OPERATORSEnvironmenta
l StrategiesDIV
FINANCE CORPORATE LEADERS
What makes us different
waste power generation system recycles wasted exhaust velocityproviding a stable Power System
For on and off grid operationsThe “green” factor is a bonus
The concept
What if we had a wind power system that didn’t rely on the wind”
Original Sketch circa 2009
Who are we
• 45 Innovations• Inventors• Partners
How it works
• Kinetic energy• Velocity from exhaust
drives cage• Generates power• For a video of the system
working please go to downloads on our site. Or click here if you have an internet connection
The Alpha Prototype
• 2009 R & D began Patent Application• Feb 2010 Proof of Concept
– Failing 600 hp compressor• Goal of 2.5 KW • Result: output of 3.2kw (at 55%)• Other Findings
– Backpressure – non issue– Varying wind and cold temp – no effect
45 85 85 89 94 96 96 96 96 98 98 102 102 102 102 102 102 104 104 104 107 109 114 114 1140
0.5
1
1.5
2
2.5
3
3.5
4
POWERSTACK kW/RPM CHART
kW/RPM
RPM
kW O
utpu
t
The Alpha Prototype
Revisions:• Increase efficiency• Improve components• Keep it simple• Pre Production
Beta Prototype
“One of the best characteristics of this equipment is that its
technology is non evasive”
“Proven in a field test...no noted side
effects”
David Lario P.Eng M Sc. Mechanical EngineeringREES NDT Engineering
Beta Prototype Components
System Integration
• OFF GRID• Battery Bank• Dump Load
• ON GRID• Micro Generation Status• Inverter/ Controller Sync
Size Optimal Site size Projected Cost
1Kw 99hp + $18,000 - $30,000
5Kw 200hp + $40,000 - $60,000
10Kw 400hp + $60,000 – $80,000
50Kw 800hp + $180,000 - $240,000
Custom Larger sizes 1200hp+ Prices Vary
ON GRID
GENSET
TEGS
SOLAR
POWERSTACK
ELECTRICITY
Reduce Costs
Operating costsCapital costs
LabourFuel Gas
Increase Costs
Initial Capital for The PowerStack
Increase Revenue
Carbon CreditsSelling Excess Power
(Grid)
Decrease Revenue
Bonus BenefitsSafet
y
• Unlimited Lighting Remote Sites
• Flare stack Igniters
• No need for Gas Cat-A-Dyne Heaters
Opera
tions
• Run extra heat trace for no more freeze ups
• SCADA/ Automation
Environmental
• Reducing Greenhouse Gas Emissions
• Electric Actuators/ Motors
• Public Relations
Environmental
• Carbon Credits• Basic Calculation Created• Varies on location
• Reduction in Greenhouse Emissions• Fossil Fuels to run gensets
• Reduce Carbon Footprint
Common Technical Questions• Backpressure?• Selling back to grid?• How much power?• Back Up Generator?• Maintenance?
Next Steps
•4 Beta Prototypes
•3rd Party Verification
•First Production Models
Questions?