SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
1
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
1
EXECUTIVE SUMMARY This report describes project status updates, financial data and observations of the Smart Columbus Electrification Program over the time period from October – December 2018 (Q7). The reporting period for financial expenditure data for the City of Columbus was through December 31, 2018.
PROJECT DESCRIPTION AND STATUS The overall goal of this project is to measurably decrease light-duty transportation greenhouse gas (GHG) emissions expressed in equivalent metric tons of carbon dioxide (MTeCO2) as a result of grid decarbonization; electric vehicle (EV) fleet adoption; transit, autonomous and multi-modal systems (implemented via USDOT grant agreement); consumer EV adoption; and charging infrastructure during the grant period compared to a baseline year (2016).
Q7 Key Highlights:
COLUMBUS WAS A WINNING CITY IN THE BLOOMBERG AMERICAN
CITIES CLIMATE CHALLENGE, WHICH IS A TWO YEAR ACCELERATION
PROGRAM TO HELP MEET NEAR-TERM CARBON REDUCTION GOALS
IHS MARKIT (POLK) DATA FOR 2018 Q3 (PROGRAM Q6) SHOWED A NEW MARKET PENETRATION RATE OF 1.21%, SURPASSING THE GOAL OF 1.1%.
IN ADDITION, OCTOBER AND NOVEMBER EV SALES SURPASSED 2% Priority 1: Decarbonization Objective: In partnership with power providers, by 2030 install 905 MW of utility scale renewable energy generation capable of serving the Columbus region, procure a minimum of 1.2 million MWh of renewable energy for the City of Columbus between 2017 and 2022, and save 480 GWh consumed through energy efficiency and smart grid programs during the time period of the grant.
Q7 Key Highlights:
468,196 AEP OHIO ADVANCED METERING INFRASTRUCTURE (AMI) METERS
INSTALLED TO DATE
50% COMPLETE WITH THE DESIGN
PHASE ON THE O’SHAUGHNESSY DAM IMPROVEMENTS PROJECT
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
2
AN RFP WAS ADVERTISED FOR THE COLUMBUS DIVISION OF POWER (DOP) AMI PROJECT
BEGAN DETAILED DESIGN PLANS FOR THE JACKSON
PIKE CO-GENERATION WASTEWATER TREATMENT
PLANT PROJECT
$690,000 IN LED LUMINAIRES WERE PURCHASED BY THE COLUMBUS DIVISION OF POWER (DOP) AND WILL BE USED TO CONVERT
EXISTING CIRCUITS
Priority 2: Fleet Adoption Objective: Work with public, private and academic sectors to place in operation 790 EVs into their fleets by the end of the grant period.
Q7 Key Highlights:
36 NEW PUBLIC FLEET EV PURCHASES AND
4 NEW COMMITMENTS SECURED IN Q7
47 NEW PRIVATE FLEET EV COMMITMENTS SECURED IN Q7
25 BASELINE PRIVATE FLEET ASSESSMENTS COMPLETED TO DATE
80 UBER DRIVERS ATTENDED THE
UBER RIDE & DRIVE AND EDUCATIONAL EVENT
ROUND 2 OF THE TRANSPORTATION SERVICE PROVIDER (TSP) REBATE
PROGRAM WAS RELEASED
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
3
Priority 3: Transit, Autonomous and Multi-Modal Systems in the City Objective: Ensure a comprehensive, multi-modal approach to decarbonizing the Columbus region’s mobility options. Q7 Key Highlights:
4.58 MILES OF BIKE
INFRASTRUCTURE ADDED IN Q7
LAUNCHED AN INTEGRATION
WITHIN THE PULLL APP, SPONSORED BY PELOTONIA, TO
LOG COMMUTES VIA WALKING OR
BIKING
2,469 PEOPLE RODE THE SMART CIRCUIT,
OHIO’S FIRST SELF-DRIVING SHUTTLE, WHICH WAS LAUNCHED IN DECEMBER
Priority 4: Consumer EV Adoption Objective: Increase EV market adoption as evidenced by the percentage of light duty EV registrations in Columbus and the surrounding seven-county region, attaining 1.8% of all new and used light duty vehicle registrations by the end of the three-year grant period, representing a 486% increase from the 2015 baseline of 0.37%.
Q7 Key Highlights:
COMPLETED A LOGIC MODEL AND EVALUATION
PLAN FOR MAJOR CONSUMER ADOPTION
PROGRAMS
LAUNCHED THE EV CONSUMER EDUCATION CAMPAIGN ACROSS TV,
STREAMING TV APPS, DIGITAL, SOCIAL MEDIA AND WAZE
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
4
SMART CITIES DIVE NAMED COLUMBUS ITS CITY OF THE YEAR,
CITING COLUMBUS’ PROGRESS TOWARD ITS ELECTRIFICATION GOALS AS A MAJOR REASON
FOR THE RECOGNITION.
COLUMBUS COLLEGE OF ART & DESIGN (CCAD)
STUDENTS PRESENTED
CONCEPTS FOR PUBLIC ART
INSTALLATIONS
59 RIDE & DRIVE ROADSHOW EVENTS IN 2018 WITH
6,837 TEST DRIVES AND A
13.6% DEALERSHIP OPT-IN RATE
3 CENTRAL OHIO AUTO
DEALERSHIPS WERE INDUCTED INTO THE ELECTRIFIED DEALER
PROGRAM
269 EVS FOR SALE IN
23 DIFFERENT MODELS FROM
41 DEALERSHIPS IN CENTRAL OHIO
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
5
Priority 5: Charging Infrastructure Objective: Support the acceleration of EV adoption through installation of charging infrastructure, with the goal of 925 new charging ports by the end of the grant period.
Q7 Key Highlights:
28 MULTI-UNIT DWELLING (MUD)
CHARGING PORTS WERE ACTIVATED IN Q7
RELEASED THE RFP FOR THE PUBLIC
ACCESS CHARGING PILOT PROJECT FOR DC FAST CHARGING
AT MOUND AND FULTON STREETS
63 APPLICATIONS RECEIVED FOR AEP OHIO’S
EV CHARGING STATION INCENTIVE PROGRAM
8 LEVEL 2 CHARGING
PORTS WERE INSTALLED AT THREE CITY OF
COLUMBUS SITES 20 NEW WORKPLACE
CHARGING PORTS WERE INSTALLED IN Q7 AT
10 SITES Playbook: Q7 Key Highlights:
MAYOR GINTHER MENTIONED THE PROGRESS MADE TOWARD COLUMBUS ELECTRIFICATION GOALS DURING AN INTERVIEW WITH BLOOMBERG TV, WHICH WAS PICKED UP BY MSN AND
YAHOO FINANCE
PUBLICLY LAUNCHED THE SMART COLUMBUS PLAYBOOK
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
6
238 ARTICLES PUBLISHED
ABOUT SMART COLUMBUS IN Q7
FINALIZED THE RIDE & DRIVE
ROADSHOW BEST PRACTICES
VIDEO
ATTENDED AND PRESENTED AT
EVS31 IN KOBE, JAPAN
PROJECT BUDGET AND SCHEDULE REVIEW The reporting period for financial expenditure data for the City of Columbus was based on invoices received through December 31, 2018. See pages 55-56 for a more detailed analysis.
Activities within the schedule are progressing according to plan. Q7 saw an accelerated effort on Priority 4 with the completion of the Logic Model and Evaluation Plan for Major Consumer Adoption Programs and the launch of the EV Consumer Education Campaign.
See Appendix B for comprehensive timelines.
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
Year 2 Spend Year 2 Commitments Year 2 Total
Year 2 Budget AnalysisYear 2 Spend: $2,252,028 Year 2 Commitments: $1,337,822 Year 2 Total: $3,589,850
Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Playbook Program Management
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
7
YEAR 2 LESSONS LEARNED The Year 2 Lessons Learned repository, shown in Appendix E, details significant findings, recommendations and new insights realized during Years 1 and 2 of the project, and will be amended annually to reflect new findings. The application of the Lessons Learned by the City of Columbus can potentially increase the effectiveness of the Paul G. Allen Philanthropies’ (PGAPh) future capital investments and provide support for EV adoption in cities worldwide. Smart Columbus is using the Lessons Learned tool to identity both successes and/or shortcomings, and detail the resulting possible impacts and next steps. The list details the lesson learned, resulting action, potential impact, and the pertinent references by Priority/Initiative.
A few key lessons learned in Year 2 include:
x Broaden the eligible applicants for the Transportation Service Provider (TSP) Rebate Program beyond traditional taxi companies to include drivers for Transportation Network Companies (TNCs).
x Significant GHG reduction in commuter travel can be achieved by decreasing the amount of Single Occupant Vehicle (SOV) commutes in Columbus. Currently, 83% of the regional population commutes alone. Smart Columbus found that there is a limited supply of alternative and multi-modal transportation options for Columbus residents to travel alternatively to work.
x OEMs have varying approaches and beliefs on how to best market, educate and sell EVs. This manifests itself in their approach to dealer training (i.e. some brands intentionally avoid all conversation about charging, while others embrace it and ensure it is talked about with every customer).
x There is little to no interest from executives to participate in an overnight test drive experience.
x Relying heavily on external funding sources for public charging means KPIs and project schedules are entirely controlled by the funding source.
x Even with the advantages of adding charging infrastructure to projects already programmed for construction, charging installation is still subject to the main project’s construction schedule and delays.
x Incentive programs can, and will (unintentionally or not), compete against one another if the programs are not coordinated and presented in partnership. Smart Columbus’ MUD charging program showed a temporary drop-off in applicants due to the timing/offering of the AEP EV Charging Incentive Program.
x Modifications to existing electrical equipment should be pre-approved by the manufacturer before making any changes to the equipment. Modifying equipment without prior approval leads to a much longer inspection process in order to get UL approval.
x Safety can play a major role in EVSE code and policy development. The draft City of Columbus Fire Code includes a section for EVSE installations. Fires involving EV batteries can take up to 2-4 times as much water to put out, so in the event of a vehicle fire, the Division of Fire needs to be able to quickly and safely de-energize the adjacent charging stations without having to search for a power disconnect.
x Even with the level of planning for this grant program, determining staff demands and making adjustments can take significant amounts of time and effort. Employee attrition, unexpected (but necessary) employee absences and lengthy hiring processes have a noticeable impact on the program.
x Having a clear understanding of available primary grant funds, as well as partner contributions and government funding opportunities within the program timeline, is critical to developing a program plan.
For more details on these and other lessons, see Appendix E – Year 2 Lessons Learned.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
8
MAJOR ITEMS UPCOMING IN Q8 (JAN – MAR 2019) x Finalize the contract between DC Solar and the City of Columbus Recreation and Parks Department,
and work to deploy lighting towers and charging units at city parks. x Continue design plans on the Jackson Pike Co-Generation Wastewater Treatment Plant (WWTP)
project and the O’Shaughnessy Dam improvements project. x AEP Ohio will complete their Advanced Metering Infrastructure (AMI) deployment. x The Columbus Division of Power’s (DOP) AMI RFP submissions are due in February 2019. x DOP will begin the LED conversion of 40 small circuits for the Smart Street Light project. x The City of Columbus will purchase an additional 75 EVs by the end of the program. x Finalize procurements for current private fleet commitments. x Award and implement available TSP vehicle rebate programs. x Monitor commutes on the PULLL app and promote the commute function more actively in the spring. x Launch early learnings and best practices through 2019 for the autonomous shuttle, and publish
standard operating procedures in the Playbook. x Release an RFP for a second autonomous shuttle route. x Present Navigant research to the electrification team and task Program Managers with executing
additional evaluation mechanisms proposed in the Evaluation Plan. x Monitor performance of the Consumer Education Campaign and optimize against performance data. x Advance the preferred EV charging station public art idea(s) from the Columbus College of Art &
Design (CCAD) pitches. x Deploy co-branded decals for AEP chargers. x Integrate Qualtrics survey software into the Ride & Drive Roadshow work flow for 2019, and execute
programmatic changes to the program that were identified in the 2018 reflection process. x Discontinue the extended test drive program area due to limited demand. x Announce the second round of Accelerator Partners. x Rebuild the Smart Columbus website in a new content management system (CMS). x Continue to work with KIA to increase the inventory of the Niro PHEV in the market. x Add six more Electrified Dealers and create the process to assess the success of the overall Electrified
Dealer Program. x Begin conversations with added OEMs and dealers on conducting a group purchase program. x AEP Ohio will continue to process applications for their EV Charging Station Incentive Program. x Perform site visits as Multi-Unit Dwellings (MUDs) complete installations and activate charging stations. x Continue to review and award any additional MUD applicants. x Launch and collect data on the AEP Ohio residential EV charging pilot. x Review proposals and award the Public Access Charging Pilot Project RFP. x Develop a comprehensive workplace charging policy for City of Columbus employees. x Complete the design and construction of the city’s planned 29 Level 2 charging ports. x Develop a fleet and charging handbook for city pool vehicles that charge at multiple locations. x Continue to schedule and create content for the Playbook based off of lessons learned. x Work with Atlas Data to create impact reports and visualizations for the Playbook in 2019. x Attend and speak at CES and the Transportation Research Board (TRB) Annual Meeting in January. x Re-evaluate national media relations approach and goals, based on the 2019 budget.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
9
TABLE OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................................ 1 Project Description and Status ....................................................................................................................... 1 Project Budget and Schedule Review ............................................................................................................ 6 Year 2 Lessons Learned ................................................................................................................................. 7 Major Items Upcoming in Q8 (Jan – Mar 2019) .............................................................................................. 8
TABLE OF CONTENTS ................................................................................................................................. 9
ORGANIZATIONAL STRUCTURE .............................................................................................................. 11
QUARTER IN REVIEW ................................................................................................................................ 12 Priority Overview ........................................................................................................................................... 12
Priority 1 – Decarbonization ..................................................................................................................... 13
Priority 2 – Fleet Electric Vehicle Adoption ............................................................................................... 17
Priority 3 – Transit, Autonomous and Multi-Modal Systems in the City .................................................... 23
Priority 4 – Consumer Electric Vehicle Adoption ...................................................................................... 25
Priority 5 – Charging Infrastructure ........................................................................................................... 41
Playbook ................................................................................................................................................... 48 Contracts and Partner Agreement Status ..................................................................................................... 54 Implementation Plans ................................................................................................................................... 54 Risk Management and Policy Register ......................................................................................................... 54 Budget and Cost Management ..................................................................................................................... 55 Smart City Schedule ..................................................................................................................................... 57 Performance Measurement Plan .................................................................................................................. 57 Year 2 Lessons Learned ............................................................................................................................... 57
ACTIVITY LOGS .......................................................................................................................................... 58 Priority 1 Activity Log .................................................................................................................................... 58 Priority 2 Activity Log .................................................................................................................................... 62 Priority 4 Activity Log .................................................................................................................................... 66 Priority 5 Activity Log .................................................................................................................................... 71 Playbook Activity Log .................................................................................................................................... 79
APPENDICES .............................................................................................................................................. 80 Appendix A – Quarterly Indicators and Metric Targets ................................................................................. 80 Appendix B – Schedule ................................................................................................................................ 94 Appendix C – Risk and Policy Register ........................................................................................................ 99 Appendix D – Polk Data .............................................................................................................................. 104
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
10
Appendix E – Year 2 Lessons Learned
Appendix F – Fleet Assessment Example – Alliance Data
Appendix G – Private Fleet Commitments To Date
Appendix H – Navigant Research – Evaluation Plan Executive Summary
Appendix I – Navigant Research – Evaluation Plan
Appendix J – Navigant Research – Evaluation Spreadsheet
Appendix K – Speaking Engagements
Appendix L – Communications and Publications
Appendix M – CCAD Fall Semester Final Presentations
Appendix N – 2018 Experience Center Test Drive Report
Appendix O – Ride & Drive Roadshow Program Deep Dive 2018
Appendix P – Executive EV Purchases To Date
Appendix Q – 2018 Ignite Action Fund Report
Appendix R – New Owners’ Educational Insert
Appendix S – New Owners’ Brochure
Appendix T – EVIP Window Cling
Appendix U – New Owners’ Postcard
Appendix V – Mound and Fulton Public Access Charging Pilot RFP
Appendix W – Workplace Charging Ports Installed To Date
Appendix X – Consumer Awareness Survey Findings
Appendix Y – 2018 Budget Analysis
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
11
O
RG
AN
IZATIO
NA
L STRU
CTU
RE
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
12
QUARTER IN REVIEW This section will give an overview on items that happened during Q7 for each of the five project priorities, program management, priority implementation and coordination items.
PRIORITY OVERVIEW Progress during Q7 is detailed below for the following priorities: Decarbonization; Fleet Electric Vehicle Adoption; Transit, Autonomous and Multi-Modal Systems in the City; Consumer Electric Vehicle Adoption; and Charging Infrastructure.
Key Highlights: x On October 29th, Bloomberg Philanthropies
announced Columbus as a winning city in the Bloomberg American Cities Climate Challenge, a $70 million dollar program that will accelerate 20 ambitious cities’ efforts to tackle climate change and promote a sustainable future for residents. Through the Climate Challenge, Columbus is accepted into a two-year acceleration program and will be provided powerful new resources and access to cutting-edge support to help meet or beat the city’s near-term carbon reduction goals.
x Columbus plans to use this support for a number of new and existing initiatives and will work with Bloomberg Philanthropies to achieve the following actions by 2020:
o Deploy a workforce development program for energy efficiency auditors and increase the number of homes audited with a focus on the City neighborhoods with the highest rates of energy poverty;
o Accelerate existing and add new financing programs for energy efficiency and renewables for commercial buildings;
o Roll out a multi-modal trip planning app to drive behavioral insights and engagement strategies to encourage mode share; and
o Launch a communications campaign to increase ridership on newly expanded high-frequency transit lines.
“The wellbeing and prosperity of our community is inextricably linked to
solving the climate crisis. This presents a great opportunity to our
generation to innovate. Columbus is no stranger to innovation. By being
named a winning city by Bloomberg, we will be able to boldly move forward with existing and new programs to cut
city emissions through sustainable construction and mobility initiatives.”
– Mayor Andrew J. Ginther
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
13
PRIORITY 1 – DECARBONIZATION Initiative 1.1 – Utility-Scaled Renewables Strategy 1.1.1 – AEP Solar and Wind Generation Key Highlights:
x Nothing to report this quarter.
Next Steps: x Await action from the Public Utilities Commission of Ohio (PUCO) and respond as appropriate.
Strategy 1.1.2 – AEP Research and Development (R&D) to Advance Clean Energy Key Highlights:
x Nothing to report this quarter.
Next Steps: x The research commitment was satisfied with research grants made earlier this year to The Ohio State
University (OSU) and Ohio University. Any future aligned R&D will be reported as appropriate.
Strategy 1.1.3 – AEP Distributed Generation Coordination of New Customer Installation Key Highlights:
x Customers continued to submit interconnection applications for new distributed generation installations. AEP added 73 new distributed energy customers in Q7 and have added 292 to date. They are 97% complete with the goal of 300 new customers by the end of the program.
Next Steps: x Maintain the applications forms and processes to support customers seeking to install new
distributed generation.
Strategy 1.1.4 – Solar Generator Deployment (DC Solar) Key Highlights:
x Ongoing use and exposure from portable solar charging units at Ohio Dominion University (ODU), the Ohio Department of Transportation (ODOT), the Ohio Department of Public Safety (ODPS), Yellow Cab of Columbus, and a unit used for events.
Next Steps: x Finalize the contract between DC Solar and the City of Columbus Recreation and Parks Department,
and work to deploy lighting towers and charging units at city parks.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
14
Strategy 1.1.5 – Columbus Division of Power (DOP) Green Power Key Highlights:
x DOP is continuing to purchase 20% power from green resources.
x DOP met with the city’s energy manager to discuss increasing the EcoSmart Choice participation percentage to achieve a participation goal of 50% by 2020 for city facilities. DOP calculated the 2017 and 2018 year to date costs for the city and estimated the cost deltas for each department if they increased participation by 40% or 50%.
Next Steps: x Move forward with discussions on increasing participation and set a plan for implementation.
Strategy 1.1.6 – City of Columbus Wastewater Treatment Plant, Co-Generation
Key Highlights: x Detailed design plans for the Jackson Pike Co-Generation Wastewater Treatment Plant (WWTP)
project began in October.
Next Steps: x Design plans will be completed in late 2019.
