PROJECT MANAGEMENT
PRESENTED BY RAMEEZ HASSAN
MUJEEB MUSTHAFA
NASEEM MUSTHAFA
ABDUL RAUF
NOUSHEER VAN SANJU GEORGE
VIJEESH VELAYUDH
Trillium International LLC
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
2/22
COMPANY PROFILE
Thrillium International is a Dubai based company, expertise in the field
of consultancy, construction and management. Trillium specializes in bringing outstanding design to all areas of
interior and exhibition design. We are a close-knit team able to translateclients' ideas into successful projects, which work both aestheticallyand commercially.
We work with clients and their brand managers from concept to
completion to create effective solutions for both individual and roll-outidentities
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
3/22
Every project we do is bespoke: interior design projects should always be
unique
Our key services includes: -
Initial design consultation
Conceptual design
Space planning
Schematic design (Scheming and Visioning)
Character and theme development
Lifestyle space planning
Residential / retail / office / hotel / restaurant
Furniture, fabric, color and accessory selection
Fixed finishes planning, design and selection
Electromechanical works Kitchen and bath design
Construction documentation and administration
General and Technical Specifications
Value engineering
Additions, renovations and retrofits
Removals, reinstallations and disposal of unwanted items
7/31/2019 Restuarent PPT Final - Naseem Musthafa
4/22
SETTING UP A RESTAURANT
7/31/2019 Restuarent PPT Final - Naseem Musthafa
5/22
Brand Name: Toast n Grill
Location: Sky Courts Towers
Dubai Land Residence
Area Sq. Ft: 1314.49 sq. ft
Fit-out Period: 10th May 12 to 10th July12
Owner : Abdulla Omer
Project Manager: Mr. Raghu . M
Total Cost: 1,95,972.00AED
PROJECT OVER VIEW
7/31/2019 Restuarent PPT Final - Naseem Musthafa
6/22
STATEMENT OF WORK
Project scope
Design, Material selection & Procurement, Installations, Testing &commissioning, Maintenance of all types of MEP works , and interiordesigning for setting up of new restaurant.
This operates strictly under the applicable technical and safetyrequirements.
Design
The 3D design will be done accordance with the owners specificationsand requirements and will be sent to the owner and the landlord to theirapprovals. Both Interior and Exterior design has to be considered
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
7/22
STATEMENT OF WORK
Drawings
Detailed out let plan will be drawn according to UAE law. The drawingstates the kitchen specifications , dining space, counter area MEPpoints, gas line etc and this has to be approved from owner and as
well as the concerned authorizes like DM
Warranties
we are liable to replace or do maintenance work in case of any damage
or destruction with in a period of 1one year. And later after a year it willbe owners concern
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
8/22
STATEMENT OF WORK
Quality Assurance
All materials used on the project shall be of standard quality and underapproval from the owner
Inspection & Tests
It should carried on to all MEP works
Acceptance & PaymentsSuccessful completion of total project over a period of 90 days, Frequentvisit to the site during the fit out works to ascertain that the work isexecuted in reasonable conformity with all plans specifications
All payments to be made in AED and payable at sight on variousstages against submission of documents
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
9/22
BOQ BILL OF QUANTITY
Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
A Kitchen
1 Screeding 21 sqm 65.00 1365.00
2 Water proofing 1 Item LS 2500.00
3 Ceiling Works (60 X 60 ceiling) 21 Sqm 50.00 1050.00
4 Supply & installation of tiles (PC rate 30) 21 Sqm 90.00 1890.00
5 Supply & installation of ceramic tile skirting 36 LM 45.00 1620.00
6 Supply & installation of wall tiles 50 Sqm 110.00 5500.00
7 Supply & installation of paint on existing wall 95 Sqm 22.00 2090.00
8 Supply & installation of block wall 22 sqm 300.00 6600.00
7/31/2019 Restuarent PPT Final - Naseem Musthafa
10/22
BOQ BILL OF QUANTITY
Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
B Servery Counter Area
1 Screeding 18 sqm 65.00 1170.00
2 Ceiling Works (plain ceiling with painting) 18 sqm 125.00 2250.00
3 Ceiling bulkhead with cove formation 20 LM 80.00 1600.00
4 Supply & installation of tiles (PC rate 90) 18 sqm 150.00 2700.00
5 Supply & installation of ceramic tile skirting 9 LM 45.00 405.00
6 Supply & installation of cabinet behind the counterwith cladding
1 Item LS 20000.00
7Supply & installation of counter with veneer finshoutside & melamine finish inside
1 Item LS 50000.00
8 Supply & installation of paint on existing wall 6 sqm 22.00 132.00
7/31/2019 Restuarent PPT Final - Naseem Musthafa
11/22
BOQ BILL OF QUANTITY
Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
C Seating Area
1 Screeding 74 sqm 65.00 4810.00
2 Ceiling Works (painting) 74 sqm 35.00 2590.00
3 Supply & installation of tiles (PC rate 90) 74 sqm 150.00 11100.00
4 Supply & installation of ceramic tile skirting 32 LM 45.00 1440.00
5Supply & installation of paint on the walls (stucopaint)
96 sqm 100.00 9600.00
13 Finishes for freezer unit 1 Item LS 3500.00
7/31/2019 Restuarent PPT Final - Naseem Musthafa
12/22
BOQ BILL OF QUANTITY
Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
D Common
1 Drawing preparation 1 Item LS 2500.00
2Laison work for the approval process (All fees paid byclient)
1 Item LS 2000.00
3 Scafolding & other provisions 1 Item LS 1000.00
4 Cleaning the site 1 Item LS 1000.00
8 SIGNAGE (provisional Sum) 1 Item LS 8000.00
9 Supply & installation of the blinds 1 Item LS 3500.00
10 MEP Works (breakdown below) 1 Item LS 43880.00
Total195792.00
7/31/2019 Restuarent PPT Final - Naseem Musthafa
13/22
BOQ BILL OF QUANTITY (MEP)Sl. DESCRIPTION OF WORK QTY UNIT RATE AMOUNT
1 Supply & installation of 60 X 60 lights 5 Nos 250.00 1250.00
2 Supply & installation of down lights 3 Nos 300.00 900.00
3 Supply & installation of cove lights 18 LM 60.00 1080.00
4 Supply & installation of track lights 3 Nos 250.00 750.00
5 Supply & installation of emergency light 3 Nos 450.00 1350.00
6 Supply & installation of exit light 2 Nos 450.00 900.00
7 Wiring for the light points 23 Nos 150.00 3450.008 Supply & installation of sockets 15 Nos 350.00 5250.00
9 Supply & installation of floor boxes 3 Nos 600.00 1800.00
10 Allow cost for IT work (provisional) 1 Item LS 2500.00
11 Supply & installation of smoke detector 3 Nos 500.00 1500.00
12 Supply & installation of heat detector 1 Nos 650.00 650.00
13 Supply & installation of sprinkler 15 Nos 500.00 7500.00
14 Allow for Exhaust system 1 Item LS 5000.00
15 Sprinkler system testing & commissioning 1 Item LS 3500.00
16 Fire Alarm system testing & commissioning 1 Item LS 5000.00
17 DB modification 1 Item LS 1500.00
18 Allow cost for plumbing work (provisional) 1 Item LS 4000.00
Sub Total 43880.00
7/31/2019 Restuarent PPT Final - Naseem Musthafa
14/22
PROJECT TEAM
Project Manager
Civil Mechanical Electrical Designer Decorator
Purchasing
Manager Accountant Administration
Secretary
Supervisor Supervisor Supervisor 3D visualiser Supervisor Store keeper Office assistant
Mason AC techncian electricin Draftman Carpenter
Labours Plumber Helper helper
Driver helper
Cleaner
consultancy | construction | management
Cafeteria Set Up
7/31/2019 Restuarent PPT Final - Naseem Musthafa
15/22
WORK BREAKDOWN STRUCTURE
S.No Activity List DaysStart
DateEnd date
w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4Project start - End
1 Ini tial Conce pt Design 2
2 L ice ns e appro val 1
3 Tende ring and award 4
4 Mobi li sati on 7
5 Approval from authorities 7
6 De tai le d de si gn 5
7 Final approval from cleint 2
8 Mate rial Approva ls 21
9 De mol it io n w orks 2
10 Underground services 2
11 Scre ed ing works 3
12 Concealed conduits 5
13 AC equipment installation 20
14 AC ducting works 3
15 Plumbing installation 15
16 Ventilation and Hoods 5
17 Sprinkler pipe works 20
18 Fire alalrm works 20
19 Wal l p laster ing 15
20 Cei l ing grids 15
21 Wal l pan inting 10
22 Authority Inspection 1
23 wiring and DB installation 15
24 Counter installation 40
25 Light fixture installation 5
26 kitchen equipment installation 30
27 Final paini tng 3
28 Authority Inspection 1
29 Authority certificate 1
30 Final C le an ing 1
31 Testing and Commissioing 2
32 Cle int inspe ct ion 1
33 Handing over to cleint 1
34 project close out Documents 1
35 Pro je ct close out 1
MONTH -1 MONTH -2 MONTH -3Cafeteria Set Up
Work Break Down Strcuture
7/31/2019 Restuarent PPT Final - Naseem Musthafa
16/22
COMPLETION CERT FORMALITIES (DEPENDS ON
AUHTORITIES)
Approach civil defense for inspection
Receive civil def. certificate [depends on auth]
Approach tecom for completion certificate
Receive completion certificate [depends on auth]
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
17/22
DEMOBILIZATION
Completion of contracted services for the Company and removal of allour facilities, equipment and materials from the property.
Like
Scaffoldings
Mobile equipment removed from site
Fixed equipment removed from site
Equipment spares/parts removed from site
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
18/22
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
19/22
KITCHEN
Screeding
Water proofingCeiling Works (60 X 60 ceiling)
Supply & installation of tiles (PC rate 30)
Supply & installation of ceramic tile skirting
Supply & installation of wall tiles
Supply & installation of paint on existing wall
Supply & installation of block wall
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
20/22
SERVEY COUNTER AREA
Screeding
Ceiling Works (plain ceiling with painting)Ceiling bulkhead with cove formation
Supply & installation of tiles (PC rate 90)
Supply & installation of ceramic tile skirting
Supply & installation of cabinet behind the counter with cladding
Supply & installation of counter with veneer finish outside & melaminefinish inside
Supply & installation of paint on existing wall
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
21/22
SEATING AREA
Screeding
Ceiling Works (painting)Supply & installation of tiles (PC rate 90)
Supply & installation of ceramic tile skirting
Supply & installation of paint on the walls (stuco paint)
Finishes for freezer unit
consultancy | construction | management
7/31/2019 Restuarent PPT Final - Naseem Musthafa
22/22
COMMON
Drawing preparation
Liaison work for the approval process (All fees paid by client) Scaffolding & other provisions
Cleaning the site
SIGNAGE
Supply & installation of the blinds
MEP Works
consultancy | construction | management