CEZ WIND FARMS IN ROMANIAFANTANELE, COGEALAC
ADRIAN BOROTEACORPORATE AFFAIRS DIRECTOR
CEZ ROMANIA
COMMUNICATION FROM THE EU COMMISSION TO PARLIAMENT AND COUNCIL (1) – 31.01.2011RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS
2
COMMUNICATION FROM THE EU COMMISSION TO PARLIAMENT AND COUNCIL (2) – 31.01.2011RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETS
3
RENEWABLE ENERGY: PROGRESSING TOWARDS 2020 TARGETSSUPPORTING SCHEMES
4
MEMBER STATES PROGRESS IN REACHING RENEWABLE TARGETS
5
CEZ GROUP IS AN INTERNATIONAL UTILITY WITH A STABLE POSITION IN DOMESTIC MARKET AND A GROWING PORTFOLIO IN CEE
6
CZECH REPUBLIC: RENEWABLES SUPPORT
ROMANIA: SUPPORTING SCHEME
9
CEZ WINDFARM PROJECT IN ROMANIA WILL BE THE LARGEST ON-SHORE IN EUROPE
10
CEZ WIND PARK IS DESIGNED TO PRODUCE 600 MW
11
CEZ WIND PARK IS DESIGNED TO PRODUCE 600 MW
12
WIND TURBINE PARTS WERE DELIVERED FROM DIFFERENT PARTS OF THE WORLD VIA MIDIA HARBOR
13
120 TURBINES EACH OF 2.5 MW WERE INSTALLED AT FANTANELE BY THE END OF 2010
14
THE MAIN TRANSFORMER STATION AT TARIVERDE WAS THE FASTEST TO BE BUILT IN ROMANIA
15
THE FIRST TURBINE WAS ENERGIZED IN JUNE 2010
16
CEZ GROUP INVESTMENT BRINGS MANY BENEFITS ALSO TO LOCAL COMMUNITIES WHERE THE WIND FARM WILL OPERATE
17
CEZ GROUP USED LOCAL EXPERIENCE DURING SUCCESSFULL IMPLEMENTATION OF THE WIND FARM PROJECT
THANK YOU VERY MUCH FOR YOUR KIND ATTENTION!