital Funded Improvements
Resurfacing works in:-• Lee Crescent
• East Brighton Crescent
11
P&C NEP Project Update: 2012/2013
12
Craigmillar Castle Footway Link:
• Form new footway linking cycling/walkway to castle car park
• The East Roads Team is currently liaising with Historic Scotland, city archaeologist; and contractor
• Proposed completion date: end of March 2013
13
Coillesdene Sheltered Housing
• Upgrade areas of footways by resurfacing with hot rolled asphalt
• Locations have been agreed with sheltered housing representative
• Contractor planned to start 11 Feb 2013
• Proposed completion date: early March 2013
PHOTO
14
Niddrie House Park
• New street lighting layout
• Awaiting update from Street Lighting Team regarding lighting upgrade.
• Negotiating with contractor regarding footway resurfacing
• Proposed completion date: end of March 2013
15
Joppa Plaza
• Improvements to band stand, drainage channels, surface and seating area
• Environment Forum to decide which seating is to be installed from options provided by the Roads Team
• Work is in progress. Tree grills now removed, channels have been cleaned out & tested
• Proposed completion date: early March 2013
PHOTO
16
Bath Street
• Installation of bollard
• Project completed mid Feb 2013
17
Moffat Way
• Upgrades to road signage and railings
• Liaising with Road Safety/ Development Control. Design is currently in progress
• Proposed completion date: beginning of March 2013
18
Niddrie Mains Road
• Link footway and desire lines at the Hays
• Order currently with ERS, start mid Feb 2013
• Proposed completion date: mid March 2013
19
NEP Project Nominations:2013/ 2014
Tell us where we can make improvements in the next financial year
Complete the nomination forms provided and hand them in to a member of staff.
Alternatively, email eastenvironment@edinburgh.gov.uk with your
nomination
20
Mini Workshop
• Please help us by giving us your thoughts on how we can better publicise the NEP schemes
• Identify potential accident black spots using the maps of Ward 17
21
Thank You
Any Questions?