SITE DOCUMENTATION, BUILDING SELECTION, AND BUILDING ... · musical fountain water tower margaret...

Post on 29-Jun-2020

1 views 0 download

transcript

SITE DOCUMENTATION, BUILDING SELECTION, AND BUILDING / SITE ANALYSIS DIAGRAMS

Zuzana Corral, IND 6970 / Spring 2011, Instructor: Sarah Sherman

TYPOLOGY & LOCATION

THERMAL MINERAL SPABUDAPEST, HUNGARY

SITE & BUILDING SELECTION

FIU RECREATION CENTER

MARGARET ISLAND, BUDAPEST

SITE DOCUMENTATION

JAPANESE GARDEN MUSICAL WATER WELL DANUBIUS HEALTH SPA RESORT

DANUBIUS GRAND HOTEL

SITE(PEDESTRIAN ISLAND)

PALADIUS STRAND

A. HAJOS SWIMMING HALL

MUSICAL FOUNTAIN

WATER TOWER

MARGARET BRIDGE

ARPAD BRIDGE

SITE/BUILDING ANALYSIS DIAGRAMS

BUILDING ORIENTATIONSITE ELEMENTS THAT EFFECT BUILDING EXPOSURESOURCES OF NOISEVIEWS FROM SITE

RIVER

TREES

VIEWS

NOISE

N

E

W

S

ORIENTATION

SUN PATHWIND

SW

SITE/BUILDING ANALYSIS DIAGRAMS

SCOPE OF PROJECTSITE TOPOGRAPHIC CONSIDERATIONSFIRST FLOOR: scale 1/32”= 1’-0”

INTENDED USE

SQUARE FOOTAGE & SITE DIAGRAM

TREES

GRASS

RIVER

SCOPE OF PROJECTSITE TOPOGRAPHIC CONSIDERATIONSSECOND FLOOR: scale 1/32”= 1’-0”

SQUARE FOOTAGE & SITE DIAGRAM

INTENDED USE

TREES

GRASS

RIVER

SITE & EXTERIOR ENCLOSURE DIAGRAM

EDGE CONDITIONS

POSSIBLE PARKING

SITEscale 1/32”= 1’-0”

RIVER

POTENTIAL NOISE

TRAFFIC PATTERN

MEP DIAGRAMS

DECEMBER 21 SUN PATH

ORIENTATION OF BUILDINGSUN PATH DIAGRAMEXISTING SUN SHADING DEVICESEXISTING ELECTRICAL, HVAC, AND PLUMBING SYSTEMSscale 1/32”= 1’-0”

JUNE 21 SUN PATH

SUNRISE4.47 AM

SUNRISE7.21 AM

SUNSET8.44 PM

SUNSET4.30 PM

N

E

W

S

ORIENTATIONEXISTING ELECTRICAL, HVAC AND PLUMBING SYSTEMS - YES

SHADING DEVICE

PRIVATE

PUBLIC/PRIVATEFIRST FLOOR: scale 1/32”= 1’-0”

ZONNING DIAGRAM

SEMI PUBLIC

PUBLIC

PUBLIC/PRIVATESECOND FLOOR: scale 1/32”= 1’-0”

ZONNING DIAGRAM

PRIVATE

SEMI PUBLIC

PUBLIC

PUBLIC/SERVICEFIRST FLOOR: scale 1/32”= 1’-0”

ZONNING DIAGRAM

SERVICE

PUBLIC

PUBLIC/SERVICESECOND FLOOR: scale 1/32”= 1’-0”

SERVICE

PUBLIC

ZONNING DIAGRAM

DAYLIGHTINGMAJOR CIRCULATION SPACESFIRST FLOOR: scale 1/32”= 1’-0”

ZONNING DIAGRAM

MAJORCIRCULATION

DAYLIGHTING

DAYLIGTHINGMAJOR CIRCULATION SPACESSECOND FLOOR: scale 1/32”= 1’-0”

ZONNING DIAGRAM

MAJORCIRCULATION

DAYLIGHTING

BUILDINGSPACE ORGANIZATIONACCESSFIRST FLOOR: scale 1/32”= 1’-0”

STRUCTURE DIAGRAM

SPACE ORGANIZATION

ACCESS / ENTRY

ACCESS / EXIT

GLAZED ENCLOSURE

SOLID STRUCTURALENCLOSURE

STRUCTURAL COLUMNS

BUILDINGSPACE ORGANIZATIONACCESSSECOND FLOOR: scale 1/32”= 1’-0”

STRUCTURE DIAGRAM

SPACE ORGANIZATION

ACCESS / ENTRY

ACCESS / EXIT

GLAZED ENCLOSURE

SOLID STRUCTURALENCLOSURE

STRUCTURAL COLUMNS

APPARENT ARCHITECTURAL DESIGN INTENTIONEXISTING ELEMENTS – LANDMARK, POSSIBLE NODES,PATHSORGANIZATIONAL SYSTEMENTRY – ARRIVAL SPACESFIRST FLOOR: scale 1/32”= 1’-0”

CIRCULATION, VIEW, MATERIALS DIAGRAM

ENTRY

CIRCULATION

ARRIVAL SPACE

LANDMARK

POSSIBLE NODE

VIEWS

RIVER

TREES

CONCRETE

GLASS

APPARENT ARCHITECTURAL DESIGN INTENTIONEXISTING ELEMENTS – LANDMARK, POSSIBLE NODES,PATHSORGANIZATIONAL SYSTEMENTRY – ARRIVAL SPACESSECOND FLOOR: scale 1/32”= 1’-0”

ENTRY

CIRCULATION

ARRIVAL SPACE

LANDMARK

POSSIBLE NODE

VIEWS

RIVER

TREES

CONCRETE

GLASS

CIRCULATION, VIEW, MATERIALS DIAGRAM

MODEL

scale 1/16” = 1’-0”

MODEL

scale 1/16” = 1’-0”

MODEL

scale 1/16” = 1’-0”

MODEL

scale 1/16” = 1’-0”

MODEL

scale 1/16” = 1’-0”