Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 1
FORM 1
i. Basic Information
Sl. Item Details
1 Name of the project/s Construction of Proposed Group Housing
Project “Gaur Siddhartham” at Plot No.
8/BS-01, Siddharth Vihar Yojna,
Ghaziabad (U.P.)
(Enclosed Site Plan at Annexure-1)
2 S.No. In the schedule Category: B, Activity: 8 (b) Building and
Large Constructions
Total Built-up area is 3,63,123.25 Sq.mt
(Change in built-up area from 3,25,000.0
Sq.mt to 3,63,123.25 Sq.mt due to change in
design )
3 Proposed capacity/area/length/tonnage to be
handled/command area/lease area/number of
wells to be drilled
Total Project area 48,750.00 Sqm or
12.0463 Acres (No Change)
(Enclosed Site Plan at Annexure-1)
4 New/Expansion/Modernization New Project
5 Existing Capacity/Area etc. N A, it is a New Project.
6 Category of Project i.e. „A‟ or „B‟ Category A , Item 8b
7 Does it attract the general condition? If yes,
please specify. No
8 Does it attract the specific condition? If yes,
please specify. No.
9 Location Plot No. 8/BS-01, Siddharth Vihar Yojna,
Ghaziabad (U.P.) (Enclosed Location Plan
on Survey of India Map at Annexture-2,
Google Map at Annexture-3 and the Lease
Plan at Annexture-4,)
Plot/Survey/Khasra No The project site has been allotted by the
U.P. Awas Evam Vikas Parishad,
Lucknow; Uttar Pradesh.
Village NA
Tehsil Ghaziabad
District Ghaziabad
State Uttar Pradesh
10 Nearest railway station/airport along with
distance in km. Ghaziabad Railway Station – 2 Km
Sahibabad Railway Station - 7 km
Airport- Delhi IGI- 32 km
11 Nearest town, city, district headquarters
along with distance in kms. The proposed site is well connected with
Road, Rail and Air networks. It is part of
Ghaziabad City. Ghaziabad Railway Station
-2 km, NH-24 -2 Km, Vaishali Metro
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 2
Sl. Item Details
Station- 7 Km, Gaur City-5 Km and Delhi
Border (UP Gate)- 8km, Hindon river-1 Km
and IGI Airport Delhi - 32 km. from the
project site
12 Village Panchayats, Zilla Parishad,
Municipal corporation, Local body (complete
postal addresses with telephone nos. to be
given)
Nagar Nigam Ghaziabad (2713580
/4113668) & Ghaziabad Development
Authority (GDA), (0120-2790891), Near
Old Bus Stand, Ghaziabad, U.P. 201001
13 Name of the applicant Gaursons India Private Limited
14 Registered address Gaur Biz Park, Plot No.-01, Abhay Khand-
II, Indirapuram , Ghaziabad, U.P.
15 Address for correspondence Gaur Biz Park, Plot No.-01, Abhay Khand-
II, Indirapuram , Ghaziabad, U.P
Name Gaursons India Private Limited
Designation (Owner/Partner/CEO) Company
Address Gaur Biz Park, Plot No.-01, Abhay Khand-
II, Indirapuram , Ghaziabad, U.P
Pin Code 201010
E-mail www.gaursonsindia.com
d.bhandari@gaursonsindia.com
Telephone No. 0120-4343333
Fax No. 0120-4167317
16 Details of Alternative sites examined, if any.
Location of these sites should be shown on a
topo sheet.
No site alternatives are under consideration.
17 Interlinked projects Nil
18 Whether separate application of interlinked
project has been submitted? N.A.
19 If yes, date of submission N.A.
20 If no, reason N.A.
21 Whether the proposal involves
approval/clearance under: If yes, details of
the same and their status to be given.
(a) The forest (conservation) Act, 1980? No
(b) The wildlife (protection) Act, 1972? No
(c) The C.R.Z. Notification, 1991? No
22 Whether there is any Government
order/Policy relevant/relating to the site? The project lies in the Residential Land Use
Zone of the Master Plan of Ghaziabad-2021.