Strategy 1.1.7 – Columbus Division of Power Hydroelectric Improvements Key Highlights:
x The design phase of the O’Shaughnessy Dam improvements project is 50% complete.
x Submitted technical memos and detailed design memos.
x Determined that all major turbine components will be replaced.
Next Steps: x Complete detailed design.
x Consultant to complete plan and specification preparation.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
15
Initiative 1.2 – Grid Modernization and Efficiency Strategy 1.2.1 – AEP Energy Efficiency Key Highlights:
x AEP Ohio is on-track to meet 2018 energy efficiency targets service-territory wide.
x Discussions with the city in support of the American Cities Climate Challenge brought greater awareness of the Community Energy Savers (CES) program as a potential outreach and engagement strategy.
Next Steps: x Continue to offer and promote energy efficiency programs for business and residential customers.
x Ensure neighborhoods participating in the American Cities Climate Challenge are aware of the CES program and benefits so they have the information they need to determine whether to participate.
Strategy 1.2.2 – AEP Smart City Vehicle to Home Research Key Highlights:
x Nothing to report at this time.
Next Steps: x Explore opportunities for a pilot project in 2019.
Strategy 1.2.3 – AEP gridSMART 2.0 Advanced Metering Infrastructure (AMI) Deployment
Key Highlights: x AEP Ohio has installed 468,196 AMI meters in the seven counties that comprise Smart Columbus.
The project is around 89% complete.
Next Steps: x Complete AMI deployment in the first quarter of 2019.
Strategy 1.2.4 – AEP Microgrids and Battery Storage Key Highlights:
x Began discussions with potential participants interested in the microgrid demonstration project.
Next Steps: x Begin and finalize the microgrid demonstration project design in 2019.
Strategy 1.2.5 – AEP Smart Lighting Key Highlights:
x Nothing to report at this time.
Next Steps: x Develop and launch the first smart lighting pilot in 2019.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
16
Strategy 1.2.6 – Columbus Division of Power Grid Modernization (AMI) Key Highlights:
x The Request for Proposal (RFP) for the DOP’s AMI project was advertised in early December. The project will consist of the implementation of an Automated Meter Infrastructure system to provide meter readings from water, sewer and power meters. The project will include the supply and installation of Power Meters, the installation of City Issued Water Meters, and all software required to operate the system and interface with the City of Columbus systems and applications.
Next Steps: x The deadline to submit RFP questions is January 18, 2019. A small committee has been developed
to vet all vendor questions.
x RFP submissions are due in February 2019. A contract is expected to be signed in late 2019.
Strategy 1.2.7 – Columbus Division of Power Street Light Technology Conversion Key Highlights:
x A contract was awarded to HNTB to conduct the implementation plan and design of Phase 1 of the Smart Street Light Project.
x AT&T has committed to a pilot Smart Street Lighting System for DOP.
x DOP purchased $690k in LED luminaires, which will be used to convert existing circuits.
Next Steps: x Begin LED conversion of 40 small circuits in 2019.
x Work with AT&T, Smart Columbus and city departments to determine what features can be attached to smart street lighting infrastructure.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
17
PRIORITY 2 – FLEET ELECTRIC VEHICLE ADOPTION Initiative 2.1 – Public Fleets Key Highlights:
x Smart Columbus has achieved more than 50% of its goal to introduce 265 light-duty EVs and 10 electric buses to public fleets by 2020, with 159 EVs purchased to date. In Q7, the City of Columbus purchased 32 new fleet vehicles, including 26 Ford Fusion Energis, four Nissan Leafs and 2 Chevy Bolts. These vehicles will be delivered in Q8 and are anticipated to be in service no later than Q9.
x An additional eight Level 2 fleet chargers have been installed at three City of Columbus sites in order to support these new fleet vehicles. Inspection for these sites will be completed in early January 2019.
x Smart Columbus is following up with public fleets to document vehicle purchase commitments, vehicle purchase orders, vehicle in-service and vehicle usage as outlined below and in the KPI sections of this report.
PUBLIC FLEET VEHICLE PROGRESS TO DATE
Firm or Municipality Quantity Purchased Additional Expected
City of Columbus 125 (32*) 75
Columbus Regional Airport Authority 2 Will apply for 5 GSE units through the Volkswagen grant
Mid-Ohio Regional Planning Commission 2 0
City of Hilliard 2 0
City of Dublin 5 (1*) 5
Franklin County 11 Additional vehicles pending County approval of more charging
The Ohio State University 5 (2*) 10
City of Westerville 2 0
City of Whitehall 2 0
City of Worthington 0 2 (expected in Q8)
Franklin County Engineer 2 0
Central Ohio Transit Authority 0 10 (expected in 2019)
City of New Albany 1* 0
City of Delaware 0 1* (expected in Q8)
City of Upper Arlington 0 3* (expected in 2019)
TOTAL 159 (36*) 111 (4*) (*) indicates Q7 commitments
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
18
x Continued outreach, education, analysis and technical assistance work with public and private fleets. Staff focused efforts on working with multiple public fleets in one-on-one and small group meetings, as well as assisting in the promotion of a Fleet Electrification Workshop in October and meetings with Pickaway and Fairfield County fleets in November.
Next Steps: x The city will purchase an additional 75 EVs by the end of the program, and charging infrastructure will
continue to be added to support the EVs.
x Continue outreach, education, analysis, and technical assistance work with public fleets throughout the remainder of the performance period.
x Continue working with all partners to facilitate vehicle rebates and incentives, provide administrative tracking and reporting of activities and deliverables, and offer informational resources on lessons learned and best practices.
Strategy 2.1.1 – Training and Technical Assistance Workshops Key Highlights:
x The City of Columbus fleet staff continued to partner with Columbus State Community College (CSCC) on a series of in-depth, technical automotive trainings. CSCC began the three college-level classes on October 21, 2018, and they will run through May 11, 2019. The classes are available at a greatly reduced rate to all Municipal Equipment Maintenance Association-OH members (i.e. other public fleets). Columbus has eight technicians included in the classes. The courses are:
o AUTO2190 - Hybrid Vehicles: Theory and Operation;
o AUTO2391 - Advanced Alternative Fueled Vehicles: Diagnosis and Repair; and
o AUTO2390 - Advanced Hybrid Vehicles: Diagnosis and Repair.
x Hosted a Fleet Electrification Workshop on October 9th at the Experience Center, with 25 attendees in total. The discussion and presentation were focused on the fleet assessment and available procurement options through fleet leasing companies.
x Held a fleet meeting with Pickaway and Fairfield County fleets in November, with 40 attendees in total. This meeting was focused on reviewing available Smart Columbus resources for fleet electrification, including the fleet assessment and support for procurement options.
Next Steps: x Partners will continue to plan additional quarterly technical trainings throughout the grant period.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
19
Initiative 2.2 – Private Fleets Key Highlights:
x 192 private fleet EVs have been committed, with 25 private EVs purchased to date.
x Capabilities Inc., Cardinal Health, ViaQuest and Grange Insurance fleet vehicles launched telematics monitoring for fleet assessment. The purpose is to track vehicles – location, speed, engine load, RPM – to project which EVs would be the best fit for replacement.
x Twenty-five baseline fleet assessments have been completed to date, including the following:
o Denison University o Columbus Zoo and Aquarium o The Columbus Dispatch o Land Grant Brewing Company o Yellow Cab of Columbus o Alliance Data o OhioHealth o MedSpeed o VAT Transportation o AAA Ohio o Cardinal Health o Capabilities Inc. o ViaQuest
o Battelle o Mill Creek Insurance o Litech Lighting o Installed Building Products o WBNS 10 TV o Bexley Beat o Goodwill Columbus o Motorists Insurance Group o Weekley Electric o Palmetto Construction Service o Columbus NEP o Vertiv
An additional 15 fleets are currently in the process of collecting data for fleet assessments. Many of these have historically collected little-to-zero data on vehicle operation, which has caused delays in data collection and assessment. Smart Columbus has given extra attention to these fleets to educate them about the necessary data required for informed fleet transition decisions, which is beginning to help these fleets with their fleet electrification process. See Appendix F for an example of a fleet assessment report.
x Example EV Telematics Study: For those fleets requiring a more in-depth analysis of operation and or economic fit with EV technology, a telematics analysis is offered. Below is an example of a one-for- one replacement of a 2015 Nissan Rogue with a 2018 Nissan LEAF: 15,095 miles/year.
Next Steps:
x Finalize procurements for current fleet commitments.
x Maximize outreach with other membership-based organizations, such as chambers of commerce.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
20
Strategy 2.2.1 – Secure Purchase Pledges Key Highlights:
x Private fleet commitments for EV purchases have been secured from the following in Q7. See Appendix G for all private fleet commitments to date.
PRIVATE FLEET VEHICLE PURCHASE COMMITMENTS IN Q6
Organization Quantity Purchased New Commitments*
Capabilities Inc. 0 10
Vertiv 0 5
Exxcel 0 3
ViaQuest 0 5
Boundless 0 5
Goodwill Columbus 0 5
Motorists Insurance 0 5
Battelle 0 1
Car Dorks Mobile Car Wash 0 1
Soodles Bake Shop 0 2
Litech Lighting 0 5
TOTAL 0 47 *Commitments do not include purchases in Q7 or prior commitments.
Next Steps: x Encourage private fleet electrification pledges through engagement and fleet assessment services.
Strategy 2.2.2 – Network Development Key Highlights:
x Hosted a Fleet Electrification Workshop on October 9th at the Experience Center, with 25 attendees in total. The discussion and presentation were focused on the fleet assessment and available procurement options through fleet leasing companies.
x Held a fleet meeting with Pickaway and Fairfield County fleets in November, with 40 attendees in total. This meeting was focused on reviewing available Smart Columbus resources for fleet electrification, including the fleet assessment and support for procurement options.
x The Columbus Partnership signed a Memorandum of Understanding (MOU) with the Columbus Chamber of Commerce to identify the Chamber’s role in helping identify candidate fleets and opportunities for electrification.
Next Steps: x Work with partners to cultivate new organizational prospects and fleet electrification opportunities.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
21
Initiative 2.3 – Transportation Service Providers (TSPs) Key Highlights:
x The Smart Columbus team continued to work with Yellow Cab of Columbus in the implementation and administration of the $30,000 first round of the TSP Rebate Program. Yellow Cab of Columbus worked with Smart Columbus to purchase 10 Chevy Bolt EVs through the first round of this program.
x The team finalized the content and format for Round 2 of the Smart Columbus TSP Rebate Program. Round 2 is designed to offer rebates to both traditional taxi service providers as well as drivers for Transportation Network Companies (TNCs), such as Uber and Lyft, to spur TSP EV adoption throughout central Ohio. Round 2 of the Rebate Program was approved by City Council and publicly released November 20th. Full details are available online at https://smart.columbus.gov/News/Smart-Columbus-Offering-$90,000-in-Rebates-to-Help-Rideshare-Drivers-Switch-to-Electric-Vehicles/.
Next Steps: x Continue to work with key regional TSPs, including Yellow
Cab of Columbus, the Central Ohio Regional Transit Authority (COTA) and the Mid-Ohio Regional Planning Commission’s (MORPC) ride share program to further EV purchase commitments and deployment of vehicles and charging.
x Award and implement available TSP vehicle rebate programs in Q8 to further catalyze the deployment of EVs in additional TSP fleets throughout the seven-county central Ohio region.
x Continue to work with public agencies, cab companies and TNC drivers to get EV commitments.
x Provide continued EV technician training.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
22
Strategy 2.3.1 – Recruit TSP Partners Key Highlights:
x On December 13th, Smart Columbus partnered with Uber to host an EV Ride & Drive and educational event at Uber’s “Green Light” Center in Columbus. The group promoted the new TSP Rebate Program and the event to all registered Uber drivers in the seven-county central Ohio region. More than 80 drivers registered for the event, which took place from 11 am – 3 pm and featured staff tabling and educating drivers on the rebate program as well as assisting drivers with test drives of vehicles. Sixteen unique drivers tested out both the Chevy Bolt and Nissan Leaf, with many more expressing interest in purchasing EVs. Many drivers had detailed discussions with staff on the application process and were given auto dealer contacts for the region.
x COTA continues its plans to electrify one of its major bus routes. They applied and were awarded $1,013,253 in Volkswagen funds for 30% of the cost to replace buses with electric powered buses. COTA plans to purchase up to 10 dedicated electric buses in 2019 to be in service by 2020.
Next Steps: x Assess the TSP/multi-modal landscape to better understand the needs of the community, and use
that to determine which TSPs to recruit in 2019.
x Continue to work with public agencies, cab companies and TNC drivers to secure EV commitments. x COTA will finalize grant award contracting and place a purchase order for the electric buses.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
23
PRIORITY 3 – TRANSIT, AUTONOMOUS AND MULTI-MODAL SYSTEMS IN THE CITY Key Highlights:
x Smart Columbus launched an integration within the PULLL app, sponsored by Pelotonia. Through the sponsorship, PULLL app users can log commutes taken by bike or walking. For each mile traveled, Smart Columbus makes a small donation to Pelotonia, a regional non-profit dedicated to cancer research, creating a new incentive to commute in a carbon-free way, rather than by car. A total of 915 walking and biking commutes were logged within the PULLL app, totaling 3,996 miles. The average participant has commuted a total of 53 miles by bike or walking. To date, $858 of Smart Columbus’ $5,000 donation has been unlocked.
Next Steps: x Monitor commutes performed during the winter months and promote the commute function more
actively as the weather gets warmer.
6 Connected Electric Autonomous Vehicles (CEAVs) Key Highlights:
x On December 10th, Smart Columbus and DriveOhio launched Smart Circuit, Ohio’s first self-driving shuttle. Smart Circuit is open to the public and will run 6 am to 10 pm daily. Shuttles pick up and drop off passengers at the Center of Science and Industry (COSI), the National Veterans Memorial and Museum, Bicentennial Park and the Smart Columbus Experience Center. More than 170 people rode the shuttles on December 10th, their first day in operation, and 2,469 people rode through the end of December. The shuttles offer residents and visitors a hands-on educational experience with self-driving technology. Engineers, researchers and policymakers from Smart Columbus, DriveOhio and OSU will use the demonstration to inform future deployments of self-driving vehicle technology in Ohio, including a route planned for a Columbus neighborhood, funded by the U.S. Department of Transportation Smart City Challenge grant.
Next Steps: x Launch early learnings and best practices through 2019.
x Publish standard operating procedures in the Playbook.
x Release an RFP for a second shuttle route in Q8.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
24
Electric Bikes
Key Highlights: x Lyft purchased CoGo Bike Share from Motivate.
x Lyft put in place a manager to oversee local bike share operations.
Next Steps: x Columbus Division of Recreation and Parks will meet with Lyft in January 2019 to discuss
equipment and technology and the use of PGAPh funds for the new bikes.
City Bike Infrastructure Key Highlights:
x The City of Columbus added 4.58 miles of bike infrastructure in Q7:
o 0.07 miles of shared-use path, and
o 4.51 miles of shared lane (sharrow pavement markings and signs).
Next Steps: x Continue construction and planning of bike infrastructure.
Expanded Shared Mobility Key Highlights:
x Proactive outreach to assist new companies in launching bike and scooters service within the city.
Next Steps: x Produce an Ecosystem Status Report.
x Coach and support the expansion of current service providers in the market.
x Reach out to prospective companies for one-on-one conversations to discuss the Columbus market, and coach them on the process of obtaining a permit to operate in Columbus.
x Support the launch plans of new services, as needed.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
25
PRIORITY 4 – CONSUMER ELECTRIC VEHICLE ADOPTION Key Highlights:
x Applied the feedback provided by Forth, where applicable.
Initiative 4.1 – Research and Assessment Strategy 4.1.1 – Consumer Research Key Highlights:
x Worked with Navigant to complete a Logic Model and Evaluation Plan for major consumer adoption programs. The causal model for EV adoption and a sample of the logic model are provided to the right. See Appendices H, I and J for the full Evaluation Plan, Executive Summary and Evaluation Spreadsheet.
Next Steps: x Alex Slaymaker will present the
research to the Electrification team in January 2019.
x Program Managers will be tasked with executing additional evaluation mechanisms proposed in the Evaluation Plan to measure the impact and success of programs in 2019 and 2020.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
26
Initiative 4.2 – Increase Consumer Awareness for EVs Key Highlights:
x Smart Columbus and Fahlgren Mortine shot, produced and launched the EV Consumer Education Campaign across TV, streaming TV apps, digital, social media and Waze.
Next Steps: x Monitor performance of the EV Consumer Education Campaign and optimize it against performance
data.
Strategy 4.2.1 – Community Events
Key Highlights: x On October 18th, more than 100 people attended the “YWCA
Smart Women, Smart Columbus” event held in the Experience Center. The panel of speakers included Jordan Davis, Brandi Braun, Laura Koprowski of COTA and Aslyne Rodriguez of EmpowerBus.
x Brought four EVs (two BEVs and two PHEVs) to the “OSU Mobility Week” starting October 15th for a “look & see” event to educate students, staff and faculty on the benefits of driving electric and how to plug in an EV.
x In early 2018, Mayor Ginther challenged middle schoolers across Columbus to think big about the future of transportation and their role in the future of our city. The Smart Columbus Middle School Design Challenge kicked off in Autumn 2018, which included student teams from Metro Early College Middle School, seven Columbus Public Middle Schools, and Linden McKinley High School. The design challenge culminated in original student made pitches and prototypes ranging from 3D models to smart phone applications. Watch the news coverage here: https://www.youtube.com/watch?v=pmqNURJV_4g
x See Appendix K for a full list of community events.
Next Steps: x Final judging for the Middle School Design Challenge will take
place January 22nd and winners will be recognized at Columbus’ “State of the STEM” on January 29th. Winning presentations will be displayed at the Experience Center as a temporary exhibit/showcase.
x On January 14th, Smart Columbus will host an event with the Drive Electric Columbus group.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
27
Strategy 4.2.2 – Local Media Relations
Key Highlights: x Industry trade publication Smart Cities Dive named
Columbus its City of the Year, citing Columbus’ progress toward its electrification goals as a major reason for the recognition. Click here to view the article.
x Columbus Mayor Andrew J. Ginther and Columbus 2020 CEO Kenny McDonald participated in a media tour in New York City, with Columbus’ smart city initiative serving as a priority talking point. Mayor Ginther mentioned the progress made toward Columbus electrification goals during an interview with Bloomberg TV, which was picked up by MSN and Yahoo Finance. Click here to view the interview.
x Issued a news release announcing the next phase of the TSP program, which was covered by The Columbus Dispatch, Columbus Business First and Smart Cities World.
x Issued a news release announcing the launch of the Smart Columbus Playbook, which was covered by Government Technology and Smart Cities Dive.
x Invited local media to ride the Smart Circuit autonomous shuttle. The launch was covered extensively by local media.
x Yellow Cab of Columbus CEO Morgan Kauffman was profiled in a front-page feature in Columbus Business First that mentioned his collaboration with Smart Columbus and investment in EVs. Click here to view the article.
x For a complete summary of Smart Columbus media placements, see Appendix L.
Next Steps: x Continue a steady drumbeat of news and announcements.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
28
Strategy 4.2.3 – Social Media
Key Highlights: x @SmartCbus gained 1,377 new social media followers during the quarter.
x In December, Smart Columbus introduced targeted social media posts from the Consumer Education Campaign into its channels (see Substrategy 4.3.3.2).
Next Steps: x Optimize the Consumer Education Campaign posts based on the campaign’s performance.
Strategy 4.2.4 – Electric Asset Branding Key Highlights:
x Launched the Smart Circuit autonomous shuttles in December with co-branded May Mobility and Smart Columbus logos.
x Produced 200 “ElEVating Our Community” window clings to be placed in private fleet EVs.
x AEP Ohio and Smart Columbus agreed upon co-branding methodology for incentivized charging stations installed in the region. See the photo to the right for an example of the charging station sign artwork.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
29
x Kicked off the partnership with the Columbus College Art & Design (CCAD) for a Fall Semester EV charging station public art design challenge on October 22nd. Smart Columbus hosted the advertising/graphic design students and faculty at the Experience Center.
x Members of the consumer adoption/charging teams presented to the Columbus Art Commission about the CCAD EV charging station design project for preliminary approval on October 23rd.
x On December 12th, students from CCAD presented final concept designs for public art installations for EV charging infrastructure in Downtown Columbus. A total of nine teams presented broader Smart Columbus brand campaign concepts and specific ideas for bringing attention to EV charging stations. Ideas included charging station wraps, physical and digital advertisements, mobile applications, social art installations, charging hubs, education materials and even a tow truck service. A few of the concepts are included below. See Appendix M – CCAD Fall Semester Final Presentations for the full collection of student presentations.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
30
Next Steps: x Pursue the team’s favorite EV charging station public art idea from the CCAD pitches.
x Deploy the co-branded decals for AEP Ohio charging stations.
x Continue distributing the EV owner and private fleet decals.
