Introduction

Railway budget was being presented on25th February, 2011.

Railway¶s services are comparable to

emergency services, required all the time.rail transportation is vitally interlinked withthe economic development of the country.

We need a large heart and a large mind toundertake big works.

railways have developed several business-oriented policies for the first time.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 3/25

Railways

Infrastruc

ture for

Industry

Initiative

Special Freight

Train operators

Automob

ile and

Ancillary

Hubs

New Catering

Policy

some of policy

initiatives

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 4/25

Projects

 Announced setting up of a large number 

of rail-based factories/manufacturing

or on t ese projects are at different

stages of progress

Increasing demand

Components are not readily available.It as been decided to set up rail-based

industries.

Policies

85 proposals ave already beenreceived.

Ot er are also elcome

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 5/25

New Manufacturing units

work on thenew coachfactory at Rae

Bareli isprogressing

rapidly now

Work on the

wagon factoryin rissa willalso be takenup once the

site isfinalized.

Perambur¶ssecond unit

and Palakkadcoach factory

will start soon

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 6/25

New initiatives

� Jammu-Kashmir Rail Link projectinvolves a large number of bridges.

� Railways will set up a Bridge factory inJ&K

� propose to set up a state-of-the-artInstitute for Tunnel and Bridgeengineering at Jammu.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 7/25

I propose to set up a metro coach factory on the land purchasedfrom willing sellers at singur/adjacent polba.

Imphal, Manipur will soon be connected to the railway network.

Proposal of opening up a centre of excellence in software at

Darjeeling under the aegis of centre for railway information systemsSetting up of a railway industrial park through a joint venture

between Burn

Standard Co. Ltd. and SAIL has already been initiated in this Park.

 A captive thermal power plant of 1,000 MW at Nabi nagar is at anadvance stage of construction.

 A second thermal power plant of 1,320 MW capacity at Adra is inthe process of being set up.

New Manufacturing Initiatives

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 8/25

Expansion of rail infrastructure

� railways will be achieving its target of 800 km,

� for gauge conversion 700 km for doubling and 1,000 km of electrification.

� Railways¶ efforts to provide dignity to the poor through the Izzat scheme

� we have decided to give them small shelter throughS

ukhi GrihaS

cheme.

� This scheme is being taken up on pilot basis to provide 10,000 dwellingunits at Mumbai, Sealdah, Siliguri, Tiruchirapalli and other places.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 9/25

 Annual plan 2011-12

Rs. 57630cr 

The highestever plan

investment bythe railways.

Which will beraised throughGBS, diesel

cess, internal

resources,market

borrowingsthrough IFRC.

10000 cr will beraised throughtax free bonds.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 10/25

Projected lines

� greater thrustis given to theexpansion of the railnetwork withallocation of `9,583 cr for new lines.

In the lastbudget I hadannouncedupdation of 

surveys for 114socially

desirable newlines.

ut of this 94will be

completed byMarch, 2011

and theremaining by

December,2011.

there is ascheme for 12five year plan

for sociallydesirable lines.The scheme isbeing named,

PradhanMantri RailVikas Yojana.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 11/25

To connect unserved and

underserved regions to the rail network.

Wadsa-Gadchirholi in Maharashtra

Bhadutola-Jhargram via Lalgarh in WestBengal

Gudur-Durgrajpuram in Andhra Pradesh

Hansdiha-Godda in Jharkhand

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 12/25

 A non-lapsable Fund for railwayprojects in the northeast region hasbeen created that will boost theprogress of projects.

 All the state capitals of this regionexcept Sikkim will get connected by railnetwork in the next seven years.

India¶s longest tunnel between Banihaland Qazigund would be completed thisyear.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 13/25

Safety

� We are trying sincerely to ensure any incidents do not occur.

� Railway is passenger friendly, safe and a cheap mode of transport. Rail faresare close to one-fourth that of the road.\

� our recent trials with an improved version of ACD have met with success and itwill be commissioned on three zonal railways,

� The number of incidents at unmanned level crossings, has come down by 36%with the elimination of 1,500 unmanned crossings, construction of 172 R Bsand 240 RUBs/subways.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 14/25

safety

� Frequent calls for µrail rokos¶ are not only crippling operations on IndianRailways but also causing immense hardship to passengers,

� A GPS based µFog Safe¶ device edhas been deploy

� We cannot ensure efficient and punctual operations of trains without the help of state governments.

