QST Brochure

Post on 21-Mar-2016

239 views 1 download

Tags:

description

QST brochure

transcript

««QST is rapidly moving forward to fullf ill the promise of high quality»»QST Team

02

visionTo be the world»s most reliable and innovative manufacturer, service and solution provider in the steel industry.

mission statement To supply high-quality steel products, providing related services and solutions to a worldwide client base while utilizing innovative technologies within an environment of motivated employees focused on continuous improvement, highest business standards, work ethics and corporate citizenship, leading to added value to our customers and sustained return on investment to our shareholders.

03

core values

2 Integrity

We remain true to our founding values of quality, honesty and hard work. We have the highest ethical standards in the industry. We “do the right thing.” Qatar Space Technology is a business based on trust.

2 Safety

Our commitment to safety is complete and unwavering. We do not let time or money override our obligation to keeping our people safe.

2 Commitment

We are proactive in finding solutions for our clients that best achieve their goals. Lasting relationships are the lifeblood of our business. We want the client to feel that our staff is even more committed to the effort than their own staff.

04

05

about us

THE LEADING STEEL FABRICATORKnown Worldwide as the Middle East leading structural steel fabricator Qatar Space Technology was established in South Korea to offer its expertise in the fabrication of structural steel and plate works for various industrial and commercial applications.

For the past two decades QST supplied structural steel and plate works for many large power and desalination, petrochemical, gas and oil, cement plants, steel mills, high-rise buildings as well as other industrial and commercial complexes.

history and milestones

MARCH, 1998 ESTABLISHED AS MECHANICAL DIVISION, M/S. YOUSEF AL GHAMDI INDUSTRIES

MAY, 1998 PETROCHEMICAL OLEFIN III JUBAIL, KSA

• Mechanicalworkfor350unitsofrotatingequipments• Piperackinstallation• Preassembly&installationofpinfancooler(3,500tons)• 2unitsofinceronatorinstallation• 2unitsofpackageboiler&stack• 9unitsofgasturbinecompressorinstallation

JULY, 1999 SECO-CER/SPGP PP7 & PP8 Power Plant RIYADH, KSA

• Mechanicalwork• Piperackinstallation• Pipingworkforgassupplypipeline(150,000dia-inch)• Steam&gasturbineinstallation

JAN, 2000 - MOVING BUSINESS TO QATAR AS NAME OF «YOUSEF AL GHAMDI INDUSTRIES» BASED ON KSA BUSINESS LICENCE.

06

MAR, 2000 MESAEED, QATAR , NGL 4 PLANT, (QATAR PETROLEUM)

• Pipingwork• Offsitepipingwork• Tankfarmtie-inwork• Exitingplantpipingwork

MAY, 2001 ESTABLISHED AS M/S. YOLK ARABIA CONSTRUCTION CO., W.L.L. IN QATAR BASED

MAR, 2003 MESAEED, QATAR , LPG TANK PROJECT, (QATAR PETROLEUM)

• Fabricationofpiperacksteelstructure(1,200tons)

SEPTEMBER, 2003 BUSINESS INVESTMENT BY M/S. SPACE TECHNOLOGY CO., LTD (BASED ON SOUTH KOREA)

DEC, 2003 JOINT VENTURE WITH M/S. SPACE TECHNOLOGY CO., LTD

JAN, 2004 ESTABLISHED AS M/S. QATAR SPACE TECHNOLOGY W.L.L. (PARTNERSHIP WITH M/S SPACE TECHNOLOGY CO., LTD)

07

JULY, 2004 DOHA, QATAR, KHALIFA SPORT HALL (ASPIRE)

• SteelStructureErectionWork(11,100tons)• Painting&Scaffolding

OCT, 2004 MESAIEED, QATAR - QASCO HBI/DRI (QATAR STEEL COMPANY)

• BuildingWork• Design,Fabrication&InstallationofSteelStructure(2,200tons)• Scaffolding,Painting&FireProofing

NOV, 2004 DOHA, QATAR 44 WEST BAY RESIDENTIAL TOWERABDULLAH BIN NASSER BIN ABDULLAH AL MISNAD)

• Design,Fabrication&Install44FloorBuildingSteelStructure& MetalDeck(3,100tons)• Scaffolding,Painting&Fireproofing

SEP, 2005 DOHA, QATAR NATIONAL COMMAND CENTER(DOHA ASIAN GAMES ORGANIZING COMMITTEE)

