QP Dialogue 2018/02abci.gov.bn/ABCi Documents/FOR TAKLIMAT/QP Dialogue 2018... · 2018-05-23 ·...

Post on 06-Apr-2020

0 views 0 download

transcript

QPDialogue2018/027th March20189:00AMDewanInderaPahlawan,MODTC

2018/02

AGENDA

• GeneralHousekeeping&Reminders• Process&FormUpdates• InspectionChecklistRequirement• QPScaleofFees• Q+A

2018/02

GeneralHousekeeping

ALL attachments uploaded on OneBiz are official submissionsand will be electronically stamped upon approval.

• File Naming (i.e LOT XXXX – BORANG A)• Correct and required documentation (i.eArchitectural Drawings for Borang C submission notrequired)• All Bomba fees are to be paid during OP stage

Reminders

2018/02

GeneralHousekeeping

QPs are to submit the names of 2 representativesto ABCi as requested on 18 January 2018• Copy of IC• Passport size photographs

Reminders

2018/02

Process&FormUpdatesGeneral- Borang A/C /E

2018/02

PleasenotethatwhenfillingouttheQPparticularsweareaskingforthePracticingCertificateNo. notBAPEQSRegistrationNo.:

00XXXAr

2018BAPEQS/XXXX✔

Process&FormUpdatesBuildingApproval(Borang A)- Changes

QPsarerequiredtodeclarewhetheranOPforearthworkshasbeenapproved/obtained(ifapplicable)Additionally,QPswillberequiredtodeclarewhetherapprovalfromHousingDevelopmentDepartmenthasbeenobtainedforRPN/STKRJapplications(ifapplicable)

2018/02

Process&FormUpdatesBuildingApproval(Borang A)- Reminders

PleaseberemindedthatthesubmittingQPforBorang Aisdeclaringthefollowing:

2018/02

Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Changes

QPsarerequiredtodeclarewhetheranOPforearthworkshasbeenapproved/obtained(ifapplicable)

2018/02

Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Changes

QPswillneedtofilloutthesefieldsbydeclaringiftheyaretobesupervisingduringconstruction,orifanAccreditedCheckerhasbeenengaged(ifapplicable)

2018/02

Process&FormUpdatesPermittoCarryoutBuildingWorks(Borang C)- Reminders

2018/02

PleaseberemindedthatthesubmittingQPforBorang Cisdeclaringthefollowing:

InspectionChecklist

InadditiontosubmittingtheBuilder’sCertificateofCompletion(viaemail)whenbookinganinspection,anInspectionChecklistsignedbytheContractorandverifiedbytheQPistobesubmitted.

TheinspectionchecklistwillbeemailedtoallQPsandalsoavailabletodownloadfromtheMODwebsite.

General

2018/02

InspectionEtiquette

• Checklistmustbecompletelyfilledoutandincompliance.• QPrepresentativeandContractorrepresentativemustbepresentforALL inspections

General

2018/02

2018/02

2018/02

QPSCALEOFFEES

2018/02

Q+A

THANKYOU

2018/02