PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
GENERAL INFORMATION SHEET
TEST PACKAGE NO. A120-JN-PR76-NMDA-01-157
PCWBS A120
TEST PACKAGE CATEGORY AG
DISCIPLINE PH-1
SYSTEM NO. JN-PR76-NMDA-01
SYSTEM DESCRIPTION PA9T 1.9-Nonanediamine
LINE SERVICE NMDA
TEST MEDIUM V
VOLUME 0.000000 m3
TEST PRESSURE - MPa
DESIGN PRESSURE 1.0 MPa MPa
TEST DURATION 0
REMARKS
Copyright MODS 2022
Page 1 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Contents ListID Description Yes No
1 TEST PACKAGE COMPOSITION SHEET Yes2 TRACING SCHEDULE LIST Yes3 LINE LIST Yes4 Tubing Inspection Yes5 Legend Yes6 Notification of P&ID Change Yes7 MARKED-UP P&ID Yes8 PREVIOUS MARKED-UP SPOOL DRAWING Yes9 MARKED-UP SPOOL DRAWING Yes
10 INSPECTION STATUS REPORT Yes11 ISR (VM) Yes12 OTHER INSPECTION REPORT (If any) Yes13 LEAK TEST REPORT FOR REINFORCED PAD (If applicable) Yes14 BOLT TORQUE/TENSIONING REPORT SUMMARY Yes15 BOLT TORQUE/TENSIONING REPORT SUMMARY(VM) Yes16 PIPE SPOOL CLEANING REPORT SUMMARY Yes17 PIPE SPOOL CLEANING REPORT (VM) Yes18 SPECIAL PIPE SUPPORT DRAWING (If applicable) Yes19 PUNCH LIST (JGC CONST) Yes20 PUNCH LIST (JGC ENG) Yes21 PUNCH LIST (JGC QC) Yes22 PUNCH LIST (OWNER) Yes23 TEST INSTRUMENT TRACEABILITY SHEET/CALIBRATION CERTIFICATION Yes24 TEST MANIFOLD PRESSURE TEST REPORT, MEASURING TESTING EQUIPMENT CALIBRATION CERTIFICATION Yes25 BLIND CONTROL LIST Yes26 HYDRO TEST WATER CERTIFICATE Yes27 PRE-TEST CHECKLIST Yes28 PIPING PRESSURE TEST ACCEPTANCE RECORD Yes29 DEWATERING, DRYING AND CLEANLINESS RECORD Yes30 POST-TEST CHECK LIST AND REINSTATEMENT ACCEPTANCE RECORD Yes31 LEAK TEST RECORD Yes32 STRAINER MESH Yes33 Latest Spool Drawing No
Copyright MODS 2022
Page 2 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Control LogID Activity Name
(PIC Handling Original TP) Date Discipline(In Charge of Original TP)
1 TP DRAFT Julius de los Reyes 11-Feb-2021 TPC2 TP SUBMISSION Arbhe Agulo 15-Feb-2021 TPC3 TP APPROVED Avelino Arnado 16-Feb-2021 TPC4 Joint Locked Avelino Arnado 16-Feb-2021 TPC5 Appd TP to Subcon Avelino Arnado 16-Feb-2021 TPC6 L/C issue to CNS Avelino Arnado 14-Jul-2021 TPC7 CNS P/L Return Tawee Kongsommart 15-Jul-2021 SV8 CNS P/L to Subcon Tawee Kongsommart 15-Jul-2021 SV9 RMC Tawee Kongsommart 09-Dec-2021 SV
10 TPC Drawing Check Prapoum Phupradub 10-Dec-2021 TPC11 L/C issue to QC/ENG Prapoum Phupradub 10-Dec-2021 TPC12 ENG P/L Return Yusuke Kunii 15-Dec-2021 ENG13 QC P/L Return PASUCHAR EAKSONGKIAT 15-Dec-2021 QC14 QC P/L to Subcon PASUCHAR EAKSONGKIAT 15-Dec-2021 QC15 TPC Punch A Check. Avelino Arnado 15-Dec-2021 TPC16 ENG Punch A Comp. Avelino Arnado 15-Dec-2021 TPC17 QC Punch A Comp. N/A 15-Dec-2021 TPC18 ENG Punch A Conf. ARNEL GUMANIT 16-Dec-2021 ENG19 QC Punch A Conf. PASUCHAR EAKSONGKIAT 16-Dec-2021 QC20 JGC Punch A Conf. PASUCHAR EAKSONGKIAT 16-Dec-2021 QC21 L/C issue to OWNER Avelino Arnado 16-Dec-2021 TPC22 OWNER P/L Return Gomes Limlamai 18-Dec-2021 OWNER23 OWNER P/L to Subcon Gomes Limlamai 