• Design,Fabrication&InstallationofSteelStructure(900tons)• Scaffolding,Painting&FireProofing

JAN, 2006 PARTNERSHIP WITH MR. KHALID BIN ABDULLAH AL MISNAD (60% SHARE HOLDER)

FEB, 2006 DOHA, QATAR - KHALIFA TENNIS & SQUASH COMPLEX(QATAR OLYMPIC COMMITTEE)

• Design,Fabrication&InstallationofSteelStructure&Roofing(400tons)• Scaffolding,Painting&FireProofing

JAN,2007MESAIEED,QATAR“QATARCHEMICALPLANTI&II”

• PaintingWork(282,923.00m²)• SteelStructureInstallation(800tons)withScaffolding

SEP,2007DOHA,QATARALHITMIOFFICEBUILDING

08

ALIBINKHALIFAALHITMI&CO.)

• Design,Fabrication&InstallationofSteelStructurewithScaffolding

JULY,2008RASLAFFAN,QATAR,PEARLGTLPLANT–C4

• MetalCladdingInstallationWork(5,600m²)• AframeAssembly&ErectionWork• Constructionof80mx120mx12mHeightBlastingShop• 12units(300tons)ofheavyequipmentsupports

OCT,2008DOHA,QATAREMIRITERMINAL,PARKINGSTRUCTURE&MOSQUE(CP019)(NDIA-NEWDOHAINTERNATIONALAIRPORT)

• Design,Fabrication&InstallationofSteelStructure&Roofing(900tons)• Scaffolding,Painting&FireProofing

JAN,2009RASLAFFAN,QATAR“RASLAFFANCIWPP”(RASGIRTASPOWERCOMPANY)

• AluminumLouverforTrnsformerRoom• VariouskindofSteelFabrication&Supply

JUNE,2009MESAIEED,QATAR,QAFCO-5&6,QATARFERTILIZERSCOMPANY)

• VariouskindofSteelFabrication&Supply

JAN,2010RASLAFFAN,QATAR,NAKILATSHIPREPAIRYARD,(QATARPETROLEUM)

• PaintingWorkforPiping&Equipments(38,597.44m²)• CivilPaintingWork• VariouskindsofSteelFabrication&Supply• VariouskindsofStainlessSteelFabrication&Supply

APRIL,2010DOHA,QATAR,(MALE&FEMALESTUDENTHOUSINGQATARFOUNDATIONEDUCATIONCITY)

• VariouskindofSteelFabrication&Supply

NOV,2010DOHA,QATAR,ALDAREENTOWER

• VariouskindofSteelFabrication&Supply

09

Sales Performance History

10

Field of ActivitiesSteel Structures

• The“QST”havingbusinessofSteelStructurefabrication&Installation,andgivingsolu-tion of value engineering and the development of erection method for saving cost and time consumption

• PlantStructuresuchaspiperack,BulkStorages,shelterandEquipmentstructureforPowerPlant,PetrochemicalandCementPlant

• SuperStructuralSteel&Facade,substructuresteelWorkforBuilding,SportsComplex.Shopping Mall

• LightdutysteelWorkforCarParkSystem,WarehouseBuilding,SiteTemporaryFacilities

11

Production Division

• Fabrication&InstallationofStorageTank• PipingSpoolFabrication• SteelStructure&Misc.SteelFabrication• SuperstructureforStadiumsandSteelBuildings• Pre-EngineeredBuildingSystem• SpaceFrameStructures• SteelStructureforBuildings• IndustrialPlantSteelStructure• EmblemStructures• PipeSupport• Machiningworks• EmbedSteelpart&AnchorBolts

12

Industrial Plant Division

• PipingworkforGas&Oilfields,PowerPlant

• IndustrialPainting

• InstallationofGas&OilfieldPlantEquipments

• Incinerator

• Static&RotatingEquipmentwithInternalWorks

13

Major Projects

West Bay 44 Storey and Residential

LOCATION : WESTBAY,QATAR BLDG,STORIES44STOREY STRUCTURESTEEL+CONCRETE USAGERESIDENTIAL

OWNER : ABDULLAHBINNASSER BINABDULLAHALMISNAD

STEELCONTRACTOR : QATARSPACETECHNOLOGY

DESIGNER : MZ&PARTNERS

WORKVOLUME : STEELSTRUCTURE3,000TONS

STARTOFPROJECT : MARCH30,2005

COMPLETIONDATE : MAY30,2006(TOTAL15MONTHS)