( Pl. ref. the Map enclosed at Annexture-5)
23 Forest land involved (hectares) No
24 Whether there is any litigation pending No
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 3
Sl. Item Details
against the project and/or land in which the
project is propose to be set up?
(a) Name of the court
(b) Case No.
(c) Orders/directions of the court, if any and
its relevance with the proposed project.
No
25 Expected cost of the Project INR 819.00 Crores
ii. Activity
1. Construction, operation or decommissioning of the Project involving actions,
which will cause physical changes in the locality (topography, land use, changes
in water bodies, etc.)
S.No Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
1.1 Permanent or temporary
change in land use, land cover
or topography including
increase in intensity of land
use (with respect to local land
use plan)
No The proposed Land use of the Group Housing
Project „Gaur Siddhartham‟ is demarcated as
„Residential Land Use‟ in the Master Plan of
Ghaziabad-2021 by the local Development
Authority „GDA‟ ( Pl. ref. the Map enclosed at
Annexture-5)
Hence proposed project do not anticipate any
change in the land use, land cover or topography
of the area.
1.2 Clearance of existing land,
vegetation and buildings.
No This is Construction of Group Housing Project
on the plot of land earmarked for „Residential
Land use‟ as per the Master Plan of Ghaziabad-
2021.
1.3 Creation of new land uses? No The project site is already earmarked for
Residential Development as per the Master Plan
of Ghaziabad -2021 and will be developed as per
the local Building By-Laws. Hence no new land
use will be created.
1.4 Pre-construction investigations
e.g.
Bore holes, soil testing?
Yes Soil Investigation will be carried out and details
will be submitted.
1.5 Construction works? Yes This is a proposed Group Housing building
construction project. All construction activities
will be confined within project area. The
proposed group housing project‟s detailed Site
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 4
S.No Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
Plan is enclosed at Annexure-1. It has total 13
Building Blocks with Building Configuration of
3 Basements+ Stilt + G.Floor + 32nd
Floors.(13th
floor not counted) .
Erection of structures like underground water
storage, piping, electric substations, etc. and
temporary site offices, maintenance workshop
facilities & other infrastructure to support all
these activities would also be involved in the
project execution. There will be no physical
changes outside the project boundary.
Construction of the Group Housing Project
would be done as per applicable norms / Building
Bye-Laws :
Total
Plot area
48,750 m2 (No Change)
Facilities Group Housing/Residential
EWS/LIG
Community Centre
Educational Facilities
Commercial
Pray Area
Permissib
le Ground
Coverage
@40%
19,500.00 m2
Permissib
le FAR
@4.0
1,96,633.91 m2
Basement
Area
(3nos.)
Three Numbers- As per
Building Bye Laws
Total
Built up
area
(Sqmt)
Main group housing:
FAR- 1,96,574.03
5% Prescribed FAR- 8,786.37
Total Non-FAR- 95,045.50
Balcony Area- 38,677.91
EWS/LIG:
FAR- 18,324.14
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 5
S.No Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
5% Prescribed FAR- 437.40
Total Non-FAR- 2456.30
Balcony Area- 2,821.61
Total- 3,63,123.25
(Total buildup area increase
from 3,25,000 Sq mt to
363123.25 Sq Mt )
Detailed area chart with
proposed amendment is
enclosed as page 20 - 21
Area for
Green &
Open
The project site is a Part of
Planned Lay Out Plan of
„Siddharth Vihar Yojana‟ at
Ghaziabad, of Awas & Vikas
Parishad, accordingly, more
than 10% of the plot area would
be provided exclusively as
Green / Open Landscaping
Area.
Permissib
le No. of
Dwelling
Units
1. For Main Group Housing
- 2476 (increased due to
change in design)
2. For EWS/LIG – 450
Total – 2926
Detailed area chart with
proposed amendment is
enclosed as Page No 21 – 21
Required
EWS
Dwelling
Units
10% of proposed units
Required
LIG
Dwelling
Units
10% of proposed units
Proposed
Dwelling
Units
Less than the above permissible
Dwelling Units (details are
given in the enclosed site plan)
No. of
Building
3 Basements+ Stilt + G.Floor
+32nd
Floors.(13th
floor not
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 6
S.No Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
Blocks counted)
Max. Height
of building
98.20 M
1.6 Demolition works: No Presently the site is not having any type of
development. Enclosed existing site photographs
at Annexure-6.