18-Dec-2021 OWNER24 OWNER Punch A Comp. N/A 18-Dec-2021 SV25 OWNER TPCPunchA Comp N/A 18-Dec-2021 TPC26 OWNER Punch A Conf. N/A 18-Dec-2021 OWNER27 RFT Avelino Arnado 19-Dec-2021 TPC28 RFT TP to Subcon Avelino Arnado 19-Dec-2021 TPC29 Tested N/A 20-Dec-2021 QC30 Drain N/A 20-Dec-2021 TSV31 Drain inspection N/A 20-Dec-2021 QC32 Plug Seal Weld N/A 20-Dec-2021 QC33 Subcon TP Return N/A 20-Dec-2021 TPC34 TP to Paint/Insu. N/A 20-Dec-2021 TPC35 PIP H/O to PCOM Takuma Suzuki 20-Dec-2021 TPC36 1st Reins Request Takuma Suzuki 20-Dec-2021 COM37 1st Reins Completed Takuma Suzuki 20-Dec-2021 PIP38 1st Reins Confirmed Takuma Suzuki 20-Dec-2021 COM39 Return TP from PCOM Mark Lausing Valenzuela 21-Dec-2021 COM40 Reins issue to CNS Mark Lausing Valenzuela 21-Dec-2021 TPC41 CNS Punch B Conf. Takuma Suzuki 28-Dec-2021 SV42 Reins TP to QC/ENG Takuma Suzuki 28-Dec-2021 TPC
Copyright MODS 2022 Page 3 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
ID Activity Name(PIC Handling Original TP) Date Discipline
(In Charge of Original TP)
43 QC/ENG Punch B Comp. TPC44 QC/ENG Punch B Conf. TPC45 OWNER Punch B Comp. TPC46 OWNER Punch B Conf. OWNER47 Punch to VMC TPC48 TP issue to INST TPC49 TP issue to PCOM TPC50 TP issue to ELEC TPC51 TP to H/O Team TPC
Copyright MODS 2022
Page 4 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Composition SheetNo P&ID No. Sheet No. Revision
1 D-PU70-1225-621 Sheet 1 Of 1 5
No Spool Drawing No. Sheet No. Revision
1 A120-RL-76920 1 0A2 A120-RL-76920A 1 F1A3 A120-RL-76920B 1 F1A
Copyright MODS 2022 Page 5 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022No Spool Drawing No. Sheet No. Revision
Copyright MODS 2022
Page 6 of 34
PROJECT NAME : PROJECT HARMONY
JOB CODE : 0-8008
DOC. NO. : S-PU00-1360-001 OWNER DOC. NO.:
DOC. TITLE : PIPING LINE LIST (LINE INDEX) FOR COMMON
REV.5
Density Temp.Press.
(Alt)
Temp.
(Alt)
Max.
Temp.
Min.
Temp
Press.
(Alt)
Max.
Temp. (Alt)
Steam
OutPress. Temp. Press. Temp. Press. Temp.
Fluid
(Note2)Press. Press. Temp.
Unit
No.Seq.#
Type
(Class)
Operation
Temp. Class(L/V/P) kg/m3 MPa.g Torr degC MPa.g degC MPa.g Torr degC degC MPa.g degC Y/N MPa.g degC MPa.g degC MPa.g degC (P/H/V) Mpa.g Mpa.g degC degC
RL 76 920 - V3E - - - - RL-76920 V-7629 MISC - L 810 0.05 - 60 - - - 1.0 - 120 - - - Y - - - - - - H 1.50 - - - KP-7619 D-PU70-1225-621
Stream No.
(Line No.) RemarkRev.
Fluid Terminal Points
Phase
(Note1)
Fluid
Symbols
Pipe Size
(Max Line Size)
Piping Spec.
(Line Class)
Insulation Class
Trace
Code
Earth
BondingFROM TO
Heat
Tracing
Temp. KRR
DWG No.Line number
DWG No.
Operating Condition Design ConditionShort Term
Condition
Relieving
Condition
Shut-off
Condition
Press.
Alt.
Operation
Press.
TestVacuum
Condition
1 of 1 Page 7 of 34
Page 8 of 34
Page 9 of 34
Page 10 of 34
Page 11 of 34
Page 12 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Welded NDE SummarySpool Dwg No. Weld
JointPiece
No Line No WeldType Size Line
ClassSubcon
Code Penalty Production WeldedDate
WpsNo.