14

Khalifa Sports Hall ProjectErectionofSuperStructure|ErectRibTrussontotheTemporaryTower,usingby2unitsoferectioncrane

InstallMainTruss(1partof10segments)usingby650TonsofHyd.Cranewith250TonsofCrawlerCrane

InstallCartWalkWayaftercompleteofRibTruss

MoveRiveTruss(App.30Tons)insideofBuildingbySPMModuleTransporterandUnloadingby250TonsofCrawlerCrane

ViewofaftercompleteofMainTrussErection(240MLongwithoutColumnStand

15

NGL- 4 Projects

Start : May2000

Complete : Oct.2000

OffsitePipingWork : 75,000DIA-Inch

PipingworkforrevampingareaatNGL1&2:15,000DIA-Inch

Tie-inWorktoExistingButaneTankT1,T2,T3&T4atTankFarmArea

16

Nakilat Ship Repair Yard, Ras Laffan - Qatar

WorkDescription

PaintingWorkswithScaffolding,MiscellaneousSteelWorkswithPaintingandHot-DipGalvanizationsuchas:-Fabrication&Supply:

Embedded AngleEmbeddedPlatesAnchorBoltsSteelGratingsCheckeredPlateTrenchCoverStaircase&Handrails

Quantity:

38,597.44M² forPaintingAbove 600 Tons of Steel Structure

Year:2010

17

Qatar Fertilizers Company (QAFCO-5), Mesaieed - QatarWorkDescription:-

MiscellaneousSteelWorkswithPaintingandHot-DipGalvanizationsuchas:-

• Fabrication&Supply:• EmbeddedAngle• EmbeddedPlates,• AnchorBolts,• SteelGratings,• CheckeredPlateTrenchCover,• Staircase&Handrails,• AcousticWallCladding

• ErectionofSteelStructureforPipeRack &EquipmentShelter

Quantity : Above1,800Tons

Year : 2009

18

Ras Laffan C IWPP Project, Ras Laffan - QatarWorkDescription:-

MiscellaneousSteelWorkswithPaintingandHot-DipGalvanizationsuchas:-

• Fabrication&Supply:• EmbeddedAngle• EmbeddedPlates,• AnchorBolts,• SteelGratings,• CheckeredPlateTrenchCover,• Staircase&Handrails,

• ErectionofSteelStructureforPipeRack&EquipmentShelter

Quantity : Above1,350Tons

Year : 2009

19

SECO-CER/SPGP PP7 & PP8 Power Plant, Riyadh - KSAWorkDescription

• Piping(PipeRackSteelStructure)&

• MechanicalWorksPackages.

Quantity : 150,000DIA-Inches

Year : 2000

20

Petrokemya Olef ins III, Jubail - KSAWorkDescription

Piping&MechanicalWorks Quantity

• 3,500TonsofPinFanCooler,• 350SetsofRotatingEQ,• 11UnitsofGasTurbineCompressoretc.

Year : 1998

21

Qatar Petroleum 3 Nos. of LPG Tanks & Conversion of Existing 2Nos. Propane Tanks , Mesaieed - QatarWorkDescription

FabricationofStructuralSteelforPipeRack

Quantity : 1,200Tons

Year : 2003

22

Qatar Steel Company (QASCO) HBI/DRI, Mesaieed - QatarWorkDescription

StructuralSteelWorkswithPaintingandFireproofing.

Mechanical works

Quantity : 1,200Tons

Year : 2005

Qatar Chemical Plant I & II, Mesaieed - QatarWorkDescription

• PaintingWorkswithScaffolding• StructuralSteelErectionWorkwithScaffolding,• FieldModificationWorkforSteelStructure.

Quantity

• 282,923.00M² forPainting• 800TonsofSteelStructure

Year : 2007~2009

23

New Doha Int'l Airport Emiri Terminal, Parking Structure & Mosque (CP019), Doha - QatarWorkDescription:-

StructuralSteelWorkswithPainting&Scaffolding.

Quantity : 900Tons

Year : 2009

24

Al Bidda Tower, Doha - QatarWorkDescription Structural Steel Erection Work

Quantity : 1,000Tons

Year : 2007

25

National Command Center, Duhail - QatarWorkDescription:-

StructuralSteelWorkswithPaintingandFireproofing.

Quantity : 900Tons

Year : 2006

26

Khalifa Int'l Tennis & Squash Complex, Doha - QatarWorkDescription:-

StructuralSteelWorkswithPaintingandFireproofing.

Quantity : 400Tons

Year : 2006

27