PSM 1/PSM 2 IDP/PRB
NOTICE OF IMPLEMENTATION
FROM 15 APRIL UNTIL 5 JUNE 2020
Table 1 : WEEKS IN REMAINING SEMESTER 2019/2020-2
As Movement Control Order (MCO) has been extended to 14 Apri l 2020, the
implementation of PSM 1 & PSM 2 shal l fol low the new UTeM’s academic
calendar as shown at Table 1.
Week PSM 1 PSM 2
W6
15 - 17/4No any lab/worksyop activity is allowed as preparation of the lab/worksyop for the new SOP (fully controlled)
W7
20 - 24/4No any lab/worksyop activity is allowed as preparation of the lab/worksyop for the new SOP (fully controlled)
W8
27 - 30/4 Continue with the literature review/methodology progress Continue with the data collection/experimental/product
development with scope revision
W9
4 - 8/5Continue Continue
W10
11 - 15/5Continue Continue
W11
18 - 22/5Poster Presentation
Log book submission
Continue
Log book submission
W12
25 - 29/5Aidil Fitri (24 & 25 May)
Report preparation
Aidil Fitri (24 & 25 May)
Report preparation
W13
1 - 5/6Report submission Oral Presentation
Report Submission
ACTION PLAN FOR PSM 1
On-line poster presentation could be taken place.
ACTION PLAN FOR PSM 2
1- Students need to update his/her progress to supervisor
before 20/4/2020 via e-communication.
2- Supervisor needs to refine the scope of work accordingly.
ACTION PLAN FOR PSM 2
REMARKS (as EAC latest guidelines -30/3/2020):
1- Bagi projek-projek yang terpaksa dilaksanakan secara kaedah
hardware kerana peratus kerja yang telah signif icant, maka projek-
projek ini boleh diteruskan tetapi pelajar mungkin terpaksa berstatus
Tidak Selesai kerana projek mungkin akan menjangkau tarikhtamat
semester. Pelajar akan diberikan masa semasa semester khas untuk
menyiapkan projek.
2.Projek yang masih diperingkat awal pelaksanaan amat digalakkan
untuk diubah ke bentuk simulasi komputer.
Table 2 : WEEKS IN REMAINING SEMESTER 2019/2020-2
As Movement Control Order (MCO) has been extended to 14 Apri l 2020, the
implementation of IDP & PRB shal l fol low the new UTeM’s academic calendar as
shown at Table 2.
Week IDP PRB
W6
15 - 17/4No any lab/worksyop activity is allowed as preparation of the lab/worksyop for the new SOP (fully controlled)
W7
20 - 24/4No any lab/worksyop activity is allowed as preparation of the lab/worksyop for the new SOP (fully controlled)
W8
27 - 30/4
Group discussion
Development works on prototype and product analysis.
Preparation of technical report.
Group discussion
Development works on prototype and product analysis.
Preparation of technical report.
W9
4 - 8/5
Group discussion
Prototype testing and product analysis.
Poster Preparation and Preparation of technical report.
Group discussion
Prototype testing and product analysis.
Poster Preparation and Preparation of technical report.
W10
11 - 15/5
Group discussion
Prototype testing, Poster Preparation and Preparation of
technical report.
Group discussion
Prototype testing, Poster Preparation and Preparation of
technical report.
W11
18 - 22/5
e-exhibition for Poster Presentation and Prototype. e-exhibition for Poster Presentation and Prototype.
W12
25 - 29/5
Aidil Fitri (24 & 25 May)
Report preparation
Aidil Fitri (24 & 25 May)
Report preparation
W13
1 - 5/6
Submission of Final Report and log book/group folder. Submission of Final Report and log book/group folder.
ACTION PLAN FOR IDP & PRB
1- Students need to update his/her progress to supervisor
before 20/4/2020 via e-communication.
2- On-line poster presentation and e-exhibition could be taken
place.
ACTION PLAN FOR IDP & PRB
REMARKS (as EAC latest guidelines – 30/3/2020):
1.IDP masih perlu mengambil kira elemen complex engineering problems dan rekabentuksistem, komponen ataupun proses melalui integrasi pengetahuan umum atas keperluanyang spesifik. Penilaian kerja berpasukan masih perlu dibuat termasuk complex engineering activities characteristics.
2.Skop projek dianggap selesai dengan penghasilan prototaip rekabentuk termasuksimulasi komputer dan pembentangan penyelesaian masalah rekabentuk kritikal (critical design problem solving). Untuk kali ini tidak perlu ada hard-prototype.
ACTION PLAN PRB
1. Detailed design of the product (example: CAD drawing etc.) are required.
2. The design workability such as mechanical movement etc can be displayed using
simulation software.
3. Physical prototype can be added using scale down prototype, including paper model,
plastic model, or 3d print model etc.
Standard Operating Procedure for using Lab/Worksyop at FKP
Standard Operating Procedure for using Lab/Worksyop at FKP
REMARKS
1- A new Standard Operating Procedure for using Lab/Worksyop is applied to;
a- students (UG and PG).
b- Research Assistant (RAs).
d- Lecturers.
e- Assistant Engineer (PJs).
2- All Laboratories and Worksyop can be booked thru on-line system at FKP web-site.
3- Please kindly book the lab/worksyop before you go for health screening.
…very much for attention, cooperation and support…