Strategy 4.2.5 – Smart Columbus Experience Center Key Highlights:
x In November, Alex Slaymaker expanded her role as a Smart Mobility Adoption Manager, focusing on the public components of the Experience Center, workplace adoption programs and research. She will now manage the Experience Center Ambassadors and the activities related to maintaining and improving the exhibit experience in the public space.
x On October 3rd, the Lyft “Ditch Your Car” kickoff event was held in the Experience Center. The wrap up event was also held at the Experience Center on November 6th.
x On October 17th, Smart Columbus hosted OSU’s new Research & Innovation Series at the Experience Center. The theme of the talk was Data & Smart Columbus, and the program featured OSU faculty.
x On November 7th and 8th, Brandi Braun and Jordan Davis spoke to Center for Automotive Research-Automotive Communities Partnerships group who toured the Experience Center and participated in test drives.
x On November 14th, Mark Patton spoke at the Downtown Residents Association meeting, which was held in the Experience Center and had 65 attendees.
x On December 3rd and 4th, Smart Columbus hosted five Partner Preview events at the Experience Center. More than 80 Smart Columbus community partners attended and had the opportunity to:
o Preview the Smart Circuit self-driving shuttle route;
o Understand the learning objectives of this educational deployment of self-driving technology;
o Learn how the technology works — its current capabilities and its future possibilities;
o Have questions answered, and feel equipped to answer questions from their constituents, partners and stakeholders; and
o Experience the technology firsthand by taking a ride aboard Smart Circuit.
Next Steps: x Host the Tesla owner group holiday party in January, which will include around 50 Tesla owners.
x Host the AT&T/Ohio Foundation of Independent Colleges Scholarship Reception in January.
x Host an event with Drive Electric Columbus on January 14th.
x Host the Ohio Chapter of the International Women’s Forum.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
31
Initiative 4.3 – Drive Consumer Consideration for EVs Strategy 4.3.1 – Test Drives Substrategy 4.3.1.1 – Test Drives at the Smart Columbus Experience Center Key Highlights:
x Completed over 200 test drives at the Experience Center since program launched in July 2018. For a deep dive into results from this program, see Appendix N.
Next Steps: x Continue to streamline processes and enhance practices to ensure efficient vehicle management
and high-quality test drive experiences in 2019.
Substrategy 4.3.1.2 – Ride & Drive Roadshow Key Highlights:
x Completed 6,837 test drives at 59 events in 2018, with a dealership opt-in rate of 13.6%. See Appendix O for a detailed 2018 final report, complete with best practices and lessons learned.
Click to view the Ride & Drive Roadshow video!
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
32
Next Steps: x Share the Ride & Drive Roadshow program learnings
through videos, reports, interviews and program assets on the Playbook.
x Strategize with OSU to ensure a seamless integration of the Qualtrics survey platform into our work flow for 2019. Also, discuss the OSU research team’s plans for data analysis and publication.
x Execute programmatic changes identified in the 2018 reflection process and brainstorm how to offer a large number of high-quality events to early adopters.
Substrategy 4.3.1.3 – Extended Test Drives for Executives Key Highlights:
x Due to the Ride & Drive Roadshow and Experience Center test drive opportunities, there has been no interest in extended test drives, despite pushing the offering through Mobility Ambassadors and other channels. We have accepted the recommendation to conclude this effort after 2018.
x Executive EV adoption grew from 30 to 36 during Q7, and four additional executives have committed to purchase. See Appendix P – Executive EV Purchases To Date for the full list.
COMPANY NAME TITLE VEHICLE PURCHASED
City of Bexley Benjamin Kessler Mayor Chevy Bolt
Wagenbrenner Development Mark Wagenbrenner Owner Tesla S
KPMG LLP Matt Kramer Managing Partner Tesla
Pelotonia Doug Ulman CEO Chevy Volt
Yellow Cab of Columbus Morgan Kauffman CEO Tesla S
AEP Mark McCullough Executive VP, Generation BMW i3
Next Steps: x Discontinue the extended test drive program due to limited demand.
x Continue to apply peer pressure in the Columbus Partnership Boardroom with 52 new partners.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
33
Strategy 4.3.2 – Workplace Electric Vehicle Adoption Campaign Substrategy 4.3.2.1 – Accelerator Partners Program Key Highlights:
x 38 Mobility Ambassadors in the Acceleration Partner Program continued to educate their associates about EVs by sharing EV-related content on intranet channels and e-newsletters. Partners also sent associates to the Experience Center for tours and test drives.
x On October 24th, 29 of the senior leaders involved in the program convened for the final board meeting of the year. Smart Columbus highlighted program updates and partners who were innovative in introducing drive less and drive electric initiatives to their associates. Alex Fischer, President and CEO of the Columbus Partnership, and Mark Patton, Vice President of Smart Cities for the Columbus Partnership, presented insight on the long-term sustainability of Smart Columbus initiatives and their work with Deloitte consultants to find pathways to future success.
o Kevin Myers of Donatos discussed how the company is using the Smart Columbus Operating System to connect people in need with support services at the Reeb Avenue Center.
o Sherry Hubbard of AEP Ohio shared information about the company’s EV charging program available to workplaces.
o Robb Corron from Alliance Data discussed highlights from its Ignite Action Fund award program that incentivized 15 associates in Columbus to buy EVs within three months.
o Allegra Wiesler and Terri Meldrum from OhioHealth gave insight on their approach to understanding their associates’ commute patterns using Columbus Collaboratory technology and piloting programs to reduce their single occupancy vehicle commute rate.
x Signed an MOU with the Columbus Chamber of Commerce to assist in recruiting medium and small
businesses to join the Accelerator Partners Program.
Next Steps: x Announce the second round of Accelerator Partners.
x Plan how to strategically integrate the Consumer Adoption Campaign into the Acceleration Partner Program.
x Continue to direct partners and associates to the Experience Center for test drives and EV education.
Mobility Ambassador meeting at CoverMyMeds Acceleration Partners senior leaders meeting at Huntington Gateway Center
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
34
Substrategy 4.3.2.2 – Workplace Campaigns (Ignite Action Fund) Key Highlights:
x Awarded funding to AEP / AEP Ohio for 15 $2,000 (pre-tax) EV purchase rebates in Q4. All 15 rebates were awarded in less than 31 days.
x The Columbus Zoo and Aquarium has awarded four $1,000 (pre-tax) purchase rebates and has funding to award four more rebates by March 2019.
x Alliance Data Services also awarded 15 $2,000 (post-tax) rebates with support from the Ignite Action Fund.
x See Appendix Q for the 2018 Ignite Action Fund Report.
Next Steps: x Continue to award funding through the
Ignite Action Fund for EV purchase rebates on a rolling basis to Acceleration Partners.
x Share Playbook stories on how to design and launch a successful employer EV purchase rebate program.
Strategy 4.3.3 – Consumer Focused Education Campaign Substrategy 4.3.3.1 – Website Key Highlights:
x Smart Columbus updated the Drive Electric section of the smart.columbus.gov website to look and feel like the EV Consumer Adoption Campaign and to help leverage campaign video assets. Go to https://smart.columbus.gov/get-involved/drive-electric/ to view the updates.
x 16,221 people from within the Columbus region visited the Smart Columbus website during Q7.
Next Steps: x Given significant challenges with building, maintaining and updating the Smart Columbus website in
the Ektron content management system (CMS), the team has decided to rebuild the site in a new CMS. The rebuild will kick off in January 2019.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
35
Substrategy 4.3.3.2 – Digital Education Key Highlights:
x Smart Columbus and Fahlgren Mortine conducted multiple video shoots to capture content for the EV Consumer Education Campaign:
o B-roll shoot: A three-day shoot to capture photos and videos of Columbus residents driving BEVs and PHEVs through various areas of town. The shoot included suburban and downtown locations, and captured footage of the Mitsubishi Outlander, Volvo XC60, Chrysler Pacifica, Mercedes GLE, Nissan LEAF, BMW i3, Honda Clarity, Ford Fusion Energi and Toyota Prius Prime.
o Testimonials: Interviewed current EV owners
� Al – Tesla Model 3
� Lori – Mitsubishi Outlander
� Dr. Michael Drake (President, OSU) – Ford Fusion Energi
� Erin – Nissan Leaf
� Andrew and Maria – Chrysler Pacifica
x The production team edited the content into several videos that highlighted key benefits of EV ownership:
o “Driving REVolution”: Why drive EVs � 30 second � 60 second testimonial � 9-minute testimonial
o “Budget ReliEVer”: Affordability and incentives
� 15 second � 60 second testimonial
o “Go Everywhere”: Charging accessibility and range
� 15 second � 60 second testimonial
o “Even Faster”: Fun to drive � 15 second � 60 second testimonial
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
36
x The EV adoption campaign produced the following outcomes from December 1 – 31st:
o Generated 1.65 million impressions;
o Drove 4,342 visitors to the website; and
o Generated 9 dealer leads, with an additional 11 leads coming through the site organically.
Next Steps: x Create a 15-second spot on the fuel and maintenance cost
benefits of EVs, which will replace the tax incentive spot in January 2019. Tax messaging will be used in December 2018 and March/April 2019 when consumers are thinking about Tax Day, and a more evergreen cost saving message will be used the remainder of the year.
x Monitor the campaign’s performance and optimize the banner rotation and target profiles based on the performance.
Substrategy 4.3.3.3 – B2B Marketing
Key Highlights: x Due to budget constraints, the team has decided not to proceed
with this initiative.
Next Steps: x Due to budget constraints, the team has decided not to proceed
with this initiative.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
37
Strategy 4.3.4 – EV Loyalty Program
Key Highlights: x Finalized the design for the educational inserts in the EV new owners’ gifts, produced 1,000 gifts
and stuffed the bags with the materials. The new owners’ gifts include:
o Smart Columbus tote bag
o Smart Columbus blanket
o Smart Columbus water bottle
o Educational inserts (see Appendix R)
� New owners’ brochure (see Appendix S)
� EVIP window cling (see Appendix T)
� Packet of six discounts and gift cards to local attractions and restaurants that offer EV charging
� Information on KyteWorks (AEP’s home charging installation program)
� Information on IGS’s home charging installation program
� Information on the City of Columbus’ home charging installation program
x 144 new owners’ gifts were distributed in Q7. 136 of those were distributed by dealers and the remaining were distributed at the Experience Center.
x 250 postcards were given to Tesla, as Tesla is unable to distribute the gifts at their location. The postcards refer new car buyers to come to the Smart Columbus Experience Center to pick up their gift. See Appendix U for the postcard.
x Worked with local dealers to email 2018 EV purchasers to have them come to the dealership or Smart Columbus Experience Center to pick up their gifts.
Next Steps: x Continue to replenish owners’ gift supplies with dealers through 2019.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
38
Initiative 4.4 – Improving Consumer Sales Experience of EVs Key Highlights:
x As of December, there were 269 EVs in 23 different models for sale from 41 dealerships in central Ohio. This represents an increase from 250 EVs in September 2018 and 79 in December 2017.
x Activated three more Smart Columbus Electrified Dealers in Q7, for a total of 14 to date.
x During Q7, the Tesla Model 3 saw an exponential growth in sales in the central Ohio market.
Strategy 4.4.1 – Lead Management and Sales Support Key Highlights:
x Started the development of an EV nurturing email template.
x All 14 Smart Columbus Electrified Dealers have been provided access to the online lead management tool created by Fahlgren Mortine.
Next Steps: x Finalize the email template.
x Organize the email lists.
x Develop content for the email blasts and send January, February and March emails to EV prospects.
x Continue to provide lead tool access to new Electrified Dealers, and continue deliver leads on the platform to Electrified Dealers.
Strategy 4.4.2 – Dealer Preparedness and EV Readiness Substrategy 4.4.2.1 – Dealer and Original Equipment Manufacturers (OEM) Engagement Key Highlights:
x Attended the LA Auto Show on November 30th to connect with multiple OEM representatives about the Smart Columbus program.
x Trained 14 Smart Columbus Electrified Dealers to date.
x Engaged KIA motors and they committed to increase the amount of their inventory of the Niro PHEV to the central Ohio market.
x Discovered that specific OEMs like Hyundai, Volkswagen and Volvo will be unable to bring inventory to the market within grant period.
Next Steps: x Build the process to assess the success of this program.
x Continue to work with KIA to increase the inventory of the Niro PHEV in the market.
x Change the strategy with Hyundai, Volkswagen, Volvo and other brands who do not have much inventory in the market.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
39
Substrategy 4.4.2.2 – Dealer Certification Key Highlights:
x Delivered 136 EV owners’ gifts to dealers and delivered 13 Smart Columbus Electrified Dealer plaques, which are now on display in dealer showrooms.
x Added three new dealerships to the Electrified Dealer network:
o Honda Marysville, offering the Honda Clarity;
o Lindsay Honda, offering the Honda Clarity; and
o Germain Nissan, offering the Nissan LEAF.
Next Steps: x Add six more Electrified Dealers in Quarter 8
(January – March 2019).
x Add Jaguar Land Rover and Audi brands to the Electrified Dealer group.
x Provide a winning gift and public recognition to the top selling Electrified Dealer.
Substrategy 4.4.2.3 – Smart Columbus Dealership Certification EV Sales Training Key Highlights:
x Conducted three EV Sales Trainings with the newly certified dealers.
x Developed a new survey that assesses the increased knowledge of the sales staff from the training.
Next Steps: x Create the process to assess the success of the
overall Electrified Dealer Program.
x Increase the robustness and depth of the program to increase demand.
x Create more content for the trainings that can add value to the dealerships.
x Increase the promotion of the program to consumers.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
40
Strategy 4.4.3 – Group Purchase Programs Key Highlights:
x Lindsay Honda and Buckeye Honda both launched a $2,000 incentive on the Honda Clarity, facilitated by Smart Columbus.
x Continued to help AEP and Nissan market their $3,000 incentive.
x Created a Smart Columbus Nissan LEAF incentive, where all seven-county region residents can take advantage of the incentive.
x Launched incentive programs at AEP and the Columbus Zoo and Aquarium, which has led to 20 EV purchases.
Next Steps: x Begin conversations with added OEMs on conducting a Smart Columbus group purchase program.
x Begin conversations with added dealers on conducting a Smart Columbus group purchase program.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
41
PRIORITY 5 – CHARGING INFRASTRUCTURE Key Highlights:
x From program launch through December 31, 2018, 63 applications have been received for the AEP Ohio EV Charging Station Incentive Program, representing 165 Level 2 ports at workplace, public and multi-family charging sites and nine DC Fast Charging ports.
x Twelve charging ports were activated as of the end of December, meaning they are available to charge and communicate charging data. Six ports were available for public charging, four were designated for workplace charging and two were designated for multi-family charging.
Next Steps: x AEP Ohio will continue to process applications for Waves 2 and 3 on a first-come, first-serve basis.
x Wave 1 applicants have been made aware of the opportunity to combine the Smart Columbus and AEP incentives when applicable. Many applicants from Wave 1 will be taking advantage of this and several developers in Wave 2 are interested in taking advantage of this opportunity as well.
x Continue working on charging data collection, analysis and dissemination through the Operating System.
The Columbus Foundation activated the first EV charging station from the AEP Ohio EV Charging Station Incentive Program.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
42
Initiative 5.1 – Residential Charging Strategy 5.1.1 – Develop Multi-Unit Dwelling (MUD) Infrastructure Plan
Key Highlights: x Continued to work with Year 1 developers to ensure projects are on-track for completion and to work
with Year 2 developers to get contracts signed. 28 charging ports were activated in Q7 and an additional 20 are expected to be activated in Q8. Successful projects from the first round of Smart Columbus MUD funding include:
PROJECTS AWARDED IN ROUND 1
Developer Entity Name Site Address # of EV Spaces
Anticipated Date of
Activation
SP+ Neil Avenue Garage (NWD Investments)
300 Neil Avenue Columbus, OH 43215 4 Activated
12/28/2018
SP+ John McConnell Garage (NWD Investments)
355 John McConnell Blvd Columbus, OH 43215 4 Activated
12/28/2018
SP+ Grandview Yard North (NWD Investments)
1125 Rail Street Grandview Heights, OH 43212 4 Activated
12/28/2018
SP+ Chestnut Street Garage (NWD Investments)
44 E. Chestnut Street Columbus, OH 43215 4 Activated
12/28/2018
SP+ Arena Crossing Garage (NWD Investments)
425 N. Front Street Columbus, OH 43215 4 Activated
12/28/2018
Champion Sunbury Pointe Endeavors, LLC 2183 Rushmore Lane Sunbury, OH 43074 6 3/31/2019
Champion Oak Creek Apartments/LLC 9000 Oak Village Blvd Lewis Center, OH 43035 6 2/28/2019
Casto Riverside Sunshine LLC 260 McDowell Street Columbus, OH 43215 4 Activated
11/20/2018
NEP Liberty Street 250 Liberty Street Columbus, OH 43215 4 3/31/2019
Kaufman Gravity Project, LLC 500 W. Broad Street Columbus, OH 43215 4 Activated
12/19/2018
Kaufman Polaris 801 Polaris Parkway Columbus, OH 43230 4 1/31/2019
TOTAL 48
PROJECTS AWARDED IN ROUND 2
Developer Entity Name Site Address # of EV Spaces
Anticipated Date of Contract
Completion
NEP Preserve Crossing 6400 Preserve Crossing Blvd. Columbus, OH 43230 4 1/31/2019
NEP Market Street 7079 Market Street New Albany, OH 43054 4 1/31/2019
NEP Waldon Street 700 Waldron Street Columbus, OH 43215 4 1/31/2019
Pizzuti Smith Tandy 3443 Park Street Grove City, OH 43123 4 1/31/2019
TOTAL 16
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
43
x CASTO’s two MUD/public dual-port chargers at the new River and Rich mixed-use development were activated on November 1st. The chargers are operational and usage data is being recorded. This site is unique in that the chargers can be used both from the parking garage (MUD) and the parallel parking adjacent to the garage (public). These chargers will currently remain free of charge as an amenity to both the residents and customers of the future retail businesses in the adjacent building. In addition, 12 of the apartment units with attached private garages in this development have been made EV-ready with wiring for Level 2 charging up to 40 amps for NEMA 14-50 plugs.
x Several SP+ projects were installed and activated, with site inspections taking place in late December.
x Kaufman’s MUD Gravity project is installed and activated. The site inspection will take place in January 2019. Kaufman’s Polaris site will be activated by the end of January 2019.
x The building of the Champion developments have been delayed, which in turn have delayed the charger installations at Sunbury Point Endeavors and Oak Creek Apartments. These are now expected to be installed in February and March 2019.
x The NEP Liberty Street installations have been delayed and are now expected to be installed in March 2019 due to charging vendor changes and coordination with the AEP Ohio EV Charging Incentive Program.
Next Steps: x Ensure that Champion Companies and NEP wrap up installations at their MUD sites.
x Perform site visits as MUDs complete their installations and activate charging stations.
x Clean Fuels Ohio (CFO) will submit rebate reimbursements to the City for completed MUD projects.
x Complete contracting with NEP and Pizzuti on Round 2 applications.
x Continue to review and award any additional MUD applicants.
Strategy 5.1.2 – Residential Charging Research and Assessment Key Highlights:
x AEP Ohio is working on a small residential EV charging pilot to be launched in early 2019.
