Rooftop Units Installation in Gainesville, Georgia

Post on 25-Jun-2015

78 views 1 download

Tags:

description

McKenney’s successfully installed roof top units along with a chilled water supply and return pipe system at a medical center kitchen.

transcript

Project NameMedical Center Kitchen

Project LocationGainesville, Georgia

Project TeamOwner: Medical CenterGeneral Contractor:Brasfield & Gorrie

Healthcare

Specializations

Markets

Architect: CDH Partners, Inc.

Engineer: HPD Engineers, LLC

Sheet Metal Shop Prefab

Hospitality

Pipe Shop Prefab

Despite tough safety issues, McKenney’s successfully installed roof top units along with a chilled water supply and return pipe system at amedical center kitchen.

The ChallengePiping had to be carefully installed through the boiler plant, into a crawl space with asbestos warning labels, up through thefloor and across the ceiling of the main switchboard room into the kitchen. New roof top units (RTUs) were very large and heavy. During the RTU installation lift, extreme precision was needed as there was only 18 inches of rigging space clearance.

The content of this document is not intended as an endorsement.

The SolutionThe McKenney’s team conducted pre-work hazard analysis and training to keep the job moving and installers safe. McKenney’s,the general contractor and the engineer developed a crane lift plan for the RTUs. Supplemental structural supports were added and equipment was relocated to facilitate a safe installation.

The ResultsThe project was completed safely with minimal schedule adjustment or additional costs, giving the medical center owner confidencethey had selected the right provider.

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

sales@mckenneys.com

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office:

www.mckenneys.com