Project-sheet Lonmin deepening

Post on 03-Jul-2015

20 views 0 download

description

Opencast Contract Mining, Drill, Blast, Load, Haul, Crushing

transcript

www.construction.murrob.com

LONMIN DEEPENING North-West, Marikana

PROJECT TYPE: OPENCAST MINING

CLIENT:

Eastern Platinum

VALUE:

R1.8 Billion

CONSULTANTS:

None

PROJECT DURATION:

60 Months

DATE OF PROJECT:

1 October 2009

PROJECT DESCRIPTION:

Opencast Mining of Merensky Reef to a depth of

60m.

Approximate volumes mined for the project :-

• Topsoil 1,500,000bm³

• Box cut over burden 3,425,000bm³

• Strip min over burden 31,000,000bm³

• Merensky Reef 3,170,000tons

• Rehabilitation 11,800,000m³