Post on 23-Dec-2015
transcript
QPASS
CONSTRUCTION MATERIAL DIVISION, CIDB
QUALITY PRODUCT ACCORDANCE TO
SPECIFIED STANDARD(LOCAL PRODUCT)
WHAT THE LAW SAYS??THE NEEDS OF CCPM SYSTEM
QPASS
ENFORCEMENT CONCPET
OBJECTIVES & VALUES OF QUALITY COMPLIANCE
ENFORCEMENT MECHANISM
METHOD OF ENFORCEMENT
ADVANTAGES OF HAVING PPS
FLOW PROCESS OF PPS APPLICATION
PRODUCT/MATERIAL VERIFICATION PROCESS
MATERIAL’S QUALITY COMPLIANCE : OBJECTIVES & VALUES
To ensure compliance to Malaysian Standard (MS) before entering or used in domestic market, to avoid below par quality product being dumped into the market.
To upheld quality for safer buildings or end products.
To ensure safety of the public (users) and workforce.
To ensure environment is safeguarded
To promote & support Green Construction
To ensure the implementation of standard marking on materials for quality awareness among public users.
To improve the image of the industry and the nation.
WHAT THE LAW SAYS ?CIDB’s Act 520 (Amendment 2011)
• Section 33C(1) : ‘The Lembaga shall, in the manner determined by the Lembaga, certify the construction materials used in the construction industry and specified in the Fourth Schedule in accordance with the standard specified in the Schedule.’
• Section 33D(1) : ‘A person shall not deal or undertake to deal, whether directly or indirectly, with the construction materials specified in the Fourth Schedule unless the construction materials have been certified by CIDB.’
WHAT THE LAW SAYS ?CIDB’s Act 520 (Amendment 2011)
• Section 33D(2) : Any person who deal or undertake to deal with the construction materials specified in the Fourth Schedule without the certification of the Lembaga shall be guilty of an offence and shall, on conviction, be liable to a fine of not less than RM10,000 but not more than RM500,000.’
• Section 35C(2)(a) : Search and seize any construction materials, equipment, instrument, book, record, document, computerized document, article or other thing that is reasonably believed to furnish evidence of the commission of such offence
BIL TERM DEFINITION
1 Construction material
Any type, size and nature of material, initial, temporary, intermediate or finished, whether manufactured locally or imported used for the purpose of construction industry
2 Construction industry
The industry related to construction works, including design, manufacturing, technology, material and workmanship and services for purposes of construction
3 Deal To handle, use, manufacture, supply, market, transfer, sell or buy, whether wholesale or retail, import or export
4 Certification A procedure by which Lembaga or any person authorized by it gives written assurance that a process, practice or service conforms with specified requirements
5 PPS A certificate issued by CIDB to certify product (Perakuan Pematuhan Standard)
6 CCPM On-line system for PPS application(Certification of Local Construction Products and Material )
TERMS AND DEFINITIONS
PPSSection 2: Definition
DIRECTORY
ENFORCEMENT of Act 520 Amendment 2011
Section 33 C (1)
REGISTER products and manufacturersSection 33 C (3)
CCPM
THE NEED TO REGISTER IN CCPM SYSTEM
ADVANTANGES OF HAVING PPS
To ensure the construction products/materials conform to standards
The manufacturers and products/materials shall be listed in the Direktori Pengeluar Bahan Binaan Tempatan annually.
To promote the products/materials
To enhance the enforcement of Act 520 (Amendment 2011)
Helps industry to identify products/material which available in the market that conform to standards
ENFORCEDListed in Schedule 4
(Act 520)
VOLUNTARYNot listed in Schedule 4
(Act 520)
IMPORTED MATERIAL
Consignment verification at Malaysian point of entry for CoA issuance.
Sampling, lab testing & factory inspection overseas.
Inspection & verification of overseas lab for Product Certification (PC).
CoA exemption processing.
LOCAL MATERIAL
Inspection, verification of quality and factory / product registration.
LOCAL MATERIAL
Inspection, verification of quality and factory / product registration – voluntary basis.
ENFORCEMENT OF QUALITY COMFORMANCE FOR MATERIALS
(LOCAL & IMPORTED)
IMPORTED MATERIAL
Inspection, verification of quality and factory / product registration – voluntary basis.
ENFORCEMENT CONCEPT
For voluntary materials – Perakuan Pemantuhan Standard (PPS) will be issued to manufacturers as
value added to them and on voluntary basis.