� I am now making an offer that whichever state ensures trouble-free train runningfor the whole year, shall be given two new trains and two projects as a special

package.

� An All India Security Help Line on a single number has been set up

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 15/25

Modernization of railways

 A project with IIT, Chennai on prototype manufacture of ultrasonic systems;

Partnership with Jadavpur University for development of new designs for rail steel bridges;

 A collaborative study with IIT, Mumbai on the problem of corrosion of rails;

E-procurement and e-auction to ensure transparency andeconomy.

Issuing paperless railway receipts;

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 16/25

InitiativesGreen initiatives

� Fr ee supply of 14 lakhCFLs to r ailwayhouseholds

� Regener ative br aking inMumbai EMUs

� Windmill at ICF, Chennai

� Pr oduction of locos withµhotel load conver ter¶

� Use of bio-diesel, CNG andL NG in locos, wor kshopsetc.

 Adarsh stations

� upgr adation of 584 stationsas Adar sh Stations, out of which 442 stations will be

completed by Mar ch 2011.� The r emaining will be

completed in 2011-12.

� safe dr inking water, pay &use toilets, high-level

 platfor ms, better  accessibility for the

 physically challengedamong many other facilitiesat these stations.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 17/25

Measures to improve passenger 

amenitiesIntroduction of a pan-India, multi-purpose ³Go-India´ smart cardon a pilot basis.

Better accessibility at stations for physically challengedcustomers;

 A new portal for e-ticketing by Centre for Railway Information

Systems (CRIS) is ready and will be launched shortly.

Provision of internet access on Howrah-Rajdhani Express as apilot project;

Introduction of advance booking of retiring rooms.

Extension of Rail Yatri Sevaks with modern trolleys to six more

stations:

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 18/25

Different facilities proposed

physically handicapped persons are not entitledfor concessions on Rajdhani and Shatabdi

trains. It is proposed to extend the concessionfacility to them in these trains also.

Press correspondents are now entitled to avail50% concession with family for two years.

 At present the concession for senior citizens isextended to both men and women at 60 years of age. I propose to reduce this in case of women

to 58 years.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 19/25

Staff welfare measures

Expand the scope of Liberalized ActiveRetirement Scheme for Guaranteed

Employment for safety category.

extending medical facilities to both dependentfather and mother of railway employees.

Increasing the scholarship for the girl child

Setting up of a Railway Vidyalaya PrabandhanBoard (RVPB) to improve quality of education to

children studying in 269 railway schools.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 20/25

Staff welfare

Recruitment

recruitment is inprocess of1.75 lakhs

 jobs

13,000 posts in RailwayProtection Force.

for the first time,railways are inducting16,000 ex-servicemenby end of March 2011.

Training

 A training centre isproposed to be

started at Kharagpur.

Setting up of Polytechnics

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 21/25

Metropolitan Projects

� Every day over 5 lakhpassengers utilize the metro

services.� It is also proposed to take up the

following new surveys for newconnectivity of Kolkata metro.

� It is also proposed to introduce34 new services in Kolkata Metroin the coming year.

KolkataMetro is

expandingits

network.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 22/25

Financial performance

Indian Railwaysare passing

through a very

difficult phase.

we have not

only paid thefull dividend for 2009-10, butalso achievedan operating

ratio of 95.3%.

The total grossearnings havenow been fixedat `94,742 cr 

which is `177 cr higher than the

budget.

we will save

`3,700 cr by our economy driveand other austerity

measures.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 23/25

Budget estimates

railways¶ earnings are set toexceed the rupees one lakh

crore mark.

rdinary Working Expenses havebeen assessed at `73,650 cr.

The expected perating Ratio is91.1%.

PSUs earning a net profit of `1,782 cr. These PSUs paid a

dividend ̀ 311.88 cr to the railways.

Hamara Mushkil Daur Gujar Chuka Hai 

 Aur Hum Din-o-din Majboot Hote Jayenge

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 24/25

Few benefits proposed

In 2011-12, the covering around 1,000 kmare proposed to be electrified.

There is no increase in passenger faresproposed for this year.

Mobile vans for issuing e-tickets will beextended to government medical college

hospitals, High Courts, District Court,University campus, IT hubs, IITs and IIMs.

8/7/2019 Railway budget 2011-12

http://slidepdf.com/reader/full/railway-budget-2011-12 25/25