…rebuilding an icon: paul rudolph's sarasota high school…

Post on 14-Feb-2017

219 views 1 download

transcript

…rebuilding an icon: paul rudolph’s sarasota high school…

…rebuilding an icon: paul rudolph’s sarasota high school…

…sarasota school of architecture…

…sarasota school of architecture…

…sarasota school of architecture…

…sarasota school of architecture…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…our journey…

…our journey…

0

500

1000

1500

2000

2500

3000

3500

School Year

Current Campus Capacity = 3273SHS Enrollment

…our promise…

Riverview High School

…our journey…

Access to 21st century science labs

Need for one central food service cafeteria

Need an appropriately sized gym with ancillary facilities

Considerations for Building 4

Safe and secure campus

Concern for historic preservation

…interview proposal…

…interview proposal…

…community involvement…

…sarasota county schools objectives…

Vision Ensure SHS staff and students have access to

facilities that support 21st century learning

Improve Safety & Security—Front Door Ensure 21st Century Instruction Decrease Operational Costs Respect History & Architecture

Project Objectives

…objective 1: enhance safety and security…

…objective 1: enhance safety and security…

…objective 2: ensure 21st century instruction…

…objective 2: ensure 21st century instruction…

…objective 3 &4: decrease operational cost & respect history and architecture…

Electricity $0.99+ Maintenance $1.14+ Custodial $1.83

Total $3.96$3.96 * 15,000 = $59,400

Cost Per Square Foot

Commitments Rehab building 4 Continue use for educational

purposes

Expressed Concerns Glassing in Entryways Demolition of west gym

…charrette…

…charrette…

Option 1… Option Price = Base Cost

…charrette…

Option 2… Option Price = Base Cost + $1.5 million

…charrette…

Option 3… Option Price = Base Cost + $1.2 million

…charrette…

Option 1 Option 2

Option 3

Introduce yourselves Use the “Active-Vote” device to

share your #1 issue Discuss the stated Project Objectives

Safety & Security 21st C. learning spaces Operational costs History and Architecture

Table Exercise #1 Discuss pros and cons of each Option

Reflect on the four project objectives and budget

Comment on Existing Options and identify Significant variations Refer to the posted options, as necessary

Select a representative to speak for the table

Table Exercise #2

…one of the most interesting evenings…

…charrette…

Option 4…

…charrette…

Option 5…

…charrette…

Option 6…

…charrette…

…charrette…

Option 5…

…existing conditions…

…original conditions…

…original conditions…

…new conditions…

…existing conditions…

…existing conditions…

…existing conditions…

The following products were used for this waterproofng system: Existing Substrate Condition MasterEmaco N 425 (Gel Patch) – Used to build

corners and level imperfections in columns, panels, walls and ceilings. MasterEmaco 581 (Thoroseal) MasterEmaco 584 (Thoroseal Plaster Mix) MasterProtect HB 400 (Thorocoat) Fine – 1st

Coat was done with HB 400 Fine with aggregate MasterProtect HB 200 - 2nd Coat was done with

HB 200 *MasterEmaco P-124 (Emaco P 24) – It was

used at all exposed rebar prior to repairs being performed

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…existing conditions…

…b4 transformation…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…completed b4 and future phases…

Animation-CompletedProject Lessons Learned-Owner’s Perspective Lessons Learned-CM’s Perspective Lessons Learned-Architect’s Perspective

Lessons Learned

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…4a…

…rebuilding an icon: paul rudolph’s sarasota high school…