Next Steps: x Launch and collect data on the AEP Ohio residential EV charging pilot.
x Determine whether to expand the AEP Ohio pilot.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
44
Initiative 5.2 – Public Access Charging Key Highlights:
x The RFP for the Public Access Charging Pilot Project for DC Fast Charging at Mound and Fulton Streets was released on November 14th, with submissions due on December 17th. Review of the proposals is underway and a notice to proceed is expected by Spring 2019. See Appendix V for the RFP and Addendums.
x Developed one-pagers about MUD and public charging, which included information about the rebates available through AEP Ohio’s EV Charging Incentive Program. MORPC sent the public charging one-pager to 125 of its members in an effort to make public entities aware of the availability of this funding. The Urban Land Institute also sent the one-pagers to its local membership in an attempt to garner support and educate private entities about the AEP Ohio EV Charging Incentive Program.
x Kicked off the partnership with the CCAD Fall Semester EV charging station public art design challenge. See Strategy 4.2.4 for more information or Appendix M for all the student presentations.
x Activated six ports for public charging through the AEP Ohio EV Charging Station Incentive Program.
Next Steps: x The selection committee will complete a review of proposals and choose the awardee for the Public
Access Charging Pilot Project RFP. The City of Columbus will develop a contract with the awardee once selected.
x Smart Columbus will continue providing support to both public and private entities interested in the AEP Ohio EV Charging Incentive Program.
x Members of the consumer adoption and charging teams will reconvene in early 2019 to choose which CCAD public art installation designs will be developed into final products.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
45
Initiative 5.3 – Workplace Charging Key Highlights:
x Ten new workplace charging sites with a total of 20 charging ports were added in Q7, as detailed in the table below. See Appendix W – Workplace Charging Ports Installed To Date for the full list.
WORKPLACE CHARGING PORTS ADDED IN Q7
Organization Number and Type of Charging Ports
Columbus Zoo and Aquarium 2 – Level 2
Columbus Foundation 2 – Level 2
John Glenn International Airport 2 – Level 2
Capitol Square LTD (3 sites) 6 – Level 2
Denison University (2 sites) 4 – Level 2
Donatos 2 – Level 2
Grange Insurance 2 – Level 2
TOTAL 20 – Level 2
x 225 charging ports have been installed at 35 workplace sites to date, with an additional 7 sites committed to date.
x Hosted an EV Charging Roundtable on November 28th with 30 attendees. Presentations were shared by AEP Ohio and the Electrification Coalition, highlighting the AEP Ohio EV Charging Incentive Program and aspects of workplace charging for consideration. The team also shared success stories from local organizations who have deployed workplace charging, including their process and experience. Attendees who had not yet applied to the AEP Ohio funding opportunity were engaged further to identify their workplace charging opportunities and apply for funding.
x Supported 13 workplace charging applications through the AEP Ohio EV Charging Incentive Program.
Next Steps: x Support additional workplace charging sites to apply to AEP Ohio incentive funding.
x Continue tracking workplace charging deployments as they become operational.
x AEP Ohio to process and award incentives for workplace charging.
x Develop a comprehensive workplace charging policy for City of Columbus employees. Coordinate this policy with the fleet charging policies that are in place.
x Assist workplaces with implementing workplace charging policies, as well as employee outreach and engagement, to complement their EVSE.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
46
Initiative 5.4 – Fleet Charging Key Highlights:
x The City of Columbus has installed 102 fleet charging ports to date. Overall, 175 fleet charging ports have been installed to date, including chargers at the Columbus Regional Airport Authority (CRAA), MORPC, OSU, City of Dublin, Franklin County and Yellow Cab of Columbus. Appendix A – Quarterly Indicators and Metric Targets details additional public fleets who have purchased or activated charging within Q7.
x On November 15th, after UL and City of Columbus inspection approval, the 50 Level 2 fleet EV chargers at the 141 N. Front Street garage were activated and the assigned Nissan LEAF fleet EVs were deployed.
x An additional eight Level 2 fleet chargers were installed at three City of Columbus sites. Inspection for these sites will be completed in early January 2019.
o City of Columbus Refuse Facility, 4262 Morse Road – 2 charging ports;
o City of Columbus Fleet Management, 4211 Groves Road – 2 charging ports; and
o City of Columbus Refuse Collection, 2100 Alum Creek Drive – 4 charging ports.
x A round of 29 Level 2 ports at five City of Columbus sites went through the preliminary planning process. Fifteen of the 29 ports may potentially be available for use as workplace chargers for city employees. Design and funding applications are currently in development.
o City of Columbus Jerry Hammond Center, 1111 East Broad Street – 6 charging ports;
o City of Columbus Department of Public Safety, 724 Woodrow Avenue – 3 charging ports;
o City of Columbus Division of Parking, 2700 Impound Lot Drive – 4 charging ports;
o City of Columbus Department of Public Safety, 2700 Impound Lot Drive – 4 charging ports;
o City of Columbus Pool Site, 423 Short Street – 6 charging ports; and
o City of Columbus Division of Design and Construction, 1800 East 17th Avenue – 6 charging ports.
Next Steps: x Complete the design and construction of the planned 29 Level 2 charging ports.
x Identify actions for reducing utility costs at fleet charging sites.
x Develop a fleet and charging handbook for city pool vehicles that charge at multiple locations.
x Scope the remaining charging needs based on fleet vehicle purchases. Assuming a one port per vehicle model, there will be another 69 Level 2 ports to be installed.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
47
Initiative 5.5 – Building and Zoning Changes to Support EV Charging Key Highlights:
x The Smart Columbus charging work group coordinated a draft City Fire Code policy with the AEP Ohio Charging Incentive Program to provide site hosts the option to meet the draft code prior to planned legislation in Spring 2019.
Next Steps: x Compile the remainder of the zoning changes for EV readiness and right-to-charge policies, and
provide the changes to the City code writer for drafting.
x Begin discussions with building, home owner’s and condominium associations in order to gain feedback for EV policy development.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
48
PLAYBOOK Content Generation Content Development and Management
Key Highlights: x Publicly launched the Smart Columbus Playbook on November 5th, and held a webinar to introduce
the Playbook on November 7th. The webinar attracted 100 registrants and 45 attendees.
x Met with internal partners, Atlas Data Policy, the Columbus Police Department, Data-Smart Cities Solutions and the Electrification Coalition about upcoming content for the Playbook.
x Launched the Smart Columbus Playbook monthly newsletter in December, featuring Playbook articles and insights. It was sent to an organic list of contacts being developed. By Q9, the team will have a better idea of which regions/organizations are most interested in the content, and which content areas are the most popular.
Next Steps: x Continue to schedule and create content for the Playbook based off of lessons learned and Smart
Columbus programs.
Playbook Delivery Platform – Website
Key Highlights: x Launched the Playbook on the Smart Columbus website on November 5th.
x Published 80 content assets and 31 learning tools to the Playbook.
Next Steps: x Given significant challenges with building, maintaining and updating the Smart Columbus website in
the Ektron CMS, the team has decided to rebuild the site in a new CMS. The rebuild will kick off in January 2019.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
49
Playbook Content: Best Practice Documents and Multimedia Storytelling
Key Highlights: x Generated and posted Best Practices documents for the Playbook.
x Finalized the Ride & Drive Roadshow Best Practices video with Civitas Marketing in November. https://www.youtube.com/watch?v=GVmkvV10MKI
Next Steps: x Create infographics to highlight best practices for businesses in the Acceleration Partners and Ignite
Action Fund programs.
x Work with Atlas Data to create impact reports and visualizations for the Playbook in 2019.
x Continue to develop multimedia storytelling concepts based on upcoming programs and lessons.
Smart Webinars
Key Highlights: x Hosted a Smart Columbus webinar introducing the Playbook on November 7th. There were 100
registrants and 45 attendees.
Next Steps: x Finalize the 2019 webinar schedule in January 2019.
Smart Columbus E-Book Key Highlights:
x Nothing to report at this time.
Next Steps: x Due to budget constraints, this item may be re-scoped.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
50
Content Dissemination Attending and Presenting at EV-related and OEM Dominated Conferences Key Highlights:
x On October 23rd, Smart Columbus hosted the New Urban Champions Learning Expedition with a fireside chat on the Columbus Way featuring Joanna Pinkerton of COTA, Columbus City Council President Shannon Hardin, and Columbus Partnership CEO Alex Fischer. Represented in the audience were leaders from nine cities, four countries, four universities and private sector coming from mid-sized cities around the world.
x On November 28th, Smart Columbus hosted the US Ignite Forum Smart Transportation workshop. Brandi Braun and Jordan Davis spoke on the connected, autonomous, shared and electric future of mobility. In addition to sharing a Smart Columbus overview, the electrification program and progress to date was featured. Forty people were in attendance, including representatives from Boston, Massachusetts; Portland, Oregon; Lincoln, Nebraska; Washington, D.C.; Ann Arbor, Michigan; Lexington, Kentucky; Middletown, Ohio; and the State of Wyoming. Businesses represented included T-Mobile, Cisco, Deloitte, American Tower and LG Electronics.
x Key conferences included:
o September 30th - October 3rd – The Smart Columbus team attended the 31st International EV Symposium and Exhibition (EVS31) in Kobe, Japan. Bud Braughton presented on the process for identifying public charging stations in the Columbus region;
o October 29th – Mark Patton presented on electrification at the Smart Cities Summit in Atlanta;
o November 12th – Presented on an “Innovations for a Sustainable Infrastructure” panel at Harvard Business School with Yellow Cab of Columbus;
o November 15th – Jordan Davis presented on electrification at LAComotion;
o November 28th – US Ignite Forum learning exchange at the Experience Center; and
o November 26-27th – Zach McGuire attended the LA Auto Show.
x Submitted abstracts to speak at the Forth Mobility Conference (Portand, Oregon) in June 2019.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
51
x Submitted abstracts to speak at EVS32 (Lyon, France) in May 2019. Six abstracts were accepted to go to the next round of consideration, including:
o Lecture Series
� Multi-Unit Dwelling Charging Installation Program
� Tools for Accelerating EV Adoption
� Creating an EV Sales Environment with the Smart Columbus Electrified Dealer Program
o Dialogue Series
� Clean Charging in Columbus
� Measuring Performance of a Smart City
� Innovative Procurement for Fleet Electrification
x See Appendix K for the full list of Q7 speaking engagements.
Next Steps: x Speak at the Midcontinent EV Road Map Launch Event: Great Plains Institute in January 2019.
x Attend and speak at CES and the Transportation Research Board (TRB) Annual Meeting in January 2019.
x Speak at the OSU Environmental Professionals panel.
Media Relations and PR
Key Highlights: x Columbus Mayor Andrew Ginther and Columbus CEO
Kenny McDonald participated in a media tour in New York City, where they discussed Columbus' leadership in the Midwest. Mayor Ginther discussed the acceleration of EV adoption in Columbus on Bloomberg TV and Cheddar.
o https://www.bloomberg.com/news/videos/2018-11-28/how-columbus-ohio-became-america-s-smart-city-video
o https://cheddar.com/videos/city-of-columbus-still-wants-to-be-national-destination-even-without-hq2).
Next Steps: x Re-evaluate the national media relations approach and goals, based on the 2019 budget.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
52
Social Media
Key Highlights: x Launched the B2B social media campaign for Smart
Columbus Playbook content weekly on LinkedIn and Twitter.
x Top Playbook asset shared on LinkedIn:
o Battelle Drive Less Study post on 11/29/18: 921 impressions, 26 clicks, 16 likes, 5 shares https://smart.columbus.gov/Playbook-Assets/Future-Mobility/Decreasing-the-82-Percent-SOV-Rate-in-Columbus/
x Top Playbook asset shared on Twitter:
o Five Lessons Learned post on 11/13/18: 12,184 impressions, 38 clicks, 49 likes, 10 retweets https://smart.columbus.gov/Playbook-Assets/Our-Journey/Transporting-Our-City-to-the-Future--Five-Lessons-Learned-Since-the-Smart-City-Challenge/
Next Steps: x Continue to share Playbook content weekly on social media platforms.
Learning Exchanges
Key Highlights: x In Q7, Smart Columbus had learning exchanges with new cities, US Ignite, Deloitte and the
Detroit Young Professional/Mobility Group. Smart Columbus connected with the following cities/countries in Q7:
o New Cities
� Austin, Texas � Baltimore, Maryland � Edmonton, Alberta � Memphis, Tennessee � Nashville, Tennessee � New Haven, Connecticut � Portland, Oregon � San Jose, California � ENGIE (Mexico and North America) � Mexico City, Mexico (Panamerican University) � Guadalajara, Mexico (University of Guadalajara) � La Rochelle, France (University of La Rochelle)
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
53
o US Ignite
� Boston, Massachusetts � Portland, Oregon � Lincoln, Nebraska � Washington, D.C. � Ann Arbor, Michigan � Lexington, Kentucky � Middletown, Ohio � State of Wyoming
o Deloitte
� Windsor, Ontario � Ann Arbor, Michigan
o Detroit Young Professional/Mobility Group
� TechStars Mobility � Live6 � GM Maven � City of Detroit – Office of Mobility Innovation � Ford Motor Company GoRIde � HNTB
Next Steps: x Attend CES and engage with the Southern Nevada Transportation Authority in January 2019.
x Attend the 2019 Summit on Transportation in the Midcontinent Region located in Chicago, Illinois. This is an opportunity to network with dozens of other peer cities.
x Attend and speak at the Shared Use Mobility Conference in Chicago, Illinois in March 2019.
x Attend the Detroit Auto Show and meet with local folks in addition to show attendees.
Develop an International Advisory Committee Next Steps:
x Due to budget considerations, the program will no longer include this initiative.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
54
CONTRACTS AND PARTNER AGREEMENT STATUS
IMPLEMENTATION PLANS Implementation plans were submitted in prior quarters. No new implementation plans will be submitted.
RISK MANAGEMENT AND POLICY REGISTER Smart Columbus made progress on the Risk and Policy Register during Q7. See Appendix C for the document.
PARTNER CONTRIBUTION Q7 STATUS UPDATE
American Electric Power (AEP) $22.8M No new updates.
The Ohio State University (OSU) $7.5M No new updates.
Columbus Partnership $7.5M No new updates.
DC Solar $5.4M No new updates.
Mid-Ohio Regional Planning Commission (MORPC) $600,000 No new updates.
FleetCarma $900,000 No new updates.
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
55 55
BU
DG
ET AN
D C
OST M
AN
AG
EMEN
T Q
7 saw an increase in project expenditures as activities ram
ped up. The reporting period for financial expenditure data for the City of C
olumbus
was based on invoices received through D
ecember 31, 2018. S
ee the following page for an explanation of the Y
ear 2 Com
mitm
ent Funds.
0500000
1000000150000020000002500000300000035000004000000
Year 2 S
pendY
ear 2 Com
mitm
entsY
ear 2 Total
Year 2 B
udget Analysis
0
1000000
2000000
3000000
4000000
5000000
6000000
7000000
Program
Spend
Total Com
mitm
entsTotal To D
ate
Program
Budget A
nalysis
Year 2 S
pend: $2,252,028 Y
ear 2 Com
mitm
ents: $1,337,822 Y
ear 2 Total: $3,589,850 P
rogram S
pend: $5,316,666 C
omm
itments: $1,337,822
Total To D
ate: $6,654,488
APR
IL 2017 THR
OU
GH
DEC
EMB
ER 2018
Priority 1
$ 268,753
$ 5,540
$ 274,293
Priority 2
$ 875,516
$ 138,632
$ 1,014,148
Priority 3
$ 2,351
$ 75,000
$ 77,351
Priority 4
$ 2,747,478
$ 505,573
$ 3,253,051
Priority 5
$ 1,178,113
$ 382,404
$ 1,560,517
Playbook
$ 97,326
$ 67,674
$ 165,000
Program
$ 147,129
$ 162,999
$ 310,128 M
anagement
Actual Spend
C
omm
itments*
Total
*Budget com
mitm
ents are estim
ated money
set aside by the PM
O
for specific initiatives in the grant program
.
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
56 56
Explanation of Year 2 Com
mitm
ent Funds C
ity of Colum
bus – $693,076 x
$123,000 – 2.1 Public Fleet Incentives – M
oney has been comm
itted to public fleet purchases.
x $75,000 – P
riority 3 – Money has been com
mitted to e-bikes. Lyft recently purchased M
otivate, the parent company of C
oGo. If bikes are
not deployed through Colum
bus Recreation &
Parks as previously discussed, the C
ity may consider m
atching them w
ith US
DO
T funds for C
oGo stations as part of the m
obility hubs.
x $125,000 – P
riority 4 Research – $25,000 w
ill be utilized to purchase additional data for EV
adoption rates; $100,000 will be reallocated
to 2019 Public Fleet incentives.
x $175,000 – 5.1 R
esidential Charging – M
oney will be reallocated to the 2019 C
onsultant Team B
udget.
x $150,000 – W
orkforce Developm
ent Consulting – R
FP has been advertised and is due on January 25
th.
x $45,076 – C
onferences, Learning Exchanges, Travel, etc. – M
oney will be added to the 2019 travel funds for E
VS
32, EV
S 33,
Roadm
aps 12, and other applicable conferences.
Colum
bus Partnership – $404,639 x
$80,600 – CivitasN
ow D
ecember and January retainers.
x $110,000 – Ignite A
ction Plan – $15,000 is allocated to AE
P; $15,000 is allocated to cover the Colum
bus Partnership m
atch; $80,000 will
be reallocated to cover this strategy in 2019.
x $45,000 – E
lectrification Coalition D
ecember and January retainers.
x $169,039 – R
emaining 2018 funds to be used for Team
Manager and Team
Coordinator D
ecember pay and overages on w
ebsite. B
alance will be paid out in Q
1 of 2019.
Consultant Team
– $240,106 x
$240,106 – Money w
ill be used to prepare the 2018 Annual R
eport, remainder w
ill be allocated towards finishing 2018 charging designs
and other respective tasks to be paid out in Q1 of 2019.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
57
SMART CITY SCHEDULE Activities within the schedule are progressing according to plan. Q7 saw an accelerated effort on Priority 4 with the completion of the Logic Model and Evaluation Plan for Major Consumer Adoption Programs and the launch of the EV Consumer Education Campaign. See Appendix B for the schedule.
PERFORMANCE MEASUREMENT PLAN The Performance Measurement Plan was submitted to PGAPh with the Q5 report. No new updates were made to the plan.
YEAR 2 LESSONS LEARNED The Year 2 Lessons Learned repository, shown in Appendix E, details significant findings, recommendations and new insights realized during Years 1 and 2 of the project, and will be amended annually to reflect new findings. The application of the Lessons Learned by the City of Columbus can potentially increase the effectiveness of the Paul G. Allen Philanthropies’ (PGAPh) future capital investments and provide support for EV adoption in cities worldwide. Smart Columbus is using the Lessons Learned tool to identity both successes and/or shortcomings, and detail the resulting possible impacts and next steps. The list details the lesson learned, resulting action, potential impact, and the pertinent references by Priority/Initiative. See Appendix E for the Year 2 Lessons Learned document
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
58
ACTIVITY LOGS PRIORITY 1 ACTIVITY LOG ITEM TASK LEAD STATUS NOTES
Initiative 1.1 Utility-Scaled Renewables
Carryover Activities
1
AEP will maintain AEP Ohio website interconnection service for customers to install new distributed generation projects.
Sherry Hubbard, AEP Ohio Completed
AEP Ohio continued to maintain the website where customers and their contractors may learn about the process and download applications for interconnection to install new distributed generation projects. https://aepohio.com/builders/GeneratingEquipment.aspx
2 Continue deployment of the 10 solar generators from DC Solar.
Simon Teed, DC Solar Ongoing
Ongoing deployment of units at Ohio Dominican University (ODU), the Ohio Department of Transportation (ODOT), the Ohio Department of Public Safety (ODPS), Yellow Cab of Columbus and a floating unit for events.
Q7 Activities
1
AEP will continue program for customer driven distributed generation projects and report on new distributed generation projects.
Sherry Hubbard, AEP Ohio Ongoing
AEP Ohio continued their program for customer driven distributed generation projects and reports quarterly on new projects.
2 Collect and analyze data on deployment of 10 solar generators from DC Solar.
Simon Teed, DC Solar Ongoing
Ongoing collection and analysis of data from units deployed at ODOT, ODPS, Yellow Cab of Columbus and the event unit.
3
Outreach conducted to commercial customers of Columbus Division of Power for EcoSmart.
Patti Austin, DOP Ongoing
In addition to social media posts, DOP met with the city’s energy manager to discuss increasing the EcoSmart Choice participation percentage. Currently, city facilities participate at a 20% level. The goal is to increase this to 50% by 2020. DOP calculated the 2017 and 2018 year to date costs for the city and estimated the cost deltas for each department if they increased participation by 40% and 50%.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
59
ITEM TASK LEAD STATUS NOTES
4
Continue to develop plans for using biogas from City wastewater treatment plants as fuel for Combined Heat and Power.