1.7 Temporary sites used for
construction works
Or housing of construction
workers?
No All The construction activities including storing
of raw materials will be confined with in the
project site only. No temporary construction
worker‟s camp is proposed. Construction workers
from nearby areas would be engaged.
1.8 Above ground buildings,
structures or earthworks
including linear structures, cut
and fill or excavations
Yes The proposed group housing has buildings of
public utility only. Erection of structures like
underground water storage, piping, electric
substations, etc. and temporary site offices,
maintenance workshop facilities & other
infrastructure would also be there to support all
the proposed activities.
1.9 Underground tunneling? works
including mining or
No No such underground works are required
1.10 Reclamation works? No No reclamation work required.
1.11 Dredging? No No site dredging.
1.12 Offshore structures? No No off shore structures required.
1.13 Production and manufacturing
processes?
No No production/manufacturing process is
involved.
1.14 Facilities for storage of goods
or materials?
Yes Separate raw material storage yard will be made. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.
1.15 Facilities for treatment of
disposal of solid waste or
liquid effluents?
Solid Wastes:
Total about 7.6 Tons/day (Main Group Housing
– 6.5 Tones /day and EWS/LIG - 1.1 ton/day)
quantity of Solid Waste estimated to be
generated during the full operation of the project
which would be domestic in nature. Floor wise
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 7
S.No Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
door-to-door segregated solid waste collection
system has been envisaged in separate colored
bins. It would be then collected at a common
point at dedicated habitable ventilated Basement
area. Then after the secondary level segregation;
In-organic/ Non-Bio-degradable wastes would
be stored/ sold to authorize respective vendors
for recycling/ reuse and the Organic/ Bio-
degradable wastes would be treated in the
„Organic Waste Convertor‟ Machines to convert
the same to „Compost‟ which would be used for
site Landscape purposes or sold-out, as per the
requirements. Only hazardous waste would be
handed over to the competent agency as being
designated by the local authority, for its further
disposal.
Liquid Effluent:
During construction stage, if any sewage
generated at the site, the same would be treated
and disposed through septic tank/ soak pits /
portable STP.
During the operational phase of the project, the
waste water generated would be treated in the
STP proposed at the site. Recycled water would
be used for Flushing, Horticulture and allied
uses as required, using tertiary treatment.
1.16 Facilities for long term
housing of operational
Workers?
Yes Not applicable
1.17 New road, rail or sea traffic
during construction or
operation?
No Not required
1.18 New road, rail, air waterborne
or other transport
infrastructure including new or
altered routes and stations,
ports, airports etc?
No Not required
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 8
S.No Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
1.19 Closure or diversion of
existing transport routes or
infrastructure leading to
changes in traffic movements?
No Not required
1.20 New or diverted transmission
lines or pipelines?
No There will be no shifting of transmission line.
1.21 Impoundment, damming,
culverting, realignment or
other changes to the hydrology
of watercourses or aquifers?
No No impounding, damming, culverting,
realignment or other changes to the hydrology of
surface watercourses is proposed.
1.22 Stream crossings? No Not required.
1.23 Abstraction or transfers of
water from ground or surface
waters?
No Only STP water treated in WTP would be used
for all constructional activities for the project.
1.24 Changes in water bodies or the
land surface affecting drainage
or run-off?
No There is no change in water bodies or the land
surface; therefore project will not affect the
surface drainage and run-off of the area.
1.25 Transport of personnel or
materials for construction,
operation or
decommissioning?
Yes Pre-dominantly significant part of Construction
workers and material would be used from the
nearest available market. During the operation
phase, parking provision as per norms shall be
provided.
1.26 Long-term dismantling or
decommissioning or
restoration works?
No Not applicable
1.27 Ongoing activity during
decommissioning which could
have an impact on the
environment?
