Post on 31-Jan-2016
description
transcript
RFF CONEMP Template
(as of 3 AUG 12)
5
UNCLASSIFIED
UNCLASSIFIEDNC JFLCC / USARNORTH NC JFLCC / USARNORTH ARNORTHAWCTrusteesBrief.15Mar12
RFF CONEMP: R/W Support for S&R RFF CONEMP: R/W Support for S&R
Situation: Hurricane Zeke will make landfall approx. 22 1600 JUL 12 vic New Orleans, LA. Local and LA State authorities have requested federal assistance. FEMA is Primary Agency and has requested DoD assistance for specialized capabilities.
Mission: JFLCC performs DoD directed support to Primary Agency (FEMA) for Consequence Management and relief from National Disaster.
Justification: JFLCC provides all-hazard DSCA support as directed in N-NC DSCA EXORD when requested by the PA.
Risk: Significant.
Risk Justification: Without DoD rotary wing support, individuals not accessible by ground evac may lose life.
Capability Required: Day/Night personnel rescue/recovery of individuals not readily accessible by land or water. Evacuation of critically injured individuals by air to treatment facilities.
Specialized Requirement: Must have night operating capability. Must provide non-standard litter air MEDEVAC capability.
Similar Capability in Theater: Y
(if Y) Similar Capabilities in Theater Text: State, local, and Coast Guard assets already employed to 100% capacity in area.
JRC Clarification: AV.
Sourcing Solution (Rec): 1 x Co./501ST GSAB, Fort Campbell, KY (CAT IV; not in CRE)Nomenclature: 8 x UH-60sEstimated Pax: 75
Intended Task and PurposeTasks: 1.Conduct Air Search and Rescue in Hurricane effected flood area2.Provide forward logistics movement to JTF units
Purpose: To provide immediate life-saving ISO of affected county
Mission Duration: 9 days (23 JUL – 01 AUG 12)
Support to: MA/MATO # 1234
Proposed Command RelationshipUnit will be OPCON to JFLCC and TACON to JTF-51
Admin and LogisticsFOB (Employment Location): Keesler AFB, Pearl River, MSBSI/JRSO&I: England AFB, Alexandria, LACommunications Support Requirements: None
Additional Instructions/Comments: All elements must be current on required water over-flight survival training/dunk tank.
CO
P
Desired Employment DTG23 0800 JUL 12
Priority of ReqLife-Saving
Priority of Flow JCRM ID239078
BSI
FOB
JTF-51 AO
JFLCC JOA
Proponent: G-3 AirExample (totally filled-in)
5
UNCLASSIFIED
UNCLASSIFIEDNC JFLCC / USARNORTH NC JFLCC / USARNORTH ARNORTHAWCTrusteesBrief.15Mar12
RFF CONEMP: R/W Support for S&R RFF CONEMP: R/W Support for S&R
Situation: Current Brief Situation as it relates to the need for this RFF application
Mission: Requested RFF capability mission statement
Justification: Should tie reason of request back to your HQ overall purpose to supporting PA
Risk: level of risk if RFF asset is not received
Risk Justification: What happens if your HQ does not get RFF asset at desired employment DTG
Capability Required: Insert specifics that drive to sourcing correct capability required
Specialized Requirement: added special requirements that are necessary to drive correct capability required (use only if applicable; if not applicable than use N/A)
Similar Capability in Theater: Is this a capability that is already used within AO / JOA
(if Y) Similar Capabilities in Theater Text: If yes, than explain why you are asking for DoD to provide.
JRC Clarification: Joint Requirement Code (for JCRM processing); provide JRC if known; coord with GFM for codes if not known
Sourcing Solution (Recommended): Nomenclature: (use if applicable)Estimated Pax: estimated paxs of recommended sourcing solution
Intended Task and PurposeTasks: 1.Specified task requested RFF unit will be executing2.Additional specified task if multiple tasks are required
Purpose: the why or endstate of above assigned tasks
Mission Duration: # days required to execute mission/MA; start and end date of requested mission
Support to: List MA and or MATO this RFF will be supporting; if not specifically supporting a MA than explain (DS / GS to the force in support of 3x FOBs – example)
Proposed Command RelationshipRequested RFF Unit in relationship to your HQ and or next higher HQ
Admin and LogisticsFOB (Employment Location): where RRF unit will end deployment from BSI to your HQ AOBSI/JRSO&I: Desired location that requested RFF unit will deploy to from HomestationCommunications Support Requirements: If applicable annotate reqts; if not applicable use N/A
Additional Instructions/Comments: any additional instructions necessary to facilitate effective/efficient deployment from HS to FOB
CO
P
Desired Employment DTGOr PTDO time
Priority of ReqMA code
Priority of FlowPrioritize if asking for more
than one RFF per same desired employment DTG
JCRM IDnumber if you inserted into
JCRM; if not leave blank
BSI
FOB
JTF-51 AO
JFLCC JOA
Proponent: Recommended Staff Lead to manage coord; Staff SME for this CapabilityTemplate Instructions
Insert detailed RFF COP to solidify clarification of intended use/employment of Requested RFF Unit; Keep in mind thisStoryboard/COP will probably be forwarded to higher HQTo facilitate speedy approval /understanding by 4 star HQsAnd OSD.