WelderNo.
WorkOn RT No. Repair Defects PWHT VT HT UT FT PT MT PMI
No results foundDate Name
Accepted ByJGC QC 15-Dec-2021 PASUCHAR EAKSONGKIAT
Owner QC 18-Dec-2021 Gomes LimlamaiWelder Work On RT Defects
R:Root Pass > 1st Layer CK:Crack ER:Excess Root PY:Porosity UC:UndercuttingF:Fill > 2nd Layer CR:Concave Root IP:Incomplete Penetration SL:Slag Inclusion or Enlongation Defect WH:Worm Holes
RF: Root Pass Fill > 1st and 2nd Layer EP:Excess Penetration LF:Lack Of Fusion TI:Tungsten InclusionCopyright MODS 2022
Page 13 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Flange Joint ReportFlange Gasket Bolts & Nuts Bolt Tightening ITR Details
Spool Dwg No. Flange Id Size Rating Gasket Bolt Material Bolt Dia Method 50% Max ITR No Inspection Date Remarks
A120-RL-76920 SA01 1 ASMECLASS 150
Bolt and Nut ASTM A193 Grade B7 /A194 Grade 2H ASME B1.1
Galvanized UNC Stud-bolt with twoHeavy HEX nuts
1/2 N/A N/A N/A ITR-6000-015-F1545 2021-07-14 00:00
Date Name
Accepted ByJGC QC 15-Dec-2021 PASUCHAR EAKSONGKIAT
Owner QC 18-Dec-2021 Gomes LimlamaiNotes
1.Bolt Tightening Method A=Manual Bolt Up B=Torque Wrench(FRP,GRE,Insulting GasKet) C=Bolt Tensioning(Bolt Size 1-1/2'' and larger)Copyright MODS 2022
Page 14 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
FIELD INTERNAL CLEANING SUMMARY REPORTSpool Drawing Number Spool Piece Number ITR Number
No results foundDate Name
Accepted By JGC QC 15-Dec-2021 PASUCHAR EAKSONGKIATCopyright MODS 2022
Page 15 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Punch layer JGC CNS Punch Layer
ID Status PCWBS Drawing Punch No. Category Type Description Created Date Created ByWork
CompletedDate
WorkCompleted
By
WorkConfirmed
Date
WorkConfirmed
ByRejected Reason Images
Included Remarks
No results foundCopyright MODS 2022
Page 16 of 34
Page 17 of 34
Page 18 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Punch layer JGC ENG Punch Layer
ID Status PCWBS Drawing Punch No. Category Type Description Created Date Created ByWork
CompletedDate
WorkCompleted
By
WorkConfirmed
Date
WorkConfirmed
ByRejected Reason Images
Included Remarks
1 Closed A120 A120-RL-76920 0A Sheet 1 of1 E-001-A A [ENGR]No
Comment [ENGR]No Comment 15-Dec-2021 Yusuke Kunii 16-Dec-2021 ARNELGUMANIT 16-Dec-2021 ARNEL
GUMANIT No
ENG ConductedDocumentation check
only, Since this isNon-Critical line
NOTE: Other drawingalso no comment
Copyright MODS 2022
Page 19 of 34
Page 20 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Punch layer JGC QC Punch Layer
ID Status PCWBS Drawing Punch No. Category Type Description Created Date Created ByWork
CompletedDate
WorkCompleted
By
WorkConfirmed
Date
WorkConfirmed
ByRejected Reason Images
Included Remarks
1 Closed A120 D-PU70-1225-621 Sheet 1 Of1 Q-001-A A No Comment No Comment 15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
ATNo
This punch is registerdto confirm no punch
found after LineCheck.
2 Closed A120 A120-RL-76920 0A Sheet 1 of1 Q-002-A A No Comment No Comment 15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
ATNo
This punch is registerdto confirm no punch
found after LineCheck.
3 Closed A120 A120-RL-76920A F1A Sheet1 of 1 Q-003-A A No Comment No Comment 15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
ATNo
This punch is registerdto confirm no punch
found after LineCheck.
4 Closed A120 A120-RL-76920B F1A Sheet1 of 1 Q-004-A A No Comment No Comment 15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
AT15-Dec-2021
PASUCHAREAKSONGKI
ATNo
This punch is registerdto confirm no punch
found after LineCheck.