Patti Austin, DOP Ongoing
Detailed design plans for the Jackson Pike Co-Generation WWTP project began in October and will continue through 2019.
5
Columbus Division of Power to continue design of rehabilitation of hydroelectric plants.
Patti Austin, DOP Ongoing
The design phase is 50% complete and the technical/detailed design memos were submitted. It was determined that all major turbine components will be replaced. The consultant began the plan and specification preparation.
Initiative 1.2 Grid Modernization and Efficiency
Carryover Activities
1 AEP to continue running Community Energy Savers (CES) program.
Sherry Hubbard, AEP Ohio Ongoing
CES is part of the AEP Ohio Energy Efficiency/Peak Demand Reduction Action Plan and will be available to interested communities on a first-come, first-served basis while funding is available.
2 AEP will contract with research partner on Vehicle to Home research.
Ryan Houk, AEP Ohio
Not Yet Started Research will take place in 2019.
3
Columbus Power to execute agreements with vendors for Advanced Metering Infrastructure.
Kristian Fenner, DOP
Not Yet Started
The DOP’s RFP for the AMI project was advertised in early December. Submissions are due in Feb 2019. A contract is expected to be signed in late 2019.
4
CES: AEP Ohio with Smart Columbus representative(s) to develop strategy to reach out to Columbus civic associations to raise awareness of CES eligibility, requirements and benefits.
Sherry Hubbard, AEP Ohio Completed
AEP Ohio presented the CES program to the City’s team working on the American Cities Climate Challenge, which included neighborhood liaisons. CES is under consideration as one engagement strategy, among many, that could support the City’s goal to greatly increase the number of homes receiving energy audits.
5 CES: Civic associations to self-identify interest in participating.
Sherry Hubbard, AEP Ohio In Process
With CES, the decision about whether to participate lies completely with the neighborhood or civic association.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
60
ITEM TASK LEAD STATUS NOTES
6
Columbus Power continue planning Advanced Metering Infrastructure – locations, communications, IT and data management.
Patti Austin, DOP Ongoing The DOP’s RFP for the AMI project was advertised in early December. Submissions are due in Feb 2019.
7
Columbus Power to award the contract for city for Street Light Technology Conversion.
Patti Austin, DOP Complete
A contract was awarded to HNTB for $1.1M for the implementation study and design of Phase 1 for Smart Street Lighting technology (this does not include construction).
8 Microgrid: Facilitate conversations with potential site hosts.
Sherry Hubbard, AEP Ohio Completed Began discussions with potential site
hosts for a microgrid demonstration pilot.
9
Columbus Power develop specifications and prepare terms and conditions for Advanced Metering Infrastructure.
Patti Austin, DOP Not Yet Started
The DOP’s RFP for the AMI project was advertised in early December. Submissions are due in Feb 2019.
10
EE: AEP Ohio reports savings estimates for seven counties in Smart Columbus after filing annual compliance report with Public Utilities Commission of Ohio.
Sherry Hubbard, AEP Ohio
Not Yet Started
Savings for the seven-county region will be available to report after the May 15, 2019 filing. Energy efficiency programs are on track to reach their targets for 2018.
11 Columbus Power to issue notice to proceed for LED street light construction.
Patti Austin, DOP Not Yet Started
Construction will begin after the technology implementation study has been finalized.
Q7 Activities
1
Microgrid: Continue engineering and design analysis progressing towards final implementation framework.
Sherry Hubbard, AEP Ohio In progress Implementation of the framework design
is anticipated in Q8.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
61
ITEM TASK LEAD STATUS NOTES
2
CES: AEP Ohio continue to support committed communities with awards, PR, etc.
Sherry Hubbard, AEP Ohio Ongoing
AEP Ohio celebrated Toronto, Ohio’s successful CES campaign. Though not in the seven-county region, this award is an example of AEP Ohio’s ongoing commitment to CES.
3
Columbus Power to execute agreements with vendors for Advanced Metering Infrastructure.
Patti Austin, DOP Not Yet Started
The DOP’s RFP for the AMI project was advertised in early December. Submissions are due in Feb 2019. A contract is expected to be signed in late 2019.
4 Columbus to begin Phase 1 of converting street lights to LED
Patti Austin, DOP Ongoing DOP received its first shipment of LED luminaires and will begin converting circuits in early 2019.
5
Columbus Power to install initial data collectors, preparation of computer environments, develop software interfaces and test all for Advanced Metering Infrastructure
Patti Austin, DOP Not Yet Started
DOP expects to issue a Notice to Proceed for AMI construction in late 2019, with an anticipated completion date of November 2025.
6 All new street lights installed to be LED. Patti Austin, DOP Ongoing
Specifications have been published, which state that all new street lights are required to be LED (includes street lights installed by outside developers/developments).
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
62
PRIORITY 2 ACTIVITY LOG ITEM TASK LEAD STATUS NOTES
Initiative 2.1 Public Fleets
Carryover Activities
1
Continue to assist other regional government entities with EV technical and safety training.
Andrew Conley, CFO Ongoing
Continued outreach and education activities to regional public fleets through in person meetings, webinars and educational working group sessions.
2
City of Columbus and other committed fleets accept delivery and begin use of EVs.
Kelly Reagan, City of Columbus Ongoing
Fleets continue to commit, purchase and deploy vehicles. See Appendix A – Quarterly Indicators and Metric Targets for details.
Q7 Activities
1
Continue to work with other regional governments / institutions to identify electric fleet acquisition opportunities.
Andrew Conley, CFO Ongoing
Continuing to meet with, advise and assist numerous public fleets throughout the seven-county central Ohio region.
2
Provide outreach and education, analysis, vehicle demonstrations and additional resources to public fleets, as needed.
Andrew Conley, CFO Ongoing
Continuing to meet with, advise and assist numerous public fleets throughout the seven-county central Ohio region.
3
Secure additional public fleet pledges/commitments to deploy EVs and charging infrastructure in their jurisdictions.
Andrew Conley, CFO Ongoing
Secured commitment for two 2019 EV purchases from Norwich Township. Continue working with fleets throughout the region to secure additional commitments.
4
Continue working with public fleets on implementation of EV and EVSE deployment plans, including helping public fleets sign on to City of Columbus cooperative purchase/bid package to streamline acquisitions.
Kelly Reagan, City of Columbus;
Andrew Conley, CFO
Ongoing
The City of Columbus finalized the 2019 Cooperative EV purchase agreement pricing and contract structure with Mike Albert Leasing, Ricart and Byers. This is available to all public and many private fleets throughout the region.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
63
ITEM TASK LEAD STATUS NOTES
5
Plan and host regional technical workshop and/or training session for regional fleets.
Andrew Conley, CFO Complete
Staff focused efforts on working with multiple public fleets in one-on-one and small group meetings, as well as assisting in the promotion of a Fleet Electrification Workshop on October 9th and meetings with Pickaway and Fairfield County fleets.
Initiative 2.2 Private Fleets
Carryover Activities
1 Continue with baseline fleet analysis for private sector.
Matt Stephens-Rich, Electrification Coalition In Progress
Continued efforts with numerous private fleets to provide analysis, training and other resources to support EV deployment.
2 Update/establish total fleet vehicles available to transition opportunity.
Matt Stephens-Rich, Electrification Coalition In Progress Secured 47 new vehicle commitments
in Q7.
3 Update/establish fleet purchasing options for pledged companies.
Matt Stephens-Rich, Electrification Coalition In Progress
Continued collaboration with Mike Albert Fleet Solutions on making used EV purchasing options available for Smart Columbus fleets.
4 Continue to contact private fleet managers.
Matt Stephens-Rich, Electrification Coalition In Progress
Continued outreach to organizations with fleet operations and identified operation.
5 Assist private fleet managers with procurement specifications.
Matt Stephens-Rich, Electrification Coalition In Progress
Vehicle recommendations have been provided to committed fleets, including detail for owning vs. leasing.
Q7 Activities
1 Continue assisting private entities with installing charging infrastructure.
Matt Stephens-Rich, Electrification Coalition In Progress
Private fleets have been connected with vendors and contractors to provide quotes for charger installation. When appropriate, fleets have also been referred to the AEP Ohio EV Charging Incentive Program.
2
Coordinate with Consumer Adoption on Group Purchase programs and OEM dealer engagement strategies that will support Fleet Transition goals.
Zach McGuire, Columbus Partnership
In Progress Key OEMs offer fleet incentives.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
64
ITEM TASK LEAD STATUS NOTES
3
Continue assisting private fleet managers with EV technical and safety training.
Matt Stephens-Rich, Electrification Coalition In Progress
Continued outreach to private fleet managers and organizations, while also using membership-based organizations (chambers of commerce, industry groups, etc.), to maximize message and outreach.
4 Continue receiving private fleet pledges.
Matt Stephens-Rich, Electrification Coalition In Progress
Provided technical and safety training to fleets, as needed, for procured vehicles.
Initiative 2.3 Transportation Service Providers
Carryover Activities
1
Coordinate with other fleet and Consumer Adoption programs to ensure competitive pricing for Group Purchase Programs.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
The City of Columbus finalized the 2019 Cooperative EV purchase agreement pricing and contract structure with Mike Albert Leasing, Ricart and Byers. This is available to all public and many private fleets throughout the region.
2 Develop detailed strategy and associated timelines for TSP EV adoption.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing Staff finalized strategy and activities for 2019 TSP implementation as detailed in the SCEP for 2019.
3 Assist TSPs with securing an additional 30 EVs
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
Working with Yellow Cab of Columbus, Uber, Lyft, the Columbus Taxi Board, COTA and MORPC on TSP EV adoption.
Q7 Activities
1 Assist TSPs with completing purchases of 30 EVs.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
Working with Yellow Cab of Columbus, Uber, Lyft, Columbus Taxi Board, COTA, and MORPC on TSP EV adoption.
2 Continue to contact TSP fleet managers and assessing opportunities.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
Working with Uber and Lyft to market the TSP incentives directly to drivers in the seven-county region. Staff also remains in close contact with Yellow Cab of Columbus, COTA and MORPC.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
65
ITEM TASK LEAD STATUS NOTES
3
Continue to provide outreach, education, analysis, vehicle demonstrations and other technical assistance to TSP fleets, as needed.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
Working with Yellow Cab of Columbus in the implementation and administration of the $30,000 first round of the TSP rebate awards. They have purchased 10 Chevy Bolt EVs through the first round of this program.
4 Secure additional pledges/commitments from TSP fleets in the region.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
On December 13th, Smart Columbus partnered with Uber to host an EV Ride & Drive and educational event at Uber’s “Green Light” Center in Columbus.
5
Continue to assist TSP fleet managers with EV technical and safety training.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
Fleet and individual drivers were invited to all technical trainings and educational workshops described in the public and private fleet sections above.
6
Continue to market consumer EV incentives to TSP contract drivers and owners.
Andrew Conley, CFO
Kevin McSweeney, City of Columbus
Ongoing
Finalized Round 2 of the TSP Rebate Program, designed to offer rebates to both traditional taxi service providers as well as drivers for TNCs. Round 2 of the program was approved by City Council and publicly released November 20, 2018.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
66
PRIORITY 4 ACTIVITY LOG ITEM TASK LEAD STATUS NOTES
Initiative 4.1 Research and Assessment
Q7 Activities
1
Produce analysis on how consumer adoption interventions impact the baseline awareness and consideration indicators identified in the initial consumer adoption market report.
Alex Slaymaker, Columbus Partnership In Progress The team will be conducting an
analysis in 2019.
2
Complete a Logic Model and Evaluation Plan for major consumer adoption programs.
Alex Slaymaker, Columbus Partnership Complete
Navigant completed the studies in December 2018. The team will be acting on results in January 2019.
Initiative 4.2 Increase Consumer Awareness for EVs
Carryover Activities
1 Launch fall semester design project with CCAD.
McKinzie Harper, Columbus Partnership Complete
Class visited the Smart Columbus Experience Center in October to learn about Smart Columbus objectives and EVs.
Q7 Activities
1
Be opportunistic about integrating EV promotion into large scale events throughout City.
Alex Slaymaker, Columbus Partnership
McKinzie Harper, Columbus Partnership
Ongoing
Hosted an Uber Ride & Drive event in December for TSP drivers in partnership with the city’s TSP EV Rebate Program.
2
Establish a regular cadence of media pitches to deliver a steady drumbeat of news to the local community.
Jennifer Fening, Columbus Partnership Ongoing
Issued news releases on the TSP rebate program and the launch of the Playbook. See Appendix L for all media placements.
3
Regularly and consistently issue social media content, engage with residents and local influencers and leverage paid spend to expand the reach of Smart Columbus’ social media channels.
Jennifer Fening, Columbus Partnership Ongoing
Followers and engagements continue to increase. Incorporated ads from the EV Consumer Adoption Campaign into social media feeds in December.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
67
ITEM TASK LEAD STATUS NOTES
4 Select final designs from CCAD students for public chargers.
McKinzie Harper, Columbus Partnership Complete
Final presentations were held on December 12th. The team is evaluating the feasibility of one charger design.
Initiative 4.3 Drive Consumer Consideration for EVs
Carryover Activities
1 Execute Ride & Drive Roadshow.
Alex Slaymaker, Columbus Partnership Ongoing
Wrapped up the Ride & Drive 2018 season, created a Playbook video on the program, and completed annual reporting documents.
2 Announce final selections of recipients for the Ignite Action Fund.
Alex Slaymaker, Columbus Partnership Ongoing
Awarded funding to AEP Ohio for 15 EV rebates in Q4. All 15 rebates were awarded in less than 31 days. The Columbus Zoo has awarded 4 rebates and has funding to award 4 more by March 2019. Alliance Data Services also awarded 15 rebates with support from the Ignite Action Fund.
3 Launch B2B campaign. Jennifer Fening, Columbus Partnership Discontinued Due to budget constraints, we are
not proceeding with this initiative.
4 Give extended test drives to Columbus Partnership members.
Alex Slaymaker, Columbus Partnership Discontinuing
Little interest in this offering due to the Ride & Drive Roadshow and test drives at the Experience Center.
5 Develop, test and refine campaign creative concepts.
Jennifer Fening, Columbus Partnership Complete
Concepts were refined based on partner input, including feedback from the Forth advisory committee.
6 Develop playbook asset on the findings of the creative concept testing.
Donna Marbury, Electrification Coalition In Progress
Concepts were not tested with focus groups, based on budget. They will be tested once their live, and the campaign will be optimized against the best-performing creative. A Playbook post will be developed about optimizations.
7 Measure and optimize B2B campaign.
Jennifer Fening, Columbus Partnership Discontinued Due to budget constraints, we are
not proceeding with this initiative.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
68
ITEM TASK LEAD STATUS NOTES
Q7 Activities
1 Continue speaking to company executive leadership teams.
Jordan Davis, Columbus Partnership Ongoing Continue to build support for Smart
Columbus aligned projects.
2 Continue identifying and engaging with Mobility Ambassadors.
Alex Slaymaker, Columbus Partnership Ongoing
Continuing on-demand customized company assistance and bi-monthly group meetings with Ambassadors. Preparing to launch cohort #2 in January 2019.
3 Continue distribution of communications toolkit materials to employers
Alex Slaymaker, Columbus Partnership Ongoing
Updated the materials for the next cohort of Mobility Ambassadors. Secured paper educational materials from service providers. Shared current events and news sources in monthly Ambassador e-newsletter.
4
Convene all Mobility Ambassadors for knowledge sharing and planning for Year 3.
Alex Slaymaker, Columbus Partnership Complete
Hosted a roundtable at Cardinal Health in December 2018 with Ambassadors. Discussed accomplishments of 2018 and looked to milestones in 2019.
5
Continue recruiting new companies to join the Acceleration Partner Program.
Jordan Davis, Columbus Partnership Ongoing
52 additional partners will be recruited in 2019 to reach the goal of Acceleration Partners.
6
Continue conducting test drives at Showroom, on Ride & Drive Roadshow, and providing extended test drives for executives.
Alex Slaymaker, Columbus Partnership Ongoing
Facilitated over 200 test drives at the Experience Center since its opening in July 2018. Extended test drive offering for executives is not a priority due to low demand and high performing executive adoption rates.
7 Host EV educational programming at Smart Columbus Showroom.
Kinzie Harper, Columbus Partnership Ongoing Hosted EV 101 Presentations at the
Experience Center.
8 Continue to distribute New EV Owners’ Gifts.
Zach McGuire, Columbus Partnership In Progress
Distributed 136 owners’ gifts to dealers, with the intent that a majority of them will go to 2018 buyers and the remaining will go to new buyers.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
69
ITEM TASK LEAD STATUS NOTES
9 Launch educational campaign.
Jenifer Fening, Columbus Partnership Complete Launched the campaign on
December 1st.
10
Launch Smart Columbus Website Phase 2 – additional educational content.
Jenifer Fening, Columbus Partnership Complete
The refresh of the Drive Electric section of the website launched December 3rd.
11 Deliver digital leads to Columbus dealers.
Zach McGuire, Columbus Partnership On Track
The team is currently delivering leads to dealers on a scheduled basis.
12 Schedule dates for Ride & Drives for Year 3.
Alex Slaymaker, Columbus Partnership Ongoing
Multiple events are scheduled for 2019. Demand is expected to be higher than what we have budget to deliver.
13 Develop Year 3 goals and work plan.
Jordan Davis, Columbus Partnership Complete The goals and work plan were
developed.
14 Evaluate and optimize owner loyalty strategies.
Jordan Davis, Columbus Partnership Ongoing
Sending website commitments to Clean Fuels Ohio. Initiated discussion with CFO about scheduling additional programming in 2019.
Initiative 4.4 Improving Consumer Sales Experience of EVs
Carryover Activities
1 Establish lead management processes and protocols.
Zach McGuire, Columbus Partnership On Track
A process for the Ride & Drive program has been established. In addition, a process for online lead generation has been established and the team is currently looking at ways to improve it.
2 Receive best practices from other cities for used EVs.
Zach McGuire, Columbus Partnership In Progress
The team has had conversations with Los Angeles, but have yet to have meaningful conversations about the used EV market, as the goals are based on new cars.
3
Continue discussions about OEMs supplying EV models for Experience Center at new Smart Columbus office.
Zach McGuire, Columbus Partnership
On Track
The team acquired commitments for 2019 from all the vehicles that have been in use since opening, and is working on adding two more vehicles for the Experience Center.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
70
ITEM TASK LEAD STATUS NOTES
4 Determine how to assess and track success of Dealer Training Program.
Zach McGuire, Columbus Partnership In Progress
Currently, sales data is being used to track the success of the program, but added metrics and processes are being developed.
5 Facilitate dealer trainings. Zach McGuire, Columbus Partnership On Track All 14 Electrified Dealers have
completed dealer trainings.
Q7 Activities
1 Conduct dealer trainings. Zach McGuire, Columbus Partnership On Track All 14 Electrified Dealers have
completed dealer trainings..
2
Continue actively engaging with local dealership owners and OEM leadership.
Zach McGuire, Columbus Partnership On Track
Continued active engagement, and are now prioritizing which OEMs to spend most time with moving forward.
3 Continue to educate dealers about EVs and how to increase sales.
Zach McGuire, Columbus Partnership On Track
All Electrified Dealers have been trained on how to effectively sell EVs.
4 Continue lead generation efforts across consumer consideration strategies
Zach McGuire, Columbus Partnership
On Track Continued to generate leads on all the test drive platforms and through the online adoption campaign.
5
Continue negotiating group purchase rates for fleet and consumer purchases of new and used vehicles.
Zach McGuire, Columbus Partnership In Progress
Working on finalizing new purchase rates, but it is a tough and long process. Four group purchase rates have been negotiated to date.
6 Assess current dealership engagement and make necessary adjustments.
Zach McGuire, Columbus Partnership On Track
On track with dealership engagement but planning to further engage with dealers in 2019.
7
Send end of year thank you gifts and recaps of achievements to Dealers and OEMs.
