Roadwork signing john coles

Post on 07-May-2015

309 views 3 download

transcript

FFM 3 Indonesian Delegation May’12

Roadwork Signing

FFM 3 Indonesian Delegation May’12

Roadwork Signing.

FFM 3 Indonesian Delegation May’12

Roadwork Signing.

FFM 3 Indonesian Delegation May’12

Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing.

FFM 3 Indonesian Delegation May’12 Roadwork Signing

FFM 3 Indonesian Delegation May’12 Roadwork Signing

STRENGTHS • Reduces crashes

• Protects drivers

• Protects workers

• Smoother traffic flow

• Prevents work delay

• Safety improved

WEAKNESSES • Inconsistent use of

principles

• Lack of commitment

• Driver behaviour deteriorates

• Signs ignored

• Safety reduced

FFM 3 Indonesian Delegation May’12 Roadwork Signing