School Technology and Readiness: STaR Chart

Post on 12-Dec-2014

289 views 0 download

Tags:

description

 

transcript

School Technology and

Readiness…

Texas STaR Chart Analysis

Agenda:

What is a STaR chart?

Four Key Areas

Gene Pike MS data

What is the STaR Chart?

Based on 4 key areas of Texas Long-Range Technology Plan (TLRTP) through 2020

Designed to inform districts and campuses about progress towards TLRTP

Identified professional development needs

Completed annually by school principal

Four Key Areas

Teaching and Learning

Educator Preparation and Development

Leadership, Administration and Instructional Support

Infrastructure for Technology

Teaching and LearningPatterns of classroom use

Frequency design of instructional setting

Content area connections

Technology applications TEKS implementation

Student mastery of technology applications

Online learning

Educator Preparation and Development

Professional development experiences

Models of professional development

Capabilities of educators

Access to professional development

Levels of understanding and patterns of use

Professional development for online learning

Leadership, Administration, and Instructional Support

Leadership and Vision

Planning

Instructional Support

Communication and collaborations

Budget

Leadership and support for online learning

Infrastructure for Technology

Students per computer

Internet access connectivity speed

Other classroom technology

Technical support

Local area network, wide area network

Distance learning capacity

How does Gene Pike compare?STaR Chart analysis for 2006-2009:

0

6

12

18

2006-20072007-20082008-2009

Gene Pike’s Readiness over 3 year period:

2006-2007 2007-2008 2008-200960%

62%

64%

66%

68%

Is Gene Pike ready to

move our students into

the 21st century???

http://starchart.esc12.net/ Texas Campus STaR Chart