No Not applicable
1.28 Influx of people to an area in
either temporarily or
permanently?
Yes During the construction phase, majority of
laborers will be locally & temporarily hired,
hence, there will not be major influx of people
into the proposed project site area.
Whereas, during the operational phase,
Permanent residential population influx would
take place, for which Residential Complex with
all basic amenities and supporting infrastructure
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 9
S.No Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
is proposed.
1.29 Introduction of alien species? No All local/indigenous and fast growing species
would be planted.
1.30 Loss of native species or
genetic diversity?
No No loss of native species or genetic diversity is
envisaged.
1.31 Any other actions? No No
2. Use of Natural resources for construction or operation of the Project (such as land,
water, materials or energy, especially any resources which are non-renewable or in
short supply):
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
2.1 Land especially undeveloped
or agricultural land (ha)
This is proposed Construction of new Group Housing
Development Project on vacant plot of land earmarked
for „Residential Landuse‟ in the Master Plan of
Ghaziabad-2021.
2.2 Water (expected source &
competing users) unit:
Total Water demand estimated during full operation
stage of the project would be 1422 KLD. Out of which
fresh water demand for Main Group Housing is 909
KLD and 146.25 KLD for EWS which would be met
from the Municipal Supply and the recycled water for
Main Group Housing is 314.7 KLD and for EWS is
47.25 KLD used for flushing and 4.9 KLD would be
used for horticulture purposes.
Water Consumption KLD
Fresh Water for EC 909 KLD
Fresh water for EWS/LIG 146.25 KLD
Flushing Water for EC 314.7 KLD
Flushing water for
EWS/LIG
47.25 KLD
Horticulture/Landscape 4.9 KLD
Total 1422.0 KLD
Water Source: Municipal Supply
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 10
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
2.3 Minerals (MT) No Not required.
2.4 Construction material – stone
aggregates,, and / soil
(expected source – MT)
Yes Different types of construction material will be
required according to the design and size. These will
be purchased from various vendors. Hence no
permission is required separately.
S.No. Item Quantity
1 Steel 14,000 MT
2 RMC 1,25,000 MT
Steel and RMC would be sourced from authorized
vendors.
2.5 Forests and timber (source-
MT)
No Not required.
2.6 Energy including electricity
and fuels (source, competing
users) Unit: fuel (MT), energy
(MW)
Total Power requirement will be 8102 KVA (Main
Group Housing - 7339 KVA & EWS /LIG – 763.51
KVA) which would be tapped from the respective
power supply agency.
2.7 Any other natural resources
(use appropriate standard
units)
No Not required.
3. Use, storage, transport, handling or production of substances or materials,
which could be harmful to human health or the environment or raise concerns
about actual or perceived risks to human health.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
3.1 Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora,
fauna, and water supplies)
No The Project is a Group housing development
project hence, no storage of hazardous chemicals
(as per MSIHC rules) will be done, except LSD
(low sulphur diesel) required to run standby DG
sets. Also, the quantity stored will be below the
threshold limit specified in the MSIHC rules.
Suitable management practice will be adopted for
the same.
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 11
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
3.2 Changes in occurrence of
disease or affect disease
vectors (e.g. insect or water
borne diseases)
No Suitable drainage and waste management
measures will be adopted in both construction and
operational phase, which will restrict stagnation
of water or accumulation of waste. This will
effectively restrict the reproduction and growth of
disease vectors.
3.3 Affect the welfare of people e.g.
by changing living conditions?
Local workers will be employed during
construction of the project and the project has
beneficial impacts.
3.4 Vulnerable groups of people who
could be affected by the project
e.g. hospital patients, children, the
elderly etc.,
No This is development of Group Housing Project, so
no adverse impact will be anticipated by this
project.
3.5 Any other causes No
4. Production of solid wastes during construction or operation or
decommissioning (MT/month)
No. Information/Checklist
confirmation
Yes/No Details there of (with approximate
quantities/rates, wherever possible) with source
of information data
4.1 Spoil, overburden or mine
wastes
No Soil generated during excavation will be backfilled
wherever required within the project site.
