Project management final 15_aug2014

Post on 19-Jun-2015

230 views 6 download

Tags:

description

Project management class

transcript

RUNNING T

HE ENJO

YABLE

RACE FOR A

GOOD C

AUSE

PA

RT

I CI P

AT

I NG

MY

FI R

ST

HA

LF

MA

RA

TH

ON

AN

D F

OU

ND

RA

I SE

EV

EN

T

CONTENTS

• Project Goals

• Project Schedule

• Obstacles/Risks

• Work Breakdown Structure

• Measuring Progress

• Q&A

PROJECT GOALS

Running the enjoyable race for a good cause• Successfully finish my FIRST half Marathon

enjoyably

• Make difference for the community

• Building up my body strength and mind power by being discipline and following through my plan

• Overcoming my fear of sports along the way.

• Build up a healthy and balance lifestyle

• Create a plan for others to use on their first ½ Marathon

PROJECT SCHEDULE

Project started on June 5th and the first half Marathon on Oct 5th 2014, the duration of this project will be 4 month.

OBSTACLES/RISKS

• Injuries

• Physical limitations

• Weight changes

• Immune system overdrive

• Environment changes 

WORK BREAKDOWN STRUCTURE

MEASURING PROGRESS

Successfully finish my FIRST half Marathon enjoyablyMake difference for the communityHow to track my Training and fundraising Status ?

TRAINING STATUS

http://www.strava.com/athletes/YiChingChen

TRAINING LOG

Millstones:

FUNDRAISING STATUS

MEASURING PROGRESS

Successfully finish my FIRST half Marathon enjoyablyMake difference for the community

Q&A