Zach McGuire, Columbus Partnership Complete
Dealers received their gifts in person and OEM contacts were sent their gifts.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
71
PRIORITY 5 ACTIVITY LOG ITEM TASK LEAD STATUS NOTES
Initiative 5.1 Residential Charging
Carryover Activities
1 Begin installation of MUD EV charging infrastructure.
Megan Stein, CFO In Progress 28 charging ports were installed and an additional 20 are in progress to be completed in Q8.
2
AEP will research successful smart charging integration and off-peak charging programs or demand response programs.
Sherry Hubbard, AEP Ohio In Progress
AEP Ohio began developing a small residential EV charging technical test to launch in early 2019.
3
Installation of up to (pending on PUCO approval) 250 Level 2 residential charging ports (AEP).
Sherry Hubbard, AEP Ohio In Progress
The original targets shown in the 2017 Electrification Plan for AEP residential charging were modified with the PUCO agreement. The new target is 60 MUD Level 2 charging ports.
4 Conduct inspections of completed MUD projects.
Megan Stein, CFO In Progress The CASTO and SP+ site visits are complete. Several additional site visits are planned in Q8.
5 Submit requests for rebate payments to Smart Columbus.
Megan Stein, CFO Not Started
Project partners are working on assembling documents, but nothing has been submitted to Smart Columbus yet.
6 Provide payments to developers for completed projects.
Megan Stein, CFO Not Started This will take place once the rebate payments are approved.
7 Begin to collect data. Megan Stein, CFO Not Started Data is not yet being collected.
8 Oversee education activities. Megan Stein, CFO In Progress
Many developers have created outreach materials and are sharing them with their tenants.
9
Advise developers in installing signage consistent with city recommendations for Year 1 projects.
Megan Stein, CFO In Progress
Signage (basic) for EVSE stations is required and will be applied to all equipment. Smart Columbus is working to finalize specific program branding in Q8.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
72
ITEM TASK LEAD STATUS NOTES
10 Address any site engineering issues with Year 1 projects.
Megan Stein, CFO In Progress No issues identified to-date.
11 Ensure appropriate signage for Year 1 projects.
Megan Stein, CFO In Progress Working with individual project partners to ensure signage is added to equipment.
12
Conduct broad outreach to developers to encourage applications for funding for Year 2.
Megan Stein, CFO In Progress Outreach for MUD Round 2 continues and several applications are expected in Q8.
13 Recommend projects for Year 2 funding. Megan Stein, CFO In Progress
Several new developers are working on applications for Round 2, and recommendations are expected in Q8.
14 Process first wave of grant applications.
Sherry Hubbard, AEP Ohio
In Progress
AEP Ohio has processed 63 applications from business customers for 165 Level 2 charging ports and nine DC fast charging ports.
15 Continue to administer Year 1 MUD projects. Megan Stein, CFO In Progress
28 charging ports were installed and an additional 20 are in progress to be completed in Q8. Site visits will follow activation in Q8.
16 Announce Year 2 awards. Megan Stein, CFO Not Started
Pizzuti was awarded one site with four charging ports. Additional applications are expected in Q8.
17 Help PMO secure contracts for Year 2 awards.
Megan Stein, CFO Not Started Contracts for Year 2 awards are anticipated in Q8.
18
Develop marketing and outreach strategy to help developers engage and educate tenants.
Megan Stein, CFO In Progress Working with individual developers, as well as AEP Ohio, to create marketing materials and perform outreach.
19 First wave of installations to be finalized.
Sherry Hubbard, AEP Ohio In Progress
Twelve charging ports were installed and activated throughout Q7.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
73
ITEM TASK LEAD STATUS NOTES
Q7 Activities
1
Continue to monitor and report data from Year 1 projects – address any compliance issues.
Megan Stein, CFO In Progress Monitoring of the Year 1 projects is on-going, and reporting will begin in Q8 for completed MUD charging stations.
2 Begin administration of Year 2 contracts. Megan Stein, CFO Not Started Year 2 contracts will be executed in
Q8.
3
Obtain funding from PMO and pass through to developers for completed projects.
Megan Stein, CFO Not Started No rebates have been issued to date, but rebate reimbursement packages have begun to be assembled.
4
Continue to assist developers with any site issues/engineering, marketing/education, and signage.
Megan Stein, CFO In Progress The team is providing ongoing assistance to developers.
5 Develop plan for gathering data on station utilization.
Megan Stein, CFO Complete A reporting tool was developed and will begin collecting data in Q8.
6
Columbus Power will study rates for EV charging as part of larger utility rate update.
Patti Austin, DOP On Hold The rate study has been postponed to 2019.
7
Develop recommended and sample MUD policies to assist MUDs in managing station use by tenants.
Megan Stein, CFO In Progress The team is working with individual developers on development-specific policies.
8
Evaluate need for any additional MUD funding and support by Smart Columbus.
Megan Stein, CFO Complete Funding has been encumbered.
9 Continuation of AEP Ohio grant program.
Sherry Hubbard, AEP Ohio Ongoing
Applications will continue to be accepted and processed until the targets are met or funding limits are reached.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
74
ITEM TASK LEAD STATUS NOTES
Initiative 5.2 Public Access Charging
Carryover Activities
1 Utilization Tracking Mechanism.
Bud Braughton, City of Columbus In Progress
Data from the fleet charging installations will continue to be reviewed. The team is awaiting completion of the pilot project to check public charging utilization. Work continues on making this data available in the Operating System.
2 Design and specifications for sites completed.
Bud Braughton, City of Columbus In Progress
For Mound/Fulton, a recommendation was made for cabinet design in order to meet utility requirements. Ludlow Street agreement to be finalized by beginning of Q8.
3 Construct first 5 fast charging projects (AEP). Ryan Houk, AEP In Progress
Nine fast charging project applications have been approved and are in the design stage.
4 Continue to develop public siting methodology.
Ryan Houk, AEP Ohio Complete
Conducted a siting study of the service territory to identify best future locations based upon projected EV penetration. Ideal sites have been partially vetted against the NREL siting study to identify candidates. Proximity to power and the impact to the grid have been identified as key criteria.
5 Install 4 DC fast charging stations and 8 Level 2 charging ports.
Ryan Houk, AEP Ohio In Progress
Six public Level 2 charging stations were activated in Q7. No DC fast charging stations have been completed thus far.
6 Install 5 Level 2 charging ports.
Bud Braughton, City of Columbus Complete
Due to funding timing, most public Level 2 charging will be completed by partners with backing and support from Smart Columbus.
Q7 Activities
1 Install 5 Level 2 charging ports.
Bud Braughton, City of Columbus Complete
Four ports were installed at the River and Rich CASTO Development (public at a MUD).
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
75
ITEM TASK LEAD STATUS NOTES
2
Continue development of partnerships with site hosts and secure commitments.
Bud Braughton, City of Columbus Ed Ungar, HNTB Dr. Stan Young, NREL
In Progress
In support of AEP Ohio’s program, outreach continued with potential site hosts such as CASTO and Shottenstein Properties Group for public/MUD charging opportunities.
3 Develop additional EVSE needs for future years.
Bud Braughton, City of Columbus Not Started
The team is awaiting Mound/Fulton, Ludlow Street and AEP Ohio Charging Incentive Program installations before determining the future needs.
4 Install 10 DC fast charging stations and 15 Level 2 charging ports.
Ryan Houk, AEP Ohio In Progress
Six public Level 2 charging stations were activated in Q7. No DC fast charging stations have been completed thus far.
5 Continue engaging and educating citizens.
Ryan Houk, AEP Ohio In Progress
As the first AEP Ohio EV charging stations come online, consumer awareness will increase. Nearly 150 stations are planned to be installed by March 2019.
Initiative 5.3 Workplace Charging
Carryover Activities
1
Assist private entities with site plans, charging specifications and construction.
Matt Stephens-Rich, Electrification Coalition In Progress
Provide connection with vendors, contractors and best practices for siting and spec-ing workplace charging sites.
2 Determine long term plan for workplace charging.
Zach McGuire, Columbus Partnership Matt Stephens-Rich, Electrification Coalition Ryan Houk, AEP Ohio
In Progress
Support workplaces in formulating policies, workplace charging programs and signage for daily utilization.
As part of the long-term plan, AEP Ohio is working through its customer experience team to educate workplaces and gather information about their interests in electrification and the incentive program.
3 Install 20 workplace charging ports.
Zach McGuire, Columbus Partnership Matt Stephens-Rich, Electrification Coalition Ryan Houk, AEP Ohio
In Progress Multiple workplace projects have been approved and are in varying stages of design and construction.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
76
ITEM TASK LEAD STATUS NOTES
Q7 Activities
1
Continue discussions with potential site hosts and secure commitments.
Zach McGuire, Columbus Partnership Matt Stephens-Rich, Electrification Coalition Ryan Houk, AEP Ohio
In Progress
AEP Ohio hosted a Smart Columbus EV Charging Roundtable with 30 attendees to discuss their incentive program and success stories of deployment.
2 Provide facility managers with any needed training and assistance.
Zach McGuire, Columbus Partnership Matt Stephens-Rich, Electrification Coalition Ryan Houk, AEP Ohio
In Progress Supported 13 applicants to AEP Ohio’s EV Charging Incentive Program.
3
Provide education materials and communications assistance to support efforts with employees.
Zach McGuire, Columbus Partnership Matt Stephens-Rich, Electrification Coalition Ryan Houk, AEP Ohio
In Progress
Developed a Workplace Charging Toolkit to guide workplaces through best practices and methodology for engaging employees.
4 Install 35 workplace charging ports.
Zach McGuire, Columbus Partnership Matt Stephens-Rich, Electrification Coalition Ryan Houk, AEP Ohio
In Progress Deployed 20 charging ports across 10 sites.
Initiative 5.4 Fleet Charging
Carryover Activities
1 Complete installation of 96 chargers for Columbus Fleet.
Bud Braughton, City of Columbus Complete
94 Level 2 fleet EV charging ports are currently operational with another eight installed and awaiting inspection in early January 2019.
2
Begin developing plans for Year 3 charging station installations for Columbus fleet.
Cristina Parady, Brian Waibl Polania City of Columbus
In Progress
There are currently 29 ports assigned between five charging sites for Year 3. The remaining (up to 69) still need to be assigned locations based on fleet need.
3
Continue to advise and work with Columbus Fleet to determine needs: number, locations, specifications, etc.
Cristina Parady, Brian Waibl Polania, City of Columbus
In Progress
Design is underway for the 29 ports assigned. The team needs to determine numbers for the Department of Public Utilities.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
77
ITEM TASK LEAD STATUS NOTES
4
Continue to advise and work with other public fleets to determine needs: number, locations, specs, etc.
Andrew Conley, CFO Ongoing
Continued to meet with, advise and assist numerous public fleets throughout the seven-county central Ohio region.
Q7 Activities
1
Continue developing plans for charging station installations for Columbus fleet.
Cristina Parady, Brian Waibl Polania, City of Columbus
In Progress As additional fleet assignments are made, the charging designs will follow.
Initiative 5.5 Building and Zoning Changes to Support EV Charging
Carryover Activities
1 Common Charging Payment System.
Bud Braughton, City of Columbus In Progress
Work continues for the USDOT projects. A vendor has been selected for the Multi-Modal Trip Planning App and an RFP is out for the Common Payment System.
2 Charging station specifications complete.
Bud Braughton, City of Columbus In Progress
Specifications have been developed for each project type (MUD, public, workplace and fleet), but work continues in unifying these specifications as a City of Columbus standard.
3
Finalize model site plan and specifications for installation of charging ports.
EIT 1, City of Columbus In Progress
Still waiting for the implementation of public chargers on Mound and Fulton Streets to be a model site plan for charging in public right-of-way. Fleet charging model site plans are under development as projects continue to be installed.
4
Columbus Power will continue researching successful smart charging integration and off-peak charging programs.
Patti Austin, DOP On Hold DOP postponed its rate study until 2019.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
78
ITEM TASK LEAD STATUS NOTES
5 Review impact of policy changes on initial charger installations.
EIT 1, City of Columbus In Progress
Still waiting for the implementation of public chargers on Mound and Fulton Streets. Continued work with Chief Ringley on implementing a draft City Fire Code for EVSE into current fleet projects.
6
Determine if additional policy updates are needed for future installations.
EIT 1, City of Columbus In Progress
Still waiting for the implementation of public chargers on Mound and Fulton Streets. Discussed draft City Fire Code policy with contractors installing EVSE for the AEP Ohio EC Charging Incentive Program.
Q7 Activities
1 Draft zoning and parking code updates as needed from policy review.
Bud Braughton, City of Columbus In Progress
The parking code language is currently in development, and the zoning code needs to be summarized and submitted internally to be drafted for legislation.
2 Legislate zoning and parking code updates as needed.
Bud Braughton, City of Columbus Not Started Awaiting completion of code language
drafting.
3 Develop budget, activities and milestones for 2019.
Bud Braughton, City of Columbus Complete This was submitted to PGAPh on
November 30th.
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
79
PLAYBOOK ACTIVITY LOG ITEM TASK LEAD STATUS NOTES
Carryover Activities
1
Date for Advisory Committee set and invitations to participants distributed.
Jennifer Fening, Columbus Partnership Complete Conducted calls with industry partners
to inform campaign.
2 Q7 playbook editorial calendar.
Donna Marbury, Electrification Coalition Complete Delivered to PGAPh on October 8th.
Q7 Activities
1 Launch Smart Columbus website Phase 3.
Jennifer Fening, Columbus Partnership In Progress
The website will be rebuilt in a new content management system beginning in January 2019.
2 Smart Columbus team members to attend EVS31.
Jordan Davis, Columbus Partnership Complete
Jordan Davis and Bud Braughton attended EVS31 from September 30th – October 3rd.
3
Smart Columbus to issue two national news releases on program accomplishments or learnings.
Jennifer Fening, Columbus Partnership Complete
Issued three press releases in Q7 on the TSP Rebate Program, Playbook launch and EV purchase rates.
4 Q8 playbook editorial calendar.
Donna Marbury, Electrification Coalition In Progress To be delivered by December 31st.
5 Advisory Committee convened.
Jennifer Fening, Columbus Partnership Complete Conducted calls with industry partners
to inform campaign.
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
80
APPEN
DIC
ES Included below
are key components of the appendix for updates that happened during Q
7. All other appendices are included as supplem
ental docum
ents. Please refer to the S
harePoint site for these files. The docum
ents are labeled according to their appendix number.
APPEN
DIX A
– QU
AR
TERLY IN
DIC
ATO
RS A
ND
METR
IC TA
RG
ETS The Q
uarterly Indicators and Metric Targets spreadsheet is used as a w
ay to track actual indicator progress against the established targets/goals for each priority of the project on a quarterly basis. The indicators are provided at the P
roject, Priority and Initiative level.
Perform
ance indicators are addressed at three levels:
1. The overall project level;
2. The five project priorities (grid decarbonization; fleet E
V adoption; transit, autonom
ous and multi-m
odal systems in the city; consum
er E
V adoption; and E
V charging infrastructure); and
3. The specific initiatives under each priority area.
The project, priority and initiative indicators are hierarchical. Priority indicators contribute directly to a project indicator, and similarly, initiative
indicators contribute directly to one of their respective priority indicators. Progress indicators are also defined. P
rogress indicators encompass
anything that can be numerically evaluated and reflect progress tow
ards objectives, but do not contribute directly to higher level indicators. M
ethods and data sources for estimating indicators and tracking progress tow
ards targets are described in the Perform
ance Measurem
ent Plan.
The ‘Adjusted Targets’ spreadsheet outlines the current goals that have been established by the project working groups for each indicator. The
‘Progress’ spreadsheet reports the actual progress of each indicator toward the established targets. The ‘Progress_Y1_P4’ spreadsheet reports
the progress specifically for Year 1 P
riority 4 Indicators. This has been separated out due to Priority 4 future program
development changes
having been included in the main ‘Progress Tab’.
The ‘Progress’ spreadsheet includes highlighted cells to help clarify how the spreadsheet functions. C
ells that are yellow are direct inputs. C
ells that are orange are calculations that are either sum
ming values or converting values to a com
mon unit. C
ells that are green are calculations that are converting the appropriate values into M
TeCO
2 used to calculate overall GH
G em
ission reductions.
Timelines for indicators that are contingent upon P
UC
O approval w
ill be adjusted as approval is received.
See the attached A
ppendix A – S
CC
-P7-Q
uarterly Indicators and Metric Targets-Q
7.xlsx for more detail.
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
81
Below
are some clarifications for the targets and progress K
PIs:
Targets x
The ‘Targets’ tab of the KPI spreadsheet now includes projected G
HG
reductions based off of the projected targets for each initiative, including the overall project goals. The m
ethodology used for the calculations is the same used for the quarterly progress num
bers as previously described in the P
fMP
. x
The OS
U fleet E
Vs target (row
64) has been reduced from 50 to 15 due to grant budget reallocations and decentralized fleet inhibiting
purchase plan development.
x The B
2B M
arketing initiatives (rows 147-149) as part of Initiative 4.3 have been disbanded due to budget reductions.
x A
ll of the overall LOP
targets for Initiative 4.2 (row 116-124) w
ere reduced.
x The overall LO
P target for num
ber of Experience C
enter test drives (row 129) increased from
400 to 450.
x The overall LO
P target for num
ber of extended test drives conducted (row 134) decreased from
35 to 15.
x The overall LO
P target for num
ber of active companies in A
ccelerator Partner P
rogram (row
135) decreased from 100 to 95.
x The overall LO
P target for num
ber of Ignite Action Fund recipients (row
138) decreased from 20 to 16.
x The overall LO
P target for num
ber of companies introducing new
mobility benefits (row
139) decreased from 50 to 30.
x The overall LO
P target for num
ber of unique visits to the website (row
140) decreased from 375,000 to 262,500.
x The overall LO
P target for number of new
owner’s gifts distributed (row
150) increased from 1,100 to 1,300.
x The overall LO
P target for num
ber of Level 2 AE
P M
UD
charging stations (row 176) increased from
60 to 90. x
The overall LOP
target for number of D
C Fast charging stations installed by A
EP
(row 176) decreased from
75 to 30.
x The overall LO
P target for num
ber of Level 2 publicly accessible charging stations installed by AE
P (row
185) increased from 90 to 190.
x The overall LO
P target for num
ber of Level 2 workplace charging station ports (row
194) increased from 250 to 275.
x The O
SU
fleet number of charging stations has been reduced from
50 to 15 due to grant budget reallocations and decentralized fleet m
atters as previously mentioned.
x The overall LO
P target for num
ber of people educated on Sm
art Colum
bus (row 209) w
as reduced from 4,500,000 to 1,788,150 based
on 1 quarter used for 2020. x
The majority of overall LO
P targets for the content generation for the playbook (row
s 212-213, 216-220) were reduced.
x The m
ajority of overall LOP
targets for the content dissemination for the playbook (row
s 224-236) were reduced.
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
82
Progress x
The Q6 estim
ate for the MW
h saved from C
olumbus D
OP
LED
street lights (row 43) has decreased from
235 MW
h saved to 122 MW
h saved due to a form
ula error. As a result, the G
HG
reductions for Priority 1 are now
slightly less for Q6.
x The Q
6 conversion to MTC
O2 for Initiative 2.2 (row
81) has decreased from 18 M
TCO
2 to 14 MTC
O2 due to a form
ula error.
x The Q
6 EV
market penetration and num
ber of EV
s purchased (rows 108 and 109) have been updated to actuals. A
s a result, the Priority
4 GH
G reduction increased for Q
6.
x The Q
6 number of E
xperience Center test drives conducted (row
129) was updated from
123 to 119 per actuals.
x The num
ber of Ignite Action Fund applications received (row
137) has increased from 9 to 10 for Q
5 and decreased from 10 to 0 in Q
6 due to reporting errors.
x The B
2B M
arketing initiatives (rows 147-149) as part of Initiative 4.3 have been disbanded due to budget reductions.
