FEATURES OF HYPERMARKET

• Land - 14 Acres

• Built Up area for Phase 1 Building - 94,000 Sq Ft

• Built Up area for Phase 2 Building - 66,000 Sq Ft

• Total Built Up Area - 160,000 Sq Ft

• External Landscaping area – 450,000 Sq Ft

• Hard Landscaping - 210,000 Sq Ft

• Soft Landscaping - 240,000 Sq Ft

Access to Hypermarket

Total No of Entrance Gates - 9 Nos General Entry to Common People – 4 Nos Special Entrance for Township Residents – 3 Nos Utility Gates – 2 Nos

Parking Facility -

Car - 450 Nos Motor Cycle - 70 Nos Bicycle - 13 Nos Bus - 6 Nos

Shopping Trolleys - 2000 Nos

Trolley Parks – 10 Nos

Seating arrangements – 75 Benches to accommodate 300 persons

Construction Features

• Construction Started on - Oct’ 2006

• Completion of Project - Nov’ 2007

• Cement Consumed - 3500 MT

• Reinforcement Steel Consumed – 500 MT

• Structural Steel Consumed - 1600 MT

• Electrical Cable used 70 Kms

• Cable Tray fixed 8 Kms

• No of Lighting Fixtures 2200 Nos

• Illumination Level in Mall -

Maximum Level - 800 Lux

Average Level - 500 Lux

HOW WE BUILD THIS ?

CONSTRUCTION PICTURES

Land opposite Refinery Main Gate identified

BHOOMI - POOJAN

This way it was started in Oct 2006

Pre Engineered Building was Imported from Dubai and Installed at Site

Construction Progress Review by Chairman and other Directors

ACCIDENT WE FACED DURING CONSTRUCTION

( Fortunately No Injury )

TAKING SHAPE

AS BUILD….

PHOTOGRAPHS FOLLOWS…

VIEW FROM CAR ENTRANCE

PARKING AREA

SIDE VIEW OF BUILDING

VIEW FROM PEDESTRIAN ENTRANCE SIDE

BIRD’S EYE

FRONT VIEW FROM HELICOPTER

TROLLEY PARK

CANOPY 10m X 10m

Utilities at Hypermarket

• Power - Rated Capacity 3.2 MVA

• Power Load at Present 1.5 MVA

• HVAC System -

• Chillers Installed 3 Nos of 150 TR capacity each

• Total AHU installed – 7 nos of 15000 CFM each

• Water Treatment Plant - 20 m3 / hr

• Fire Water Operating Pressure 7 kg / cm2

• Water Storage Capacity 500 KL

• Pneumatic System installed

to keep water supply lines at 4 Kg/cm2 pressure at anytime.

Security & Loss Prevention System Introduced

• Every Entry & Exit are sealed & attended by Guards

• Frisking of staff – 100 %

• Material Monitoring - Receipts and dispatches are controlled

• General patrolling on periphery.

• Traffic Management

• Vigilance in Civil Dress

( A ) Physical Security :

• Access Control –

•Doors are with Magnetic Locks

• Restricted Entry

• Video Monitoring by 91 Cameras including PTZ Cameras

• Intruder Alarm System –

•Panic Buttons at Vital Locations

• PIR ( Passive Infra Red ) on all Entry & Exit

• Fire Alarms –

• Smoke Detectors – 351 nos

• Fire Hydrants – 14 nos

• Fire Extinguishers – 34 nos

• Manual Call Points – 12 nos

• Public Announcement System

( B ) Security Automation :

• Anti Shop Lifting Devices –

• Keeper Boxes with Sensor

• Spider Wraps with Sensor

• Apparel Tags ( Hard Tags )

• Soft Tags ( For shoes, leather items etc )

• IR (Infra Red) Alarm Pods for Mobile and other electronic goods

•EAS ( Electronic Article Surveillance ) Antenna.

( C ) Shrink Management :

( D ) Fraud Management :

• Monitoring POS transactions

• Internal Theft prevention

• Prevention of Sweet Shopping

President and Other Higher Officials on Inauguration Day

MAN AT SITE

Now Concentrating on next Project –

Family Entertainment Center at Jamnagar

Let’s not limit our challenges

Instead,

Let’s challenge our Limits !!