WORKS NOTIFICATION
RAIL INFRASTRUCTURE ALLIANCE
RETAINING WALL INSTALLATION WORKSNORMANBY ROAD, CAULFIELDMONDAY 20 JULY TO FRIDAY 14 AUGUST 2020
As part of the Metro Tunnel works to construct the eastern tunnel entrance in South Yarra, we will be installing retaining walls along Normanby Road. The retaining walls will be used to support cables and rail signals that will power the new trains.
What we are doing• Installing retaining walls by excavating into the
ground
• Installing precast concrete panels, and securing them in place with additional concrete
• These works will involve the use of excavators, hand tools, concrete pumps and asphalting equipment.
WhenMonday 20 July to Friday 14 August• 7am to 6pm, Monday to Friday
• 7am to 1pm, Saturday.
What to be aware of• These works are expected to generate medium
levels of noise, with some periods of high-level noise
• A lane closure will be required to safely distance local traffic from equipment while it is in use
• Some parking will temporarily be removed during this time to allow for two-way traffic on Normanby Road. Traffic management will be in place to manage this safely.
High Street
High Street
Osm
ent Street Ko
oyo
ng R
oad
Ko
oyo
ng R
oad
Cheel Street
Dandenong Road
Normanby Road
Wattletree Road
Wattletree Road
Too
rong
a R
oad
Too
rong
a R
oad
Claremont Avenue
Ko
oyo
ng R
oad
Haw
tho
rn R
oad
Inkerman Road
Inkerman Road
Balaclava Road
Balaclava RoadK
amb
roo
k R
oad
Gle
nfer
rie
Ro
ad
Gle
nfer
rie
Ro
ad
Malvern Road
Malvern Road
Caulfield station
Armadale station
Toorak station
Malvern station
Key Works area Temporary lane closure Temporary parking
removal
More information To find out more about the Metro Tunnel Project:
metrotunnel.vic.gov.au
1800 105 105 (24 hours a day, 7 days a week)
Rail Projects Victoria PO Box 4509, Melbourne, VIC 3001
It should be noted that this information is current at the time of printing, however due to unforeseen circumstances, changes may occur. Please visit railprojects.vic.gov.au for the latest updates.
Health and safetyThe health and safety of our workers and the community is our key priority as we continue to deliver the Metro Tunnel Project, as is supporting physical distancing measures in line with current health advice.
We have strict protocols in place to protect the safety of our construction workforce, including enhanced industrial cleaning arrangements, provision of personal protective equipment and measures to reduce staff contact, including staggered shifts.
For more information about Coronavirus (COVID-19), please visit coronavirus.vic.gov.au