The Future of

Quality Control

Simple Changes• A More Managed Maintenance Program• A Motivated Incentive Training Program• A Supportive Management Team• Solid Customer File Requirements • A Repetitive File Handling System• Color Management • Expansion Options for our Future

A More Managed Maintenance Program

One Google Doc Constantly Monitored

Weekly Audits

A Motivated Incentive Training Program

• Setting Expectations• Infractions when Expectations are not

met• Progression Program• On Site and Hands on Training• Lunch Incentives for Reaching Team

Goals• Gift Cards

A Supportive Management Team

• Open Door Policy• Giving Credit when Credit is due• Walking the Floor• Staying Positive• Keeping the Motivation Alive

Solid Customer File Requirements

A Repetitive File Handling System

• Same Rules Apply to us as the Customer Except:

• Black Point Compensation is Turned on• Ripping Files the same way using the same

Rendering Intents• Common Standard Profiles• RGB vs CMYK

A Repetitive File Handling System Continued...

Color Management

• Fresh Color Profiling• Consistent Color Profiling Recipe• Color Profiling Checker• Daily Color Audits using a Proofing Machine• Simulation Proofing and Simulation White

Point Rendering for Customers using a Proofing Machine

Expansion Options for the Future

• Automatic Grommet Placement• Automatic Tile Set up Including Overlaps,

Tile Naming and Rotation of every even numbered Tile

• Automatic Framing• Automatic Zund Cut File Creation with

Thumb Nails• Coast View

Expansion Options for the Future Continued...

Assembly Guides

Summary

• Profiling• Converting• Training• Managing

Profiling

• 276 Profiles to Build• Minimum of 69 profiles to start• Profile Recipe

Converting

• Caldera• System Stays the Same • Supervised by Ray• Pantones

Training

• Prepress• Printers• Myself

Managing

Simply Manage It!!!

Timeline

• Maintenance Begins Now• 35 Days to Profile the Minimum Number to

Begin• Caldera conversion Starts When

Equipment Arrives• 5 Days of Review• Training Begins on the 40th Day• Progression Program starts on the 60th day