RUGGED SOLAR LLC ABBREVIATIONS: PRELIMINARY NOT …...phone: fax: email: name: address: state: zip:...

Post on 04-Jul-2020

3 views 0 download

transcript

50.0'

50.0'

50.0'

50.0'

50.0'

50.0'

North of I-8, east of Ribbonwood Road.on both sides of McCain Valley Road

6120300100,6120301900,6110910700,6110910300,6110900400,6110600400,6110900200,6111000700,6111100100

C-100 LEGEND, SYMBOLS, ABBREVIATIONS& NOTES

C-101 PLOT PLAN DRAWING MAPC-102 PLOT PLAN NORTH WESTC-103 PLOT PLAN SOUTHC-104 PLOT PLAN CENTER TOPC-105 PLOT PLAN CENTER BOTTOMC-106 PLOT PLAN EASTC-107 ROAD DETAIL AND LANDSCAPE

SCREENING DETAILS

C-110 EASEMENT PLAN DRAWING MAPC-111 EASEMENT PLAN NORTH WESTC-112 EASEMENT PLAN EAST

C-120 PLOT PLAN 34.5 KV OVERHEAD

C-130 1.36 / 2.0 MW INVERTER BOX DESIGN/ ENERGY STORAGE SYSTEM

C-131 O&M BUILDINGC-132 FENCE ELEVATION DETAILC-133 TRACKER ELEVATION DETAILC-134 WATER TANK ELEVATION DETAIL,

34.5kV & 34.5kV / 69kV OVERHEAD ELEVATION DETAIL

APNSETBACK

SCHEDULEDESIGNATION

611-110-01 C

611-091-07 D

612-030-19 D

612-030-01 D

611-090-04 D

611-091-03 D

611-090-02 D

611-060-04 D

611-100-07 D

ENGINEERING SCALE: 1:1000

00 1000' 2000'

RUGGED SOLAR LLCRUGGED SOLAR PROJECT

PLOT PLAN

GENERAL NOTES:

1. Each tracker assembly is approximately 48 FTwide with a maximum constructed height of 30 ftand spaced approximately 69 FT North to South;82 FT East to West.

2. Entrance to each gate will be from an improveddriveway that shall be designed in accordancewith County of San Diego Design Standard DS-19and equipped with an emergency key-operatedoverride switch.

3. At no point does the change of grade, along theprimary access road, exceed 10%.

4. Detailed cross sections of the roads are providedon the preliminary grading plan.

5. All compaction requirements are listed on thepreliminary grading plan.

6. Turnaround shall be designed in accordance withCounty of San Diego Design Standard DS-06 for acounty emergency fire apparatus.

7. The project site is not located in a designatedflood plain, therefore lines of inundation are notshown.

8. Temporary and Permanent BMPs are shown onthe preliminary grading plan.

9. All coordinates shown are state plane coordinatesbased on CCS83, Zone 6 (2007.00 Epoch).

10. All dimensions are shown in Decimal Feet.

11. The solar related facilities (panels, electricalconnections, transformer/inverter platform, O&Mbuildings, emergency generator, fencing, internalaccess and switchgear pad, etc.) shown on theplot plans may be relocated, (exclusive of theopen space areas & undeveloped (futuredevelopment area)) with the administrativeapproval of the director of dplu when found inconformance with the intent and conditions of thepermit's approval. Transformer/inverter platformlocations can be relocated/reconfigured withoutrequirement of minor deviation.

12. Solar related facilities (panels, electricalconnections, transformer / inverter platform,emergency generator, fencing, internal accessand switchgear platform, etc.) shown on the plotplan maybe relocated, reconfigured, and / orresized within the solar facility development area(exclusive of any open space areas) with theadministrative approval of the director of PDSwhen found in conformance with the intent andconditions of permit's approval. Transformer /Inverter / Generator size, locations, brand,electrical size can be relocated, replaced orreconfigured without requirement of minordeviation.

13. Areas designated as "SPECIAL FUELMODIFICATION ZONES" are to be cleared ofexisting vegetation, then covered with landscapingfabric and weighted down using a surfacingmaterial of crushed stone.

14. Along the length of the perimeter fencing, every750 feet, a pedestrian gate will be located that is3 feet wide and padlocked with a chain and firekey.

15. Roads moved per fire department

16. When there is a major storm event all of thetrackers in the flood area will be placed in a flathorizontal position (Storm Mode) as required bythe plant standard of operations.