4.2 Municipal Waste (domestic
and or commercial wastes)
Yes It is estimated that approximately Total about 7.6
Tons/day (Main Group Housing – 6.5 Tones /day
and EWS/LIG -1.1 ton/day) solid waste would be
generated during operational phase. The solid
wastes generated during operation phase will
consist of organic waste such as waste vegetables,
foods etc and inorganic waste like papers, cartons,
thermocol, glass plastics, polythene bags, etc. These
solid wastes will be segregated into biodegradable
and non-biodegradable wastes and collected in
separate colored bins. The recyclable wastes will be
sold to recyclers and the biodegradable & inert
wastes will be handed over to the competent
authority for the further disposal.
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 12
No. Information/Checklist
confirmation
Yes/No Details there of (with approximate
quantities/rates, wherever possible) with source
of information data
4.3 Hazardous wastes
(as per Hazardous Waste
Management Rules)
Yes The only hazardous waste in the project would be
used/spent oil from standby DG sets, which is
classified as hazardous waste category 5.1 as per
Hazardous Wastes (Management & Handling)
Amendments Rules, 2003. The spent oil will be
carefully stored in HDPE drums under isolated
storages, and periodically sold to authorize
recyclers. All precautions will be taken to avoid
spillage from the storage.
4.4 Other industrial process
wastes
No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other
sludge from effluent
treatment
Yes Will be used as manure for horticulture.
4.7 Construction or demolition
wastes
Yes It is estimated that approximately 3, 00,000 m3
of earth material will be excavated during initial
construction phase for foundations, basement.
Excavated material will be re-used for construction
and landscaping works within the site only.
The soil excavated during construction would be
first temporarily stored in an area earmarked and
then shall be used for landscaping and road
construction and surplus soil (if any) will be
transported to the designated disposal site in tune
with the local norms.
4.8 Redundant machinery or
equipment
No There will be no generation of redundant machinery
or equipment for disposal.
4.9 Contaminated soils or other
materials
No Not applicable
4.10 Agricultural wastes Yes 18 kg/day Horticulture waste will be generated,
which includes cutting, trimmings, dry leaves &
grasses etc. Garden waste including Biodegradable
waste will be transported to the compost site for
bio-composting.
4.11 Other solid wastes No Not applicable
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 13
5. Release of pollutants or any hazardous, toxic or noxious substances to air
(Kg/hr)
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate quantities/rates,
wherever possible) with source of information data
5.1 Emissions from
combustion of fossil
fuels from stationary or
mobile sources
Yes During construction, emission will be generated from
vehicles, construction machineries and D.G. sets.
During operational phase, D.G. Set‟s emissions and
vehicular emissions will be there which would be
complying the UPPCB Norms.
5.2 Emissions from
production processes
No Not applicable
5.3 Emissions from
materials handling
including storage or
transport
Yes Water sprinkling shall be carried out regularly at
construction and camp sites. Vehicles delivering
construction materials will always be covered to avoid
spillage of construction materials.
5.4 Emissions from
construction activities
including plant and
equipment
Yes The emissions will be marginal and restricted to
construction phases, will be short lived and reversible.
All construction machinery will meet the prescribed
emission standards.
5.5 Dust or odours from
handling of materials,
including construction
materials sewage and
waste
Yes Dust pollution during the construction phase would be
controlled by providing proper closed site barricading,
use of nets, sprinkling regular water, provided with
tarpaulin cover over transported/stored raw material,
use of masks etc. to reduce dust emission.
5.6 Emissions from
incineration of waste
No
5.7 Emissions from burning
of waste in open air (e.g.
slabh materials,
construction debris)
No
5.8 Emissions from any
other sources
No
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
6.1 From operation of equipment
ventilation plant, crushers e.g.
engines,
Yes The machinery which will be used for
construction be of highest standard of reputed
make and will adhere to international standard.
Insignificant impacts due to construction
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 14
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
machinery are envisaged. Besides, the
construction activities will be restricted do
daytime only. Source of noise in operational
phase will be DG sets which will be in operation
during power failure only.