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
83
Targets
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ec2019Total
Project Goals
Result
Result
Result
Result
Result
Result
Result
Goal
Result
% G
HG
emission reductions from
baseline year0.15%
0.15%0.15%
0.11%0.16%
0.23%0.24%
1.23%1.19%
0.89%6.66%
8.76%
Total GH
G reductions/savings (M
TCO
2 )38,894
39,27439,863
29,44541,108
60,62661,039
317,460308,452
228,8981,720,987
2,264,895
Priority 1 - Decarbonization
Priority Indicators#1: M
W of renew
able energy capacity installed0.31
0.153.86
0.460.45
0.740.44
06.40
0905
905#2: M
Wh of renew
able energy consumed
11,84712,337
13,16711,473
32,01966,355
66,775281,520
213,974242,860
690,6201,215,000
#3: MW
h of energy saved (new renew
able energy or energy efficiency)57,000
57,02357,090
40,12240,122
40,12240,122
280,000331,601
160,00040,000
480,000Initiative 1.1: U
tility Scale Renew
ablesInitiative Indicators#1: R
enewable energy M
W capacity installed (S
trategies 1.1.1, 1.1.7)0.31
0.153.86
0.460.45
0.740.44
06.40
0905
905U
tility Scale W
ind Capacity Installed, M
W (AE
P) (S
trategy 1.1.1)0
00
00
00
00
0500
500U
tility Scale W
ind Energy G
enerated, MW
h (AEP
) (Strategy 1.1.1)
00
00
00
00
00
480,000480,000
Utility S
cale Solar C
apacity Installed, MW
(AEP
) (Strategy 1.1.1)
00
00
00
00
00
400400
Utility S
cale Solar E
nergy Generated, M
Wh (AE
P) (S
trategy 1.1.1)0
00
00
00
00
01,837,800
1,837,800C
apacity Installed for New
AEP
Distributed E
nergy Custom
ers, MW
(Strategy 1.1.3)
0.310.15
3.860.46
0.450.74
0.44-
6.40-
--
Colum
bus DO
P H
ydroelectric Capacity Installed, M
W (S
trategy 1.1.7, installed capacity)0
00
00
00
-0
05
5Potential G
HG
Reduction (M
TCO
2)0
00
00
00
00
01,307,233
1,307,233#2: R
enewable energy M
Wh consum
ed (Strategies 1.1.3, 1.1.4, 1.1.5, 1.1.6, 1.1.7)
11,84712,337
13,16711,473
32,01966,355
66,775281,520
200,119242,860
690,6201,215,000
MW
h (cumulative) for N
ew AE
P D
istributed Energy C
ustomers (S
trategy 1.1.3)43
156745
2,0963,608
5,2757,139
-5,275
--
-M
Wh of renew
able energy consumed through D
C S
olar mobile generators*, E
V charging ports, and lighting towers (S
trategy 1.1.4)0
68
822
2335
-35
--
-M
Wh of C
olumbus D
ivision of Pow
er Green P
ower sold (S
trategy 1.1.5)11,804
12,17612,414
9,36928,389
61,05659,601
281,520194,809
242,860675,620
1,200,000M
Wh from
City of C
olumbus W
astewater Treatm
ent Plant, C
o-Generation (S
trategy 1.1.6)0
00
00
00
00
-5,000
5,000M
Wh from
Colum
bus Division of P
ower H
ydroelectric Improvem
ents (Strategy 1.1.7, generated energy)
00
00
00
00
-
-10,000
10,000Potential G
HG
Reduction (M
TCO
2)6,682
6,9587,426
6,47118,059
37,42437,661
158,777120,681
136,972389,508
685,257Progress Indicators#1: N
o. of New
AEP
Distributed E
nergy Custom
ers (Strategy 1.1.3)
3521
6036
3631
73175
292100
25300
#2: Num
ber of Deploym
ents of mobile solar generators, E
V charging ports, and lighting towers (D
C S
olar) (Strategy 1.1.4)
022
00
024
039
460
039
Num
ber of mobile solar generators deployed* (S
trategy 1.1.4)0
10
00
10
02
00
0N
umber of E
V charging ports deployed (Strategy 1.1.4)
03
00
022
039
250
039
Num
ber of mobile solar lighting tow
ers deployed (Strategy 1.1.4)
018
00
01
00
190
00
#3: Colum
bus DO
P G
reen Pow
er sold as a percent of Total Pow
er sold (Strategy 1.1.5) (updated)
5.7%5.7%
5.3%4.3%
12.6%25.0%
27.5%25.0%
27.5%28.4%
29.0%29%
Initiative 1.2: Grid M
odernization and EfficiencyInitiative Indicators#3: C
ombined M
Wh saved from
strategies 1.2.1, 1.2.5, and 1.2.757,000
57,02357,090
40,12240,122
40,12240,122
280,000331,122
160,00040,000
480,000M
Wh saved from
AEP
Ohio E
nergy Efficiency P
articipation (Strategy 1.2.1)
57,00057,000
57,00040,000
40,00040,000
40,000280,000
331,000160,000
40,000480,000
MW
h saved from AE
P S
mart Lighting P
rogram (S
trategy 1.2.5)0
00
00
00
00
00
0M
Wh (cum
ulative) saved from C
olumbus D
OP
LED
street lights installed (Strategy 1.2.7)
023
90122
122122
122122
0Potential G
HG
Reduction (M
TCO
2)32,148
32,16132,199
22,62922,629
22,62922,629
157,919187,022
90,24022,560
270,719Progress Indicators#1: G
Wh saved as a result of energy efficiency efforts (S
trategy 1.2.1)57
5757
4040
4040
280331
16040
480#2a: AE
P AM
I meters installed (S
trategy 1.2.3)0
6,6003,400
72,86099,676
157,372128,288
400,000468,196
128,000528,000
#2b: AEP
Micro G
rids installed (Strategy 1.2.4)
00
00
00
00
01
1#3: AE
P S
mart Lighting P
rogram S
mart controller unit installed (S
trategy 1.2.5)0
00
00
00
00
-0
#4: Colum
bus Division of P
ower AM
I meters installed (S
trategy 1.2.6)0
00
00
00
00
10,00010,000
#5: Colum
bus Division of P
ower LE
D street lights installed (S
trategy 1.2.7)0
218628
2970
00
4,7001,143
4,5009,200
Potential GH
G R
eduction (MTC
O2)
00
0 Priority 1 Subtotal Potential G
HG
Reduction (M
TCO
2)38,830
39,11939,625
29,10040,688
60,05360,289
316,696307,703
227,2121,719,301
2,263,209
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
TAR
GETS
Year 3 (2019)2020
"Q12"
Year 1 (2017-2018)Q
1*Apr-Jun
Q2
Jul-SepQ
3O
ct-Dec
Q4
Jan-Mar
Q1-Q
7G
oalTotal
Q1-Q
7To D
ate
Year 2 (2018)LO
PTotal
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
84
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ec2019Total
Project Goals
Result
Result
Result
Result
Result
Result
Result
Goal
Result
Priority 2 - Fleet AdoptionPriority IndicatorsFleet E
lectric Vehicles P
urchased4
3100
3115
443
317200
4353
755Fleet E
lectric Vehicles P
laced In Operation
40
50
2329
101197
162445
113755
Initiative 2.1: Public FleetsInitiative IndicatorsN
o. of EVs purchased
33
9512
81
37182
15980
3265
No. of E
Vs placed in operation3
05
012
695
112121
8073
265C
ity of Colum
bus - EVs purchased
00
930
00
32170
12537 30
200C
ity of Colum
bus - EVs placed in operation
00
00
01
92100
93107 30
70200
The Ohio S
tate University - E
Vs purchased0
02
00
12
25
1315
The Ohio S
tate University - E
Vs placed in operation0
02
02
01
25
1315
City of D
ublin - EVs purchased
00
04
10
04
53
310
City of D
ublin - EVs placed in operation
00
00
50
04
53
310
Franklin County - E
Vs purchased3
30
50
00
011
1010
Franklin County - E
Vs placed in operation3
03
05
00
011
1010
Other G
overnment Fleets - E
Vs purchased0
00
37
03
613
2430
Other G
overnment Fleets - E
Vs placed in operation0
00
00
52
67
2430
Potential GH
G R
eduction (MTC
O2)
22
55
1115
6862
68107
148148
Progress Indicators#1: C
ontacts made w
ith other governments or institutions (S
trategy 2.1.1)16
3410
4060
10075
75335
40115
#2: Municipal governm
ents or institutions pledged to electrification (fleet analysis and vehicle acquisition plan) (Strategy 2.1.1)
00
56
52
315
215
20#3: C
ity of Colum
bus and public partner training sessions (Strategy 2.1.1)
13
11
43
25
154
9Initiative 2.2: Private FleetsInitiative IndicatorsN
o. of EVs purchased
10
59
73
695
31355
450N
o. of EVs placed in operation
10
00
1113
665
31345
40450
Potential GH
G R
eduction (MTC
O2)
11
11
714
1737
17231
253253
Progress Indicators0
#1: Private S
ector training sessions (Strategy 2.2.1)
01
10
11
17
54
11#2: E
stablish and distribute EV survey/assessm
ent document (S
trategy 2.2.1)50
1,3000
00
00
1,4501,350
-1,450
#3: New
private company pledged to electrification (S
trategy 2.2.1)0
07
66
611
4036
1555
#4: New
private fleet vehicles pledged to electrification (Strategy 2.2.1)
200
334
6325
75390
22060
450#5: C
ompleted vehicle analysis acquisition plan (S
trategy 2.2.2)5
55
43
319
2544
2045
Initiative 2.3: Transportation Service Providers (TSPs)Initiative IndicatorsN
o. of EVs purchased
00
010
00
040
100
40N
o. of EVs placed in operation
00
00
010
020
1020
40Potential G
HG
Reduction (M
TCO
2)0
00
00
66
116
2323
23Progress Indicators
0#1: N
umber of contacts m
ade with TS
Ps (S
trategy 2.3.1)0
03
57
2300
20317
1030
#2: TSP
s pledged to electrification (Strategy 2.3.1)
00
02
00
07
248
55 Priority 2 Subtotal Potential G
HG
Reduction (M
TCO
2)2
25
518
3491
11091
360424
424Priority 3 - Transit, Autonom
ous and Multi-M
odal Systems in the C
ityPriority IndicatorsTotal G
HG
reductions/savings from baseline year (M
TCO
2)0
00
00
00
0Progress Indicators#1: Autonom
ous Electric Vehicles D
eployed (US
DO
T)0
00
00
06
66
06
#2: Num
ber of platooning truck trips (US
DO
T)0
00
00
00
01,350
1,350#3: N
umber of electric bicycles deployed
00
00
06
06
644
50#4: B
ike infrastructure lane miles added
1.604.34
1.400.00
1.1010.00
4.5812
23.027
625
Priority 3 Subtotal Potential GH
G R
eduction (MTC
O2)
00
0
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
TAR
GETS
Year 3 (2019)2020
"Q12"
Year 1 (2017-2018)Q
1*Apr-Jun
Q2
Jul-SepQ
3O
ct-Dec
Q4
Jan-Mar
Q1-Q
7G
oalTotal
Q1-Q
7To D
ate
Year 2 (2018)LO
PTotal
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
85
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ec2019Total
Project Goals
Result
Result
Result
Result
Result
Result
Result
Goal
Result
Priority 4 - Consum
er Electric Vehicle AdoptionPriority Indicators#1: E
V M
arket Penetration (E
Vs purchased divided by total vehicles purchased)
0.44%0.60%
0.58%0.77%
0.52%0.97%
1.21%1.10%
1.21%1.80%
1.80%1.80%
#2: Estim
ated equivalent number of E
Vs purchased
115161
147190
134273
3121,359
13321,639
02,998
#3: Num
ber of Executives D
riving EV
s5
00
133
16
3036
155
50Initiative 4.1: R
esearch and Developm
entProgress Indicators#1: P
erceived Desirability, C
onsumer likelihood, C
onsumer perception to ow
n an EV (S
trategy 4.1.1)S
ee Appendix X of the Q7 R
eport for Consum
er Awareness S
urvey Findings0
0ALS
ALSALS
ALSInitiative 4.2: Increase C
onsumer Aw
areness for EVsProgress Indicators#1: Local P
romotion - N
umber of im
pressions at comm
unity events (Strategy 4.2.1)
00
00
453,155751,275
2001,000,000
1,204,6301,000,000
250,0002,250,000
#2: Local Prom
otion - Num
ber of giveaways distributed at com
munity events (S
trategy 4.2.1)0
00
01,502
5,60950
8,5007,161
10,00060,000
78,500#3: Local P
romotion - M
edia Relations - N
umber of Local M
edia Placem
ents (Strategy 4.2.2)
00
00
100132
7975
311300
12387
#4: Local Prom
otion - Media R
elations - Num
ber of Local Media Im
pressions (Strategy 4.2.2)
00
00
3,636,4486,670,698
4,807,6767,500,000
15,114,8229,000,000
1,250,00017,750,000
#5: Local Prom
otion - Num
ber of Social M
edia Followers (S
trategy 4.2.3)0
00
05,425
9561,377
3,0007,758
1,000500
4,500#6: Local P
romotion - N
umber of S
ocial Media Im
pressions (Strategy 4.2.3)
00
00
142,820618,878
1,090,41382,500
1,852,111500,000
31,250613,750
#7: Local Prom
otion - Num
ber of EV Assets w
ith Sm
art Colum
bus branding (Strategy 4.2.4)
00
00
930
0100
93100
12212
#8: Experience C
enter - Num
ber of Visitors (Strategy 4.2.5)
00
00
1,3552,720
2,0645,000
6,1395,000
5010,050
#9: Experience C
enter - Num
ber of EV S
pecific Events (S
trategy 4.2.5)0
00
05
55
415
101
15Initiative 4.3: D
rive Consum
er Consideration for EVs
Initiative Indicators#1: N
umber of D
ealer Sales Leads generated
00
00
397355
144TB
D896
700TB
DTB
DProgress Indicators#1: N
umber of E
xperience Center Test D
rives Conducted (S
ubstrategy 4.3.1.1)-
--
-0
119100
200219
20050
450#2: N
umber of R
ide and Drive R
oadshow E
vents Conducted (S
ubstrategy 4.3.1.2)-
-10
431
195
7069
500
120#3: N
umber of test drives conducted at the R
ide and Drive R
oadshow E
vents (Substrategy 4.3.1.2)
--
810369
3,6242,370
4747,800
7,6476,000
012,000
#4: Num
ber of attendees at Ride and D
rive Roadshow
Events (S
ubstrategy 4.3.1.2)-
-923
25,00034,714
30,00010,000
9,000100,637
11,0000
20,000#5: N
umber of D
ealer Sales Leads G
enerated from R
ide and Drive R
oadshow (S
ubstrategy 4.3.1.2)0
00
0397
353124
891874
7500
1,641#6: N
umber of extended test drives conducted (S
ubstrategy 4.3.1.3)0
00
00
00
150
00
15#7: Total N
umber (cum
ulative) of Active Com
panies in Accelerator Partner P
rogram (S
ubstrategy 4.3.2.1)4
4446
4545
4848
6548
950
95#8: Total N
umber (cum
ulative) of Com
panies with M
obility Ambassadors Identified (S
ubstrategy 4.3.2.2)0
00
034
3539
5039
600
60#9: N
umber of Ignite Action Fund Applications R
eceived (Substrategy 4.3.2.2)
00
00
100
315
1315
030
#10: Num
ber of Ignite Action Fund Recipients (S
ubstrategy 4.3.2.2)0
00
00
82
1010
60
16#11: N
umber of C
ompanies Introducing N
ew M
obility Benefits (S
ubstrategy 4.3.2.2)0
00
11
413
1019
200
30#12: W
ebsite - Num
ber of unique visits to Website (S
ubstrategy 4.3.3.1)0
2,026480
20114,002
6,98816,221
100,00039,918
125,00037,500
262,500#13: W
ebsite - Average time on W
ebsite (in minutes) (S
ubstrategy 4.3.3.1)0
00
02
22
22
22
2#14: W
ebsite - Num
ber of dealer referrals from W
ebsite (Substrategy 4.3.3.1)
00
00
03
20655
233,713
TBD
4,368#15: E
ducation Cam
paign - Num
ber of Education C
ampaign im
pressions (Substrategy 4.3.3.2)
00
00
00
1,646,4732,029,800
1,646,4738,502,200
TBD
10,532,000#16: E
ducation Cam
paign - Num
ber of Education C
ampaign engagem
ents (Substrategy 4.3.3.2)
00
00
00
214,447157,788
214,447894,132
TBD
1,051,920#17: E
ducation Cam
paign - Num
ber of Education C
ampaign w
ebsite referrals (Substrategy 4.3.3.2)
00
00
00
4,34212,725
4,34272,109
TBD
84,834#18: E
ducation Cam
paign - Num
ber of Education C
ampaign dealer leads (S
ubstrategy 4.3.3.2)0
00
00
09
6559
3,713TB
D4,368
#19: B2B
Marketing - N
umber of B
2B M
arketing impressions (S
ubstrategy 4.3.3.3)0
00
00
00
TBD
0TB
DTB
DTB
D#20: B
2B M
arketing - Num
ber of B2B
Marketing engagem
ents (Substrategy 4.3.3.3)
00
00
00
0TB
D0
TBD
TBD
TBD
#21: B2B
Marketing - N
umber of B
2B M
arketing Website referrals (S
ubstrategy 4.3.3.3)0
00
00
00
TBD
0TB
DTB
DTB
D#22: N
umber of N
ew O
wner's G
ifts Distributed (S
trategy 4.3.4)0
00
00
44187
450231
80050
1,300Initiative 4.4: Im
prove Consum
er Sales Experience of EVsInitiative Indicators#1: Total num
ber of EV m
odels available in the Colum
bus Market
-0
018
2323
2515
2523
2323
#2: Ratio of m
odels sold at dealerships in Colum
bus vs. models sold in the U
.S.
-0%
0%46%
58%58%
61%55%
61%65%
75%75%
#3: Ratio of dealerships selling B
EVs and/or P
HE
Vs vs. total operating dealerships in the Colum
bus area-
0%0%
51%54%
58%58%
60%58%
70%75%
75%#4: R
atio of OE
Ms supplying B
EVs and/or P
HE
Vs in Colum
bus vs. OE
Ms supplying m
odels in the U.S
.-
0%0%
85%100%
100%100%
80%100%
100%100%
100%Progress Indicators#1: Additional N
umber of D
ealers Actively Engaged (S
ubstrategy 4.4.2.1)7
13
63
20
1422
220
36#2: Additional N
umber of O
EM
s Actively Engaged (S
ubstrategy 4.4.2.1)2
20
12
10
98
31
13#3: N
umber of D
ealers Certified (S
ubstrategy 4.4.2.2)0
00
00
110
1611
15TB
D31
#4: Percentage of Total C
olumbus D
ealerships Certified (S
ubstrategy 4.4.2.2)0%
0%0%
0%0%
14%14%
17%14%
33%33%
33%#5: N
umber of Trainings C
onducted (Substrategy 4.4.2.3)
20
00
08
010
1050
TBD
62#6: N
umber of D
ifferent Dealers w
ith Trained Salespersons (S
ubstrategy 4.4.2.3)0
20
00
110
1213
15TB
D27
#7: Num
ber of negotiated group purchase rates (Strategy 4.4.3)
02
00
11
04
42
TBD
6#8: N
umber of B
EV and P
HE
V models eligible for group purchase rates (S
trategy 4.4.3)0
10
04
01
36
2TB
D5
Priority 4 Subtotal Potential GH
G R
eduction (MTC
O2)
65155
238345
420574
749764
7491,686
1,6861,686
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
TAR
GETS
Year 3 (2019)2020
"Q12"
Year 1 (2017-2018)Q
1*Apr-Jun
Q2
Jul-SepQ
3O
ct-Dec
Q4
Jan-Mar
Q1-Q
7G
oalTotal
Q1-Q
7To D
ate
Year 2 (2018)LO
PTotal
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
86
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ec2019Total
Project Goals
Result
Result
Result
Result
Result
Result
Result
Goal
Result
Priority 5 - Charging Infrastructure
Priority IndicatorsN
umber of electric charging station ports installed
6567
5724
81109
64368
467624
81,000
L139
00
00
00
7339
780
L226
6557
2081
10964
353422
6098
970D
C Fast
02
04
00
015
615
030
Initiative 5.1: Multi-U
nit Dw
elling (MU
D)
Initiative Indicators#1: N
umber of Level 2 P
MO
MU
D charging ports installed
00
00
20
2890 60
3030
90#2: N
umber of Level 2 AE
P O
hio MU
D charging stations installed
00
00
00
020
070
90Progress Indicators#1: N
umber of M
UD
developers contacted to install EV C
harging infrastructure (Strategy 5.1.1)
105
00
05
330
2315
45#2: N
umber of M
UD
developers who subm
itted application for MU
D rebates (S
trategy 5.1.1)3
02
00
02
127
618
#3: Num
ber of Level 2 PM
O M
UD
charging ports proposed in approved Site C
omm
itments/M
UD
Rebate approvals
00
4816
00
860
7230
90Initiative 5.2: Public Access C
hargingInitiative Indicators#1: Num
ber of Level 2 publicly accessible charging station ports installed – City of C
olumbus
77
00
46
030 25
2430
0 560
#2: Num
ber of DC
fast charging stations installed - AEP
00
00
00
015
015
30#3: Num
ber of Level 2 publicly accessible charging station ports installed – AEP0
70
00
06
3013
160190
Progress Indicators#1: N
umber of m
eetings with potential site hosts
316
13
135
2027
6118
45#2: N
umber of partnerships w
ith site hosts and secure comm
itments
06
00
02
1011
187
18Initiative 5.3: W
orkplace Charging
Initiative Indicators#1: N
umber of w
orkplaces offering EV charging
34
84
42
1045
3555
100#2: N
umber of w
orkplace charging ports installed49
4947
2424
1220
115225
160275
L139
00
00
00
039
00
L210
4747
2024
1220
115180
160275
DC
Fast0
20
40
00
06
00
Initiative 5.4: Fleet Charging Stations
Initiative IndicatorsN
umber of level 2 charging station ports installed for C
olumbus and other public fleets
94
100
5191
10103
175159
3265
City of C
olumbus
00
00
2470
896
102104
200The O
hio State U
niversity1
02
012
20
317
1215
City of D
ublin0
00
00
00
40
33
10Franklin C
ounty8
48
012
00
032
1010
Other G
overnment Fleets
00
00
319
20
2430
30Initiative 5.5: B
uilding and Zoning Changes to Support EV C
hargingProgress IndicatorsN
umber of S
ite plan test cases submitted for perm
it1
30
12
53
915
312
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
TAR
GETS
Year 3 (2019)2020
"Q12"
Year 1 (2017-2018)Q
1*Apr-Jun
Q2
Jul-SepQ
3O
ct-Dec
Q4
Jan-Mar
Q1-Q
7G
oalTotal
Q1-Q
7To D
ate
Year 2 (2018)LO
PTotal
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
87
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ec2019Total
Project Goals
Result
Result
Result
Result
Result
Result
Result
Goal
Result
PlaybookInitiative Indicators
Num
ber of people educated on Sm
art Colum
bus. Intent is to reach city officials, policy makers, business leaders and influencers.
