Normally 3 specimens each of about 7 kg must be compacted so that their
compacted densities range from 95% to 100% generally with 10, 30 and 65 blows.
Weigh of empty mould
Add water to the first specimen (compact it in five layer by giving 10 blows per
layer)
After compaction, remove the collar and level the surface.
Take sample for determination of moisture content.
Weight of mould + compacted specimen.
Place the mold in the soaking tank for four days (ignore this step in case of
unsoaked CBR.
7/27/2019 Prueba Cbr
2/105
Take other samples and apply different blows and repeat the whole process.
After four days, measure the swell reading and find %age swell.
Remove the mould from the tank and allow water to drain.
Then place the specimen under the penetration piston and place surcharge
load of 10lb.
Apply the load and note the penetration load values.
Draw the graphs between the penetration (in) and penetration load (in) and
find the value ofCBR.
Draw the graph between the %age CBR and Dry Density, and find CBR at
required degree of compaction.
7/27/2019 Prueba Cbr
3/105
1.- Determine the mass of the mould with base
plate attached
7/27/2019 Prueba Cbr
4/105
COLOCAR BASE CUADRADA, ESPACIADOR+MOLDE
7/27/2019 Prueba Cbr
5/105
7/27/2019 Prueba Cbr
6/105
7/27/2019 Prueba Cbr
7/105
7/27/2019 Prueba Cbr
8/105
Prepare soil sample. Mix the dry soil with water so that the mixture has a
water content that is 1% below the optimum moisture content.
Prepare around 6 kg of mixture. Collect required data on soil properties
and tabulate
7/27/2019 Prueba Cbr
9/105
7/27/2019 Prueba Cbr
10/105
7/27/2019 Prueba Cbr
11/105
7/27/2019 Prueba Cbr
12/105
7/27/2019 Prueba Cbr
13/105
7/27/2019 Prueba Cbr
14/105
7/27/2019 Prueba Cbr
15/105
7/27/2019 Prueba Cbr
16/105
7/27/2019 Prueba Cbr
17/105
7/27/2019 Prueba Cbr
18/105
Remove the detachable collar and.
7/27/2019 Prueba Cbr
19/105
trim the top of the mould
7/27/2019 Prueba Cbr
20/105
RETIRAR MOLDE
7/27/2019 Prueba Cbr
21/105
7/27/2019 Prueba Cbr
22/105
COLOCAR PAPEL FILTRO
7/27/2019 Prueba Cbr
23/105
GIRAR MOLDE CON ARENA HACIA EL FILTRO
7/27/2019 Prueba Cbr
24/105
GIRAR MOLDE CON ARENA HACIA EL FILTRO
7/27/2019 Prueba Cbr
25/105
COLOCAR COLLAR DE EXTENSIN
7/27/2019 Prueba Cbr
26/105
COLOCAR COLLAR DE EXTENSIN
7/27/2019 Prueba Cbr
27/105
COLOCAR COLLAR DE EXTENSIN
7/27/2019 Prueba Cbr
28/105
COLOCAR DISCO DE CARGA CIRCULAR (O) EN PLATOCON TALLO
7/27/2019 Prueba Cbr
29/105
AGREGAR DISCO DE CARGA (C) EN PLATO CON TALLO
7/27/2019 Prueba Cbr
30/105
INTRODUCIR PLATO + 2 DISCOS EN MOLDE
7/27/2019 Prueba Cbr
31/105
INTRODUCIR MOLDE CON DISCOS EN AGUA
7/27/2019 Prueba Cbr
32/105
COLOCAR TRIPIE EN MOLDE
7/27/2019 Prueba Cbr
33/105
COLOCAR MANERAL CON VSTAGO DE MICRMETRO
7/27/2019 Prueba Cbr
34/105
COLOCAR MANERAL CON BAYONETA DE MICRMETRO
7/27/2019 Prueba Cbr
35/105
7/27/2019 Prueba Cbr
36/105
7/27/2019 Prueba Cbr
37/105
RETIRAR MOLDE DEL AGUA Y RETIRAR PLATO + DISCOS DE CARGA
7/27/2019 Prueba Cbr
38/105
REGISTRAR MASA DEL MOLDE
7/27/2019 Prueba Cbr
39/105
COLOCAR DISCO DE CARGA (O) EN MOLDE
7/27/2019 Prueba Cbr
40/105
AGRGAR DISCO DE CARGA (C) EN MOLDE
7/27/2019 Prueba Cbr
41/105
COLOCAR DISCO ESPACIADOR EN BASE DE MOLDE Y COLOCAR ENPRENSA
7/27/2019 Prueba Cbr
42/105
APLICAR CARGA 1.25 mm/min.
