METRES (1:500)
10 20 30 40 50
7 ESS
NO
RTH
RO
AD
9
LODGE CLOSE
Barrow School(primary)
Food Processing Plant
Path (um)
6
Loom Loft Furniture & Interiors
CO-OP
McDonald's
186m
² /20
00sq
ft
836m² /9000sqft
A59
Lorry Layby
PROW
PROW
PRO
W
PRO
W
PROW
PROW
186m
² /20
00sq
ft
186m
² /20
00sq
ft
186m
² /20
00sq
ft
715m² /7700sqft
696m
² /75
00sq
ft
186m² /2000sqft
12
205m² /2200sqft
205m² /2200sqft
205m
² /22
00sq
ft
205m
² /22
00sq
ft
715m² /7700sqft
743m
² /80
00sq
ft
743m
² /80
00sq
ft
743m
² /80
00sq
ft
PEDESTRIAN LINK
A59
Indicative Site Layout
CBStage 3 - Spatial Coordination
01-123-0005
18.03.2021 1:500@A1
Barrow Brook Business Park Barrow Brook Business Park,Clitheroe
CD.AC.BBBP.ISL.O1
Client: Project Name:
Drawn By:
A T
M
E W
The
Gra
nary
, Sut
ton
Lodg
e F
arm
,55
Che
ster
Roa
d, S
utto
n W
eave
r,R
unco
rn, W
A7
3EA
0160
6 65
4983
0788
4401
777
C.B
rear
ley@
Arc
hi-S
cape
.net
ww
w.A
rchi
-Sca
pe.n
et
Project Address:
Project Status:
Project Number:
Drawing Title:
Date:
Drawing Number:
Scale: Rev:
Barrow Brook Business ParkConsortium
LEGEND
Denotes existing trees to beretained where possible orreplaced.
Denotes proposed permeablesurfacing.
Denotes proposed tree plantingwith Bio-retention tree pit.
Denotes proposed attenuationbasin.
NOTESAccess detail in accordance withVectio Consulting design (dwg numVC0134 - 005).
Revisions:
Rev Description By Date
S3A Updated in accordance with additional reports and information received. CB 16.7.21