Szabolcs I. Ferencz

5800 km pipeline The current network

ROHU phase I:

• 0.75 bcma capacity from 2019.10.01.

• 1.75 bcma capacity from the beginning of 2020

ROHU phase II:

• Open Season deadline prolonged until 2019.10.01.

• 4.4 bcm from 2022.10.01.