6.2 From industrial or similar
processes
No
6.3 From construction or
demolition
Yes During construction work, noise will be
generated from construction machinery; however,
adequate precautionary measures would be taken
to reduce noise generation.
6.4 From blasting or piling No No blasting or piling will be done.
6.5 From construction or
operational traffic
Yes It shall be restricted within a limited area. Some
amount of noise will be generated in the
construction and operational phase however,
adequate precautions will be taken to reduce
noise generation i.e. development of green area
which will act as barrier to control noise/air
pollution.
6.6 From lighting or cooling
systems
No During power failure, operation of DG sets will
generate noise. However, these shall be housed in
acoustically enclosed chambers as per the norms.
6.7 From any other sources No
7. Risks of contamination of land or water from releases of pollutants into the
ground or into sewers, surface waters, groundwater, coastal waters or the
sea:
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
7.1 From handling, storage,
hazardous materials use or
Spillage of hazardous materials
Yes The only hazardous waste is, spent oil from
standby DG sets. The spent oil will be
carefully stored in HDPE drums under isolated
storage, and periodically sold to authorize
recyclers. All precautions will be taken to
avoid spillage from storage.
7.2 From discharge of sewage or
other effluents water or the land
No There will be no discharge of untreated
sewage on water or land, as the sewage will
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 15
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
(expected mode and place of
discharge) to
be discharged in municipal sewer. So, no
adverse effect is envisaged.
7.3 By deposition of pollutants
emitted to air into the land or
into water
No Deposition of dust on land & plants from air
due to transportation will be there, both during
operational & construction phase but will be
minimal. Water sprinkling and good house
keeping shall be regularly carried out
7.4 From any other sources No
7.5 Is there a risk of long term build
up of pollutants in the
environment from these
sources?
No There is no risk of long term build up of
pollutants in the environment from handling,
storage, use or spillage of hazardous materials,
discharge of sewage or other effluents to water
or the land and by deposition of pollutants
emitted to air into the land or into water
sources.
8. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment.
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
8.1 From explosions, spillages,
fires etc from storage, handling,
use or production of hazardous
substances
This is basically a construction project and does
not involve major hazardous construction
activity. Hence, chances of explosions, spillages,
fires are minimal.
All construction workers will be provided with
suitable personal protective equipment (PPE) as
per the health & safety norms. Training and
awareness about the safety norms will be
provided to all supervisors and workers involved
in construction activities.
An agreement will be signed with the contractor,
which will clearly deal safety aspects during
construction. No major hazardous waste is being
stored with in the project site. No industrial or
process activity is involved in this project hence
chances of chemical hazards and accidents are
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 16
No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
minimal. However, suitable fire-fighting
measures will be provided.
8.2 From any other causes No For accidental fires, Fire fighting
Pumps are to be installed
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g.
floods, earthquakes, landslides,
cloudburst etc)?
No The project falls under seismic Zone IV. Design
and architecture of building will be earthquake
resistant and will comply with the required IS
Specifications
Proper measures shall be taken in detailed design
to minimize the impact of any disaster. Area is
not flood prone. Building to be designed as per
seismic zone requirements.
9. Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative
impacts with other existing or planned activities in the locality
No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
9.1 Lead to development of
supporting facilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.:
This is a development of Group Housing project.
The existing infrastructure is adequate to meet
the requirement of proposed project.
In order to support, power lines will be drawn,
roads will be constructed within the proposed
project as well as for access. Water supply and
sewage systems will be laid down extensively.
• Supporting infrastructure
(roads, power supply, waste or
waste water treatment, etc.)