ABBREVIATIONS:

AC Alternating CurrentADT Average Daily TripsBB Building BlockBMP Best Management Practice

CEQA California EnvironmentalQuality Act

CPV Concentrating PhotovoltaicCFA County Fire Authority

DPLU County of San Diego, Department of Planning andLand Usage

DS Design Standard

EIR Environmental Impact ReportEOP Edge of Pavement

FT FeetkV kilovoltskW kilowatts

MAX MaximumMOU Memorandum of UnderstandingMPA Major Use Permit ApplicationMUP Major Use PermitMW MegawattsNTS Not to Scale

PL Property LinesQTY QuantityRL Rural LandROW Right of WayRPO Resource Protection Ordinance

SQFT Square Feet

To be submitted under separate coverSIGHT DISTANCE:

OWNER INFORMATION

NAME: Waterstone SupportFoundation Inc. John Gibson Frankie Thibodeau Vista Oaks Business Park

John GibsonHarmony Grove PartnersJohn Gibson

ADDRESS: 2925 Professional Pl #200 39990 Roadrunner Ln 1000 Pioneer Way 1000 Pioneer Way

CITY: Colorado Springs Boulevard El Cajon El Cajon

STATE: CO CA CA CA

ZIP: 80904 91905 92020 92020

PHONE: (619) 440-7424 (619) 766-9105 (619) 440-7424 (619) 440-7424

APN# 'sand(Acreage)

611-110-01 (63.72)611-091-07 (42.39),612-030-19 (43.43),612-030-01 (33.11)

611-090-04 (22.62),611-091-03 (14.62),611-090-02 (69.83),611-060-04 (1.64),

611-100-07 (214.84)

TOTALTRACKER 434 799 617 1441

2

NAME:

ADDRESS:

CITY:

STATE:

ZIP:

PHONE:

FAX:

EMAIL:

NAME:

ADDRESS:

CITY:

STATE:

ZIP:

PHONE:

FAX:

EMAIL:

APN:

SITE ADDRESS:

DESIGNER SIGNATURE REQUIRED DATE

FILE

NA

ME

: P:\1

0 E

NE

RG

Y W

ES

T_C

UR

RE

NT\

LI -

CO

NC

EN

TRIX

SO

LAR

- 6

0212

653\

400

TEC

HN

ICA

L\40

1 P

RE

LIM

INA

RY

EN

GIN

EE

RIN

G\7

PLA

NS

- C

AD

D F

ILE

S\A

CA

D S

OLA

R C

PV

LA

YO

UT\

RU

GG

ED

SO

LAR

\C-1

00 C

OV

ER

.DW

GLA

ST

SA

VE

D B

Y: P

ATT

ES

ON

J

PLO

T D

ATE

: 12/

15/2

014

11:3

3:30

AM

PR

ELI

MIN

AR

Y N

OT

FOR

CO

NS

TRU

CTI

ON

DESIGNER

AECOMAECOM TECHINCAL SERVICES, INC440 Stevens Avenue, Suite 250Solana Beach, CA 98075858.947.7144 tel 858.947.7145 faxwww.aecom.com

CLIENT

16550 Via EsprilloSan Diego, CA 92127

CPV System Summary

Approx. Number of Trackers: 3291

No. of Inverter Skids: 57

Total Lease Area (Acres): 506

Estimated Disturbed Acreage: 490

Coverage Ratio Range: 0.3 - 13%

EXISTING:Rolling, rugged land with two detached land sectionsmade up of many parcels. All land is randomlypopulated by boulders. The site is minimallydeveloped with unpaved roads.PROPOSED:Project located on approximately 506 acres andincludes construction and operation of approximately3291 Concentrated Photovoltaic (CPV) trackers withassociated approximately 57 Inverters Skids andTransformers.

AR

CH

D 2

4" x

36"

I CERTIFY THAT I HAVE READ ALL ZONING REGULATIONS AND BESTMANAGEMENT PRACTICES (BMPs) NOTES AND THAT I AM THE DESIGNEROF THE PROPOSED PROJECT:

LEGEND, SYMBOLSABBEREVATIONS

& NOTES

1C-100

Pat Brown

16550 Via Esprillo

San Diego

CA

92127

(858) 746-9000

patrick.brown@soitec.com

SEE TABLE AT C-100

SDC PDS RCVD 12-16-14 3300-12-007

1 - 56