7/27/2019 Prueba Cbr
43/105
CARGA APLICADA
7/27/2019 Prueba Cbr
44/105
7/27/2019 Prueba Cbr
45/105
RETIRAR SUELO DE MOLDE
7/27/2019 Prueba Cbr
46/105
COLOCAR SUELO EN CHAROLA
7/27/2019 Prueba Cbr
47/105
COLOCAR CHAROLA EN BSCULA & REGISTRAR MASA
7/27/2019 Prueba Cbr
48/105
INTRODUCIR AL HORNO
7/27/2019 Prueba Cbr
49/105
7/27/2019 Prueba Cbr
50/105
7/27/2019 Prueba Cbr
51/105
7/27/2019 Prueba Cbr
52/105
7/27/2019 Prueba Cbr
53/105
7/27/2019 Prueba Cbr
54/105
7/27/2019 Prueba Cbr
55/105
7/27/2019 Prueba Cbr
56/105
7/27/2019 Prueba Cbr
57/105
7/27/2019 Prueba Cbr
58/105
7/27/2019 Prueba Cbr
59/105
7/27/2019 Prueba Cbr
60/105
7/27/2019 Prueba Cbr
61/105
7/27/2019 Prueba Cbr
62/105
7/27/2019 Prueba Cbr
63/105
Typical CBR Ranges
7/27/2019 Prueba Cbr
64/105
General Soil
Type
USC Soil
TypeCBR Range
GW 40 - 80
GP 30 - 60
GM 20 - 60
GC 20 - 40
SW 20 - 40
SP 10-40
SM 10-40
SC 5-20
ML 15 or less
CL LL < 50% 15 or lessOL 5 or less
MH 10 or less
CH LL > 50% 15 or less
OH 5 or less
Coarse-
grained soils
Fine-grained
soils
Typical CBR Ranges
7/27/2019 Prueba Cbr
65/105
The harder the surface, the higher the CBR
rating. A CBR of 3 equates to tilled farmland,
a CBR of 4.75 equates to turf or moist clay,
while moist sand may have a CBR of 10. High
quality crushed rock has a CBR over 80. Thestandard material for this test is crushed
California limestone which has a value of
100.
7/27/2019 Prueba Cbr
66/105
7/27/2019 Prueba Cbr
67/105
7/27/2019 Prueba Cbr
68/105
7/27/2019 Prueba Cbr
69/105
7/27/2019 Prueba Cbr
70/105
7/27/2019 Prueba Cbr
71/105
7/27/2019 Prueba Cbr
72/105
7/27/2019 Prueba Cbr
73/105
7/27/2019 Prueba Cbr
74/105
7/27/2019 Prueba Cbr
75/105
7/27/2019 Prueba Cbr
76/105
7/27/2019 Prueba Cbr
77/105
7/27/2019 Prueba Cbr
78/105
7/27/2019 Prueba Cbr
79/105
7/27/2019 Prueba Cbr
80/105
7/27/2019 Prueba Cbr
81/105
7/27/2019 Prueba Cbr
82/105
7/27/2019 Prueba Cbr
83/105
7/27/2019 Prueba Cbr
84/105
7/27/2019 Prueba Cbr
85/105
7/27/2019 Prueba Cbr
86/105
7/27/2019 Prueba Cbr
87/105
7/27/2019 Prueba Cbr
88/105
7/27/2019 Prueba Cbr
89/105
7/27/2019 Prueba Cbr
90/105
7/27/2019 Prueba Cbr
91/105
7/27/2019 Prueba Cbr
92/105
7/27/2019 Prueba Cbr
93/105
7/27/2019 Prueba Cbr
94/105
7/27/2019 Prueba Cbr
95/105
7/27/2019 Prueba Cbr
96/105
7/27/2019 Prueba Cbr
97/105
7/27/2019 Prueba Cbr
98/105
7/27/2019 Prueba Cbr
99/105
7/27/2019 Prueba Cbr
100/105
7/27/2019 Prueba Cbr
101/105
7/27/2019 Prueba Cbr
102/105
7/27/2019 Prueba Cbr
103/105
7/27/2019 Prueba Cbr
104/105
7/27/2019 Prueba Cbr
105/105