Yes Residential project
• housing development Yes
• extractive industries No
• supply industries No
• other No
9.2 Lead to after-use of the site,
which could have an impact on
the environment
No
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 17
No. Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
9.3 Set a precedent for later
developments
No The area falls under the Master Plan of
Ghaziabad-2021 of the local development
authority „GDA‟, therefore, no illegal activity is
predicted and development of the entire region is
anticipated as proposed in the Master Plan.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar
effects
It will improve the environment by creating a
more attractive and inter active environment for
living, leisure & recreation, create an urban
landmark.
iii. Environmental Sensitivity
S.N Areas Name/
Identity
Aerial distance (within 15 km.) proposed
project location boundary
1. Areas protected under
international conventions,
national or local legislation for
their ecological, landscape,
cultural or other related value
No Nil
2. Areas which are important or
sensitive for ecological reasons
- Wetlands, watercourses or
other water bodies, coastal
zone, biospheres, mountains,
forests
Yes Hindan River – 1.0 km (approx.) Pl ref Plan
enclosed at Annexure-7 (A) & 7(B)
3. Areas used by protected,
important or sensitive species of
flora or fauna for breeding,
nesting, foraging, resting, over
wintering, migration.
No Nil
4. Inland, coastal, marine or
underground waters
No Nil
5. State, National boundaries No Project lies in U.P. State.
6. Routes or facilities used by the
public for access to recreation
or other tourist, pilgrim areas
No NH- 24 – approx 1.75 Km
7. Defense installations Yes Hindan Air base- approx. 6 Km
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 18
S.N Areas Name/
Identity
Aerial distance (within 15 km.) proposed
project location boundary
8. Densely populated or built-up
area
Ghaziabad Railway Station-2 km, Noida- 3 km)
Delhi Border (UP Gate) -8 km
9. Areas occupied by sensitive
man-made land uses (hospitals,
schools, places of worship,
community facilities)
Yes All such places are available in close proximity.
10. Areas containing important,
high quality or scarce resources
(ground water resources,
surface resources, forestry,
agriculture, fisheries, tourism,
minerals)
No Hindan River – 1 Km
Pl ref Plan enclosed at Annexure-7 (A) & 7 (B)
11. Areas already subjected to
pollution or environmental
damage. (Those where existing
legal environmental standards
are exceeded).
Nil
12 Areas susceptible to natural
hazard which could cause the
project to present environmental
problems (earthquakes,
subsidence, landslides, erosion,
flooding or extreme or adverse
climatic conditions)
No The area is not susceptible to natural hazard,
such as, subsidence, landslides, erosion,
flooding, or extreme or adverse climatic
conditions.
However, the proposed site is located in seismic
Zone IV for which BIS standards shall be
followed during design of the building.
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 19
“I hereby given undertaking that the data and information given in the application
and enclosures are true to the best of my knowledge and belief and I am aware that if
any part of the data and information submitted is found to be false or misleading at
any stage, the project will be rejected and clearance give, if any to the project will be
revoked at our risk and cost.
Date: 28.04.2017
Place: Ghaziabad Mr Devendra Bhandari
Signature of the applicant
With Name and Full Address
(Project Proponent/ Authorized Signatory)
NOTE:
1. The Projects involving clearance under Coastal Regulation Zone Notification,
1991 shall submit with the application a C.R.Z map duly demarcated by one of
the authorized agencies, showing the project activities, w.r.t. C.R.Z. and the
recommendations of the state Coastal Zone management Authority.
Simultaneous action shall also be taken to obtain the requisite clearance under
the provisions of the C.R.Z. Notification, 1991 for the activities to be located in
the CRZ.
2. The projects to be located within 10 km of the National Parks, Sanctuaries,
Biosphere Reserves, Migratory Corridors of Wild Animals, the project
proponent shall submit the map duly authenticated by Chief Wildlife Warden
showing these features vis-à-vis the project location and the recommendations
or comments of the Chief Wildlife Warden thereon.”
3. All correspondence with the Ministry of Environment & Forests including
submission of application for TOR/Environmental Clearance, subsequent
clarifications, as may be required from time to time, participation in the EAC
Meeting on behalf of the project proponent shall be made by the authorized
signatory only. The authorized signatory should also submit a document in
support of his claim of being an authorized signatory for the specific project”.
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01, Siddharth Vihar Yojna, Ghaziabad, UP
--------------------------------------------------------------------------------------------------------------------
Page 20
Proposed Group Housing Project “Gaur Siddhartham” at Plot No. 8 / BS-01,
Siddharth Vihar Yojna, Ghaziabad, UP
---------------------------------------------------------------------------------------------------------
-----------
Page 21