AKTA KASTAM 1967 (AKTA 235), Perintah Kastam Larangan Mengenai
Import
STANDARD COMFORMANCE PRODUCT/ MATERIAL DISTRIBUTION
PRODUCT/MATERIAL UTILIZATION
PPSCONSTRU
CTIONSuppliers/ Trading Houses/
Hardware ShopsConstruction Sites
CIDB, Consultants, Contractors, Clients, etc
CONSTRUCTION
COASuppliers/ Trading Houses/
Hardware ShopsConstruction Sites
CIDB, Consultants, Contractors, Clients, etc
Imported Products/ Materials Activities
Local Construction Products/Materials
Manufacturing Activities
QUALITY CONFORMANCE CONTROL & ENFORCEMENT MECHANISM OF CONSTRUCTION PRODUCTS
CB : Certification Body
CIDB
CIDBCIDB & CB
CIDB ,CB & KASTAM
AKTA 520 (Pindaan 2011)
PPS
OTHERS
CONTRACTORS
SUPPLIERS
MANUFACTURERS
CIDB (Regulator Body)
STANDARD MALAYSIA
(Accredition Body)
GOVERNMENT AGENCIES
issuer of the Perakuan Pemantuhan Standard (PPS) for manufacturer of construction products according Fourth Schedule 520 Act (Ammendment 2011)
developer of standards and accreditation
SIRIM
IKRAM
CERTIFICATION BODY/ ACCREDITED LAB
Certification body / Testing body, issuance of Product Certification/Full Type Test Report
CCPM
ON-lINE
THE PLAYERS (CONSTRUCTION PRODUCTS OR MATERIAL ACTIVITIES) …
ROLES OF MAJOR PLAYERS
CIDBHOLDINGS
PPS
PENGUATKUASAANAKTA 520 PINDAAN (2011)
Seksyen 33 C (1)
Imported materials/products(CoA) Port (Water route) CIQ (Road route) Airport (Air route) Bonded warehouses Suppliers Construction sites
Local materials/products Factories Suppliers/ Distributors Construction sites
METHOD OF ENFORCEMENT
Power of investigation Enter premises/ sites Search/seize Examine and test Search of person Seize materials Sell and dispose seized materials
12
Flowchart of PPS Application
13
Start
Access Application
Application
PPS
Desk Verification
Verification
Approval
End
Waiting approval
Rejected
Approved
Rejected
Approved
Failed
Approved
PERAKUAN PEMATUHAN
STANDARD (PPS)FOR LOCAL MATERIALS
14
-SAMPLE-
VERIFICATION PROCESS
AGENDA OF VERIFICATION
•Opening meeting•Briefing on production process
•Factory tour•Verify products as specified in PC in accordance to standard
•Closing meeting
CEMENTS INSPECTION ON VESSELS
CEMENT
PUBLICATION
Act 520 (Amendment 2011) empowered CIDB to regulate construction materials produced locally through certification process.
Enforced construction materials shall be listed in the Fourth Schedule of Act 520 (Amendment 2011) .
Quality Products must conform to Malaysia Standard (MS) Any person who ‘deal’ with uncertified materials shall be liable to a
fine of not less than RM10,000 but not more than RM500,000.’ PPS will only be issued to manufacturers that have Product
Certification (PC) PC must be issued by accredited CB which recognized by
Jabatan Standard Malaysia or CIDB , e.g. SIRIM, IKRAM PPS is valid for ONE YEAR and need to be renewed.
SUMMARY
WHAT YOU HAVE TO DO NEXT?
Register your factory through CCPM
Ensure your products have Product Certification (PC) from accredited CB
Get FREE a year registration (instead of RM 1,500)
UNIT BAHAN BINAAN TEMPATANCIDB IBU PEJABAT, PWTC
Address Tingkat 35, Menara Dato’ Onn, Pusat Dagangan Dunia Putra (PWTC)No. 45, Jalan Tun Ismail, 50480 Kuala Lumpur
Tel. No. 03- 4047 7454 (En. Rosmen Bin Ag Hasan)rosmen@cidb.gov.my03-4047 7447 (Pn. Nor Hamiza Zahar) hamiza@cidb.gov.my 03-4047 7438 (En. Zulkefli Ismail) zulkefli@cidb.gov.my
Fax No. 03-40477420
Thank
you
Aims to provide excellence services in meeting
performance and profitability needs of the construction industry through materials
development and utilization, which covers the areas of
quality, safety, environment, regulatory-compliant and
better-engineered materials.