1Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Runnymede and Keele Stations – Easier Access Project Updates Public Open House
December 11, 2018
2Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Status of Easier Access Program• 45 stations are now accessible: - St Patrick Station is the latest station to become accessible in
December, 2018.• Stations under construction in 2018: - Dupont, Chester, Royal York, Wellesley, Yorkdale and Wilson.• Runnymede Station elevator construction will begin in late 2018
and is scheduled to be accessible by the end of 2020.• Keele Station elevator construction will begin in 2019 (start date is
TBD) and is scheduled to be accessible by the end of 2021.• All stations are scheduled to be made accessible by 2025.
3Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Nearby Stations – Expected Accessibility Schedule
Dundas W
est
Keele
High P
ark
Runnymed
eJa
ne
Old M
ill
Royal Y
ork
Expected2024
Expected2020
Expected2023
Expected2021
2019 2024 2020 2023 2021
4Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Advisory Committee on Accessible Transit (ACAT)ACAT Overview• Toronto citizens who advise the TTC on difficulties faced by people with disabilities and
seniors • Recommends the elimination of barriers to accessible public transit in the City of Toronto• ACAT consists of 15 volunteer committee members who are appointed by the TTC Board
ACAT’s Role• Represents the needs and concerns of persons with disabilities and seniors who use public
transit services provided by the TTC.• Advises the TTC on the provision of accessible public transit.• Advises the TTC on necessary policy issues for services that pertain to the interests of
persons with disabilities and seniors.• Supports TTC staff in consulting, educating, and advising persons with disabilities, seniors
and the community at large. • Subcommittees – Design Review, Service Planning, Communications, and Wheel-Trans
Operations• Advises TTC on priority and plans for Easier Access projects
5Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Runnymede Station Elevator Plan
Runnymede Station
Concourse
Platform
Street Level
Westbound Train Eastbound Train
Elevator E1Elevator E2 Elevator E3
Cross section image
6Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Runnymede Station Elevator Plan
EntranceEntrance
Entrance
Bus Driveway
FanVent
Shraft
Laneway
E2
E1
New Manhole New Manhole
Stair and escalatordown to concourse
Down
Up
WR
Down
Down
Down
New elevator below grade from concourse to westbound platform
New elevator below grade from concourse to eastbound platform
E3
New elevatorfrom street to concourse K
ennedy A
ve
Runnym
ede R
oad
Bloor Street West
7Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Runnymede Station
E1 - Concourse level elevator rendering
8Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Laneway Construction Plan – approx. one year
2218 2216 22142212 2210 2208
Bus platform
Pedestrian pathwayduring construction
Bus driveway
2206 2204 2202 2200 2198
2198A
21962194
2196A258
254
Bloor Street West
Runnym
ede R
oad
Kenned
y Ave
RunnymedeStation
Station outline
EntranceEntrance
Down
Up
WR
Down
Down
Down
E2
E3
E1
9Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Construction Details and Transit Information• Installation of hoarding and exit pathways will be created in the laneway.• The western portion of laneway will be closed for E3 construction for
at least one year to complete the following: ◦ Shoring ◦ Excavation ◦ Constructionoftheelevatorstructure/shaft ◦ Backfill ◦ Restoration• In Fall, 2019 the bus roadway will be closed for E2 construction
(closed for approximately 3 months followed by a partial closure for 6 months). For 3 months, TTC riders will board buses on-street or at a neighbouring station. A detailed transit service plan will be provided closer to the time of the closure. Signage will be in place.
• At a later stage, the masonry wall will be upgraded and the laneway will be restored (laneway reductions are required for these works).
10Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Construction Details and Transit Information• Noise and dust associated with construction can be expected. Efforts
will be made to keep disruption associated with noise and dust to a minimum.
• Most work will take place from 7 a.m. to 7 p.m., with some extensions outside of these hours in order to complete the work as quickly as possible.
•Protectiveconstructionhoardingwillbeinplaceandvehicles/equipment will access these work zones from Kennedy Avenue and Runnymede Road.
• Station bike parking will be relocated and maintained.
11Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Runnymede Station – Public Art • Runnymede Station will receive public art in accordance with the
Public Art Policy. • An open call and pre-qualification was prepared.• A jury selected the concept to be installed. • Elicser Elliot was chosen to install his art concept entitled,
“Anonymous Somebody”.• On June 5, 2017 TTC presented the public art concept for this and
other stations at the Toronto Public Library at Yonge and Bloor.• Art installed prior to project completion.
12Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Runnymede Station – Public Art
13Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Elicser Elliot: Anonymous Somebody• Anonymous Somebody captures the snippets of our bustling Bloor
West Village lives while standing still. • The artworks aims to communicate the story of individual spirit as
fresh and relevant to the metabolism of the neighbourhood. • The images work as an anchor to a thought or memory for the person
viewing it – to commemorate, celebrate, provoke, and heal. • Not unlike Runnymede, a house that became a community,
Anonymous Somebody welcomes all passengers to reframe the characters’ experience as they pass or wait, fluidly transitioning from past lives to present, making the artwork their own.
14Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Keele Station Project• Easier Access Improvements: • Barrier-free path from the main entrance to all levels of the station
including installation of: ◦2elevatorstoaccesseastboundandwestboundplatforms ◦PRESTO-enabledaccessiblefaregates(alreadyinstalled) ◦Automaticslidingstationentrydoors ◦Improvedsignage ◦CCTV–Securitycamerasalongtheaccessiblepathway
• Reviewed by ACAT (Advisory Committee on Accessible Transit)
15Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Keele Station Elevator Plan
Platform
Street Level
WESTBOUND TRAIN EASTBOUND TRAIN
Elevator E2 Elevator E1
KEELE
Concourse
Cross section image
16Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Keele Station Elevator PlanKeele Station Elevator Design, Street Level
17Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Construction Details and Transit Information•Thebusloopwillbeclosedin2020(TBD)inordertoupgrade/repave
the bus roadway, bus platforms and to complete some preliminary underground work. During this time, TTC riders will board buses on-street or at a neighbouring station. A detailed transit service plan will be provided closer to the time of the closure. Signage will be in place.
• Noise and dust associated with construction can be expected. Efforts will be made to keep disruption associated with noise and dust to a minimum.
• Most work will take place from 7 a.m. to 7 p.m., with some extensions outside of these hours in order to complete the work as quickly as possible.
• Station bike parking will be relocated and maintained.
18Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
Keele Station – Station Exterior/Elevator Rendering
19Runnymede and Keele Station – Easier Access Project Updates Public Open House December 11, 2018
• Keele Station will receive public art in accordance with the Public Art Policy.
• An open call and pre-qualification will be prepared (3 artists to be selected to submit an art concept).
• A jury will be formed including a local representative to select the concept to be installed.
• Art installed upon project completion.
Keele Station – Public Art