Copyright MODS 2022
Page 21 of 34
Page 22 of 34
Page 23 of 34
Page 24 of 34
Page 25 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Punch layer OWNER Punch Layer
ID Status PCWBS Drawing Punch No. Category Type Description Created Date Created ByWork
CompletedDate
WorkCompleted
By
WorkConfirmed
Date
WorkConfirmed
ByRejected Reason Images
Included Remarks
1 Closed A120 D-PU70-1225-621 Sheet 1 Of1 O-001-A A No Comment No Comment 18-Dec-2021 Gomes
Limlamai 18-Dec-2021 GomesLimlamai 18-Dec-2021 Gomes
Limlamai NoThis punch is registerd
to confirm no punchfound after Line
Check.
2 Closed A120 A120-RL-76920 0A Sheet 1 of1 O-002-A A No Comment No Comment 18-Dec-2021 Gomes
Limlamai 18-Dec-2021 GomesLimlamai 18-Dec-2021 Gomes
Limlamai NoThis punch is registerd
to confirm no punchfound after Line
Check.
3 Closed A120 A120-RL-76920A F1A Sheet1 of 1 O-003-A A No Comment No Comment 18-Dec-2021 Gomes
Limlamai 18-Dec-2021 GomesLimlamai 18-Dec-2021 Gomes
Limlamai NoThis punch is registerd
to confirm no punchfound after Line
Check.
4 Closed A120 A120-RL-76920B F1A Sheet1 of 1 O-004-A A No Comment No Comment 18-Dec-2021 Gomes
Limlamai 18-Dec-2021 GomesLimlamai 18-Dec-2021 Gomes
Limlamai NoThis punch is registerd
to confirm no punchfound after Line
Check.Copyright MODS 2022
Page 26 of 34
Page 27 of 34
Page 28 of 34
Page 29 of 34
Page 30 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Pre-Test CertificationItem Description Name Date PIC
1 Check P&ID marked-up, whether it is the latest revision Avelino Arnado 17-Dec-2021 TPC2 Check Test limit with P&ID marked-up Avelino Arnado 17-Dec-2021 TPC3 Check isometric drawings, whether it is the latest revision Avelino Arnado 17-Dec-2021 TPC4 Check whether all related documents are attached Avelino Arnado 17-Dec-2021 TPC5 Verify whether all category A-punch items are cleared Avelino Arnado 17-Dec-2021 TPC
Date Name
Accepted By JGC TPC 17-Dec-2021 Avelino ArnadoRemarks
Copyright MODS 2022
Page 31 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Test Record CertificationRFI No ITR-6400-002-1657 ITR Number ITR-6400-002
Test Medium V Test Pressure (MPa) -Date of Test N/A OWNER Required N/A
Design pressure N/A PRV set pressure N/AAmbient Temperature N/A Pressure Gauge S/N N/A
Pressure Gauge Range N/A Chart Recorder S/N N/AChart Recorder Range N/A Test Method N/A
Test pressure N/A Test start time N/ATest finish time N/A
Item Description Name Date PIC
1 Check nominated valves and instruments are removed or isolated for testing and flushing N/A 20-Dec-2021 TSV2 Check test blinds and temporary spools installed are correctly rated N/A 20-Dec-2021 TSV3 Check the high point vents and low point drains, whether it is applicable N/A 20-Dec-2021 TSV4 Check all instruments on test manifold are correctly rated and have a valid calibration certificate N/A 20-Dec-2021 TSV
Date Name
Accepted By
Subcontractor QC 20-Dec-2021 Anuphong SaengphonJGC QC 20-Dec-2021 PASUCHAR EAKSONGKIAT
OWNER QC 20-Dec-2021 Hidetoshi AndoRemarks
Copyright MODS 2022
Page 32 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Drain Record CertificationItem Description Name Date PIC
1 Check draining/air blowing location is barricaded with warning sign board and watchman N/A 20-Dec-2021 TSV2 Check the high point vents is open N/A 20-Dec-2021 TSV3 Confirm all test medium has been completely drain out N/A 20-Dec-2021 TSV
Date Name
Accepted By Test Supervisor 20-Dec-2021 yodRemarks
Copyright MODS 2022
Page 33 of 34
PROJECT TITLE Project Harmony SUBCON TEST PACKAGE NO REV
PROJECT CODE 0-8008-2
A120-JN-PR76-NMDA-01-157 0LOCATION Thailand
07-Jan-2022
Post Test CertificationITR Number ITR-6400-004
Item Description Name Date PIC
1 Verify whether all category B-punch items are cleared TPC2 Verify item to be remained for PCOM activity and transferred to system punch TPC3 Verify Welded Joint Summary for Seal Weld TPC4 Verify Flange Joint Summary for Test Blind TPC
Date Name
Accepted By
Subcontractor QCJGC QC
OWNER QCCopyright MODS 2022
Page 34 of 34