00
00
157,688673,452
2,169,278631,200
3,000,418831,800
325,1501,788,150
B.2.1: C
ontent Generation
Progress Indicators#1: W
ebsite - Num
ber of asset downloads, video view
s, webcast view
s (B.2.1.3)
00
00
01,000
2,0691,250
3,0691,750
1,0004,000
#2: Website - N
umber of unique visitors outside the C
olumbus region (B
.2.1.3)0
00
06,001
4,0548,172
30,00018,227
70,00037,500
137,500#3: W
ebsite - Average minutes spent on site by visitors (B
.2.1.3) 0
00
01.53
2.452.38
22
22
2#4: W
ebsite - Num
ber of newsletter signups (B
.2.1.3) 0
00
00
147329
1,700476
1,0000
2,700#5: C
ontent - Num
ber of aggregated program archive docum
ents published (B.2.1.4)
00
00
012
6880
8075
12167
#6: Content - N
umber of learning tools created and published (B
.2.1.4)0
00
00
138
3939
4810
97#7: C
ontent - Num
ber of organic webinars hosted (B
.2.1.5)0
00
00
01
51
82
15#8: C
ontent - Num
ber of media w
ebinars sponsored (B.2.1.5)
00
00
04
61
102
14
#9: Content - N
umber of w
ebinar attendees (B.2.1.5)
00
00
0850
1,029300
1,879500
100900
B.2.2: C
ontent Dissem
inationProgress Indicators#1: E
-Book - Num
ber of city officials, policy makers, business leaders and influencers w
ho receive Playbook e-book distribution (B
.2.2.1)0
00
00
00
00
01,000
1,000#2: C
onferences - Num
ber of national or international speaking engagements on electrification at priority conferences (B
.2.2.2)0
00
07
52
614
32
11#3: C
onferences - Num
ber of estimated attendees at national or international speaking engagem
ents (B.2.2.2)
00
00
100650
5,040300
5,790300
501,100
#4: Media R
elations and PR
- Num
ber of trade media placem
ents on electrification (B.2.2.3)
00
00
14
1210
174
317
#5: Media R
elations and PR
- Num
ber of trade media im
pressions on electrification (B.2.2.3)
00
00
8,76748,873
175,388400,000
233,028160,000
125,000685,000
#6: Media R
elations and PR
- Num
ber of national media placem
ents on electrification (B.2.2.3)
00
00
00
31
32
14
#7: Media R
elations and PR
- Num
ber of national media im
pressions on electrification (B.2.2.3)
00
00
00
888,907250,000
888,907500,000
125,000875,000
#8: Social M
edia - Num
ber of impressions (B
.2.2.4)0
00
0142,820
618,8781,090,413
50,0001,852,111
100,00037,500
187,500#9: S
ocial Media - N
umber of click-throughs to the w
ebsite (B.2.2.4)
00
00
0818
3273,500
1,1455,000
1,87510,375
#10: Learning Exchanges - N
umber of significant events hosted by S
mart C
olumbus (B
.2.2.5)0
00
024
611
3241
164
52#11: Learning E
xchanges - Num
ber of conferences or speaking engagements presented by S
mart C
olumbus (B
.2.2.5)0
00
045
4629
120120
6020
200#12: Learning E
xchanges - Num
ber of conferences or speaking engagements by S
mart C
olumbus P
artners, as tracked/reported to SC
(B.2.2.5)
00
00
40
20
6TB
DTB
DTB
D#13: Learning E
xchanges - Num
ber of cities Sm
art Colum
bus has traveled to for learning and information exchange (B
.2.2.5)5
24
56
22
1826
105
33#14: Learning E
xchanges - Num
ber of meetings w
ith cities beyond seven county region (B.2.2.5)
00
00
162
2024
3812
339
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
TAR
GETS
Year 3 (2019)2020
"Q12"
Year 1 (2017-2018)Q
1*Apr-Jun
Q2
Jul-SepQ
3O
ct-Dec
Q4
Jan-Mar
Q1-Q
7G
oalTotal
Q1-Q
7To D
ate
Year 2 (2018)LO
PTotal
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
88
Progress
Q1*
Apr-Jun
Q2
Jul-Sep
Q3
Oct-
Dec
Q4
Jan-M
arTotal
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ecQ
5-Q7
Total
Project Goals
% G
HG
emission reductions from
baseline year0.15%
0.15%0.15%
0.11%0.57%
0.16%0.23%
0.24%0.63%
1.19%
Total GH
G reductions/savings (M
TCO
2)38,894
39,27439,863
29,445147,018
41,10860,626
61,039161,779
308,452
Priority 1 - Decarbonization
Priority Indicators#1: M
W of renew
able energy capacity installed0.31
0.153.86
0.464.77
0.450.74
0.441.63
6.40#2: M
Wh of renew
able energy consumed
11,84712,337
13,16711,473
47,88132,019
66,35566,775
154,344213,974
#3: MW
h of energy saved (new renew
able energy or energy efficiency)57,000
57,02357,090
40,122211,122
40,12240,122
40,122120,122
331,601Initiative 1.1: U
tility Scale Renew
ablesInitiative Indicators#1: R
enewable energy M
W capacity installed (S
trategies 1.1.1, 1.1.7)0.31
0.153.86
0.464.77
0.450.74
0.441.63
6.40U
tility Scale W
ind Capacity Installed, M
W (AE
P) (S
trategy 1.1.1)0
00
00
00
00
0U
tility Scale W
ind Energy G
enerated, MW
h (AEP
) (Strategy 1.1.1)
00
00
00
00
00
Utility S
cale Solar C
apacity Installed, MW
(AEP
) (Strategy 1.1.1)
00
00
00
00
00
Utility S
cale Solar E
nergy Generated, M
Wh (AE
P) (S
trategy 1.1.1)0
00
00
00
00
0C
apacity Installed for New
AEP
Distributed E
nergy Custom
ers, MW
(Strategy 1.1.3)
0.310.15
3.860.46
4.770.45
0.740.44
1.636.40
Colum
bus DO
P H
ydroelectric Capacity Installed, M
W (S
trategy 1.1.7, installed capacity)0
00
00
00
00
0 C
onversion to MTC
O2
00
00
00
00
00
#2: Renew
able energy MW
h consumed (S
trategies 1.1.3, 1.1.4, 1.1.5, 1.1.6, 1.1.7)11,847
12,33713,167
11,47347,881
32,01966,355
66,775154,344
200,119M
Wh (cum
ulative) for New
AEP
Distributed E
nergy Custom
ers (Strategy 1.1.3)
43156
7452,096
2,0963,608
5,2757,139
5,2755,275
MW
h of renewable energy consum
ed through DC
Solar m
obile generators*, EV charging ports, and lighting tow
ers (Strategy 1.1.4)
06
88
2222
2335
2335
MW
h of Colum
bus Division of P
ower G
reen Pow
er sold (Strategy 1.1.5)
11,80412,176
12,4149,369
45,76328,389
61,05659,601
149,046194,809
MW
h from C
ity of Colum
bus Wastew
ater Treatment P
lant, Co-G
eneration (Strategy 1.1.6)
00
00
00
00
00
MW
h from C
olumbus D
ivision of Pow
er Hydroelectric Im
provements (S
trategy 1.1.7, generated energy)0
00
00
00
00
0 C
onversion to MTC
O2
6,6826,958
7,4266,471
27,53718,059
37,42437,661
93,143120,681
Progress Indicators#1: N
o. of New
AEP
Distributed E
nergy Custom
ers (Strategy 1.1.3)
3521
6036
15236
3173
140292
#2: Num
ber of Deploym
ents of mobile solar generators, E
V charging ports, and lighting towers (D
C S
olar) (Strategy 1.1.4)
022
00
220
240
2446
Num
ber of mobile solar generators deployed* (S
trategy 1.1.4)0
10
01
01
01
2N
umber of E
V charging ports deployed (Strategy 1.1.4)
03
00
30
220
2225
Num
ber of mobile solar lighting tow
ers deployed (Strategy 1.1.4)
018
00
180
10
119
#3: Colum
bus DO
P G
reen Pow
er sold as a percent of Total Pow
er sold (Strategy 1.1.5) (updated)
5.7%5.7%
5.3%4.3%
12.6%25.0%
27.5%27.5%
27.5%Initiative 1.2: G
rid Modernization and Efficiency
Initiative Indicators#3: C
ombined M
Wh saved from
strategies 1.2.1, 1.2.5, and 1.2.757,000
57,02357,090
40,122211,122
40,12240,122
40,122120,122
331,122M
Wh saved from
AEP
Ohio E
nergy Efficiency P
articipation (Strategy 1.2.1)
57,00057,000
57,00040,000
211,00040,000
40,00040,000
120,000331,000
MW
h saved from AE
P S
mart Lighting P
rogram (S
trategy 1.2.5)0
00
00
00
00
0M
Wh (cum
ulative) saved from C
olumbus D
OP
LED
street lights installed (Strategy 1.2.7)
023
90122
122122
122122
122122
Conversion to M
TCO
232,148
32,16132,199
22,629119,136
22,62922,629
22,62967,886
187,022Progress Indicators#1: G
Wh saved as a result of energy efficiency efforts (S
trategy 1.2.1)57
5757
40211
4040
40120
331#2a: AE
P AM
I meters installed (S
trategy 1.2.3)0
6,6003,400
72,86082,860
99,676157,372
128,288385,336
468,196#2b: AE
P M
icro Grids installed (S
trategy 1.2.4)0
00
00
00
00
0#3: AE
P S
mart Lighting P
rogram S
mart controller unit installed (S
trategy 1.2.5)0
00
00
00
00
0#4: C
olumbus D
ivision of Pow
er AMI m
eters installed (Strategy 1.2.6)
00
00
00
00
00
#5: Colum
bus Division of P
ower LE
D street lights installed (S
trategy 1.2.7)0
218628
2971,143
00
00
1,143 C
onversion to MTC
O2
Priority 1 Subtotal GH
G R
eduction (MTC
O2)
38,83039,119
39,62529,100
146,67340,688
60,05360,289
161,030307,703
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
PRO
GR
ESSQ
1-Q7
Total
Year 2 (2018)Year 1 (2017-2018)
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
89
Q1*
Apr-Jun
Q2
Jul-Sep
Q3
Oct-
Dec
Q4
Jan-M
arTotal
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ecQ
5-Q7
Total
Project Goals
Priority 2 - Fleet AdoptionPriority IndicatorsFleet E
lectric Vehicles P
urchased4
3100
31138
154
4362
200Fleet E
lectric Vehicles P
laced In Operation
40
50
923
29101
153162
Initiative 2.1: Public FleetsInitiative IndicatorsN
o. of EVs purchased
33
9512
1138
137
46159
No. of E
Vs placed in operation3
05
08
126
95113
121C
ity of Colum
bus - EVs purchased
00
930
930
032
32125
City of C
olumbus - E
Vs placed in operation0
00
00
01
9293
93The O
hio State U
niversity - EVs purchased
00
20
20
12
35
The Ohio S
tate University - E
Vs placed in operation0
02
02
20
13
5C
ity of Dublin - E
Vs purchased0
00
44
10
01
5C
ity of Dublin - E
Vs placed in operation0
00
00
50
05
5Franklin C
ounty - EVs purchased
33
05
110
00
011
Franklin County - E
Vs placed in operation3
03
06
50
05
11O
ther Governm
ent Fleets - EVs purchased
00
03
37
03
1013
Other G
overnment Fleets - E
Vs placed in operation0
00
00
05
27
7 C
onversion to MTC
O2
22
55
511
1568
6868
Progress Indicators#1: C
ontacts made w
ith other governments or institutions (S
trategy 2.1.1)16
3410
40100
60100
75235
335#2: M
unicipal governments or institutions pledged to electrification (fleet analysis and vehicle acquisition plan) (S
trategy 2.1.1)0
05
611
52
310
21#3: C
ity of Colum
bus and public partner training sessions (Strategy 2.1.1)
13
11
64
32
915
Initiative 2.2: Private FleetsInitiative IndicatorsN
o. of EVs purchased
10
59
157
36
1631
No. of E
Vs placed in operation1
00
01
1113
630
31 C
onversion to MTC
O2
11
11
17
1417
1717
Progress Indicators#1: P
rivate Sector training sessions (S
trategy 2.2.1)0
11
02
11
13
5#2: E
stablish and distribute EV survey/assessm
ent document (S
trategy 2.2.1)50
1,3000
01,350
00
00
1,350#3: N
ew private com
pany pledged to electrification (Strategy 2.2.1)
00
76
136
611
2336
#4: New
private fleet vehicles pledged to electrification (Strategy 2.2.1)
200
334
5763
2575
163220
#5: Com
pleted vehicle analysis acquisition plan (Strategy 2.2.2)
55
54
193
319
2544
Initiative 2.3: Transportation Service Providers (TSPs)Initiative IndicatorsN
o. of EVs purchased
00
010
100
00
010
No. of E
Vs placed in operation0
00
00
010
010
10 C
onversion to GH
G (M
TCO
2)0
00
00
06
66
6Progress Indicators#1: N
umber of contacts m
ade with TS
Ps (S
trategy 2.3.1)0
03
58
72
300309
317#2: TS
Ps pledged to electrification (S
trategy 2.3.1)0
00
22
00
00
2 Priority 2 Subtotal G
HG
Reduction (M
TCO
2)2
25
55
1834
9191
91
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
PRO
GR
ESSQ
1-Q7
Total
Year 2 (2018)Year 1 (2017-2018)
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
90
Q1*
Apr-Jun
Q2
Jul-Sep
Q3
Oct-
Dec
Q4
Jan-M
arTotal
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ecQ
5-Q7
Total
Project Goals
Priority 3 - Transit, Autonomous and M
ulti-Modal System
s in the City
Priority IndicatorsTotal G
HG
reductions/savings from baseline year (M
TCO
2)0
00
Progress Indicators#1: Autonom
ous Electric Vehicles D
eployed (USD
OT)
00
00
00
06
66
#2: Number of platooning truck trips (US
DO
T)0
00
00
00
00
0#3: Num
ber of electric bicycles deployed0
00
00
06
06
6#4: B
ike infrastructure lane miles added
1.604.34
1.400.00
7.341.10
10.004.58
15.6823.02
Priority 3 Subtotal GH
G R
eduction (MTC
O2)
00
00
00
00
00
Priority 4 - Consum
er Electric Vehicle AdoptionPriority Indicators#1: E
V M
arket Penetration (E
Vs purchased divided by total vehicles purchased)
0.44%0.60%
0.58%0.77%
0.77%0.52%
0.97%1.21%
1.21%1.21%
#2: Estim
ated equivalent number of E
Vs purchased
115161
147190
613134
273312
7191,332
#3: Num
ber of Executives D
riving EV
s5
26
1326
31
610
36Initiative 4.1: R
esearch and Developm
entProgress Indicators#1: P
erceived Desirability, C
onsumer likelihood, C
onsumer perception to ow
n an EV (S
trategy 4.1.1)Initiative 4.2: Increase C
onsumer Aw
areness for EVsProgress Indicators#1: Local P
romotion - Num
ber of impressions at com
munity events (S
trategy 4.2.1)453,155
751,275200
1,204,630
1,204,630#2: Local P
romotion - Num
ber of giveaways distributed at com
munity events (S
trategy 4.2.1)1,502
5,60950
71617,161
#3: Local Prom
otion - Media R
elations - Number of Local M
edia Placem
ents (Strategy 4.2.2)
100132
79311
311#4: Local P
romotion - M
edia Relations - Num
ber of Local Media Im
pressions (Strategy 4.2.2)
3,636,4486,670,698
4,807,67615,114,822
15,114,822#5: Local P
romotion - Num
ber of Social M
edia Followers (S
trategy 4.2.3)5,425
9561,377
7,7587,758
#6: Local Prom
otion - Number of S
ocial Media Im
pressions (Strategy 4.2.3)
142,820618,878
1,090,4131,852,111
1,852,111#7: Local P
romotion - Num
ber of EV Assets w
ith Sm
art Colum
bus branding (Strategy 4.2.4)
930
093
93#8: E
xperience Center - Num
ber of Visitors (Strategy 4.2.5)
1,3552,720
2,0646,139
6,139#9: E
xperience Center - Num
ber of EV S
pecific Events (S
trategy 4.2.5)5
55
1515
See Appendix X of the Q
7 Report for C
onsumer Aw
areness Survey Findings
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
PRO
GR
ESSQ
1-Q7
Total
Year 2 (2018)Year 1 (2017-2018)
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
91
Q1*
Apr-Jun
Q2
Jul-Sep
Q3
Oct-
Dec
Q4
Jan-M
arTotal
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ecQ
5-Q7
Total
Project Goals
Initiative 4.3: Drive C
onsumer C
onsideration for EVsInitiative Indicators#1: N
umber of D
ealer Sales Leads generated
397355
144896
896Progress Indicators#1: N
umber of E
xperience Center Test D
rives Conducted (S
ubstrategy 4.3.1.1)-
--
-0
119100
219219
#2: Num
ber of Ride and D
rive Roadshow
Events C
onducted (Substrategy 4.3.1.2)
--
104
1431
195
5569
#3: Num
ber of test drives conducted at the Ride and D
rive Roadshow
Events (S
ubstrategy 4.3.1.2)-
-810
3691,179
3,6242,370
4746,468
7,647#4: N
umber of attendees at R
ide and Drive R
oadshow E
vents (Substrategy 4.3.1.2)
--
92325,000
25,92334,714
30,00010,000
74,714100,637
#5: Num
ber of Dealer S
ales Leads Generated from
Ride and D
rive Roadshow
(Substrategy 4.3.1.2)
397353
124874
874#6: N
umber of extended test drives conducted (S
ubstrategy 4.3.1.3)0
00
00
#7: Total Num
ber (cumulative) of Active C
ompanies in Accelerator P
artner Program
(Substrategy 4.3.2.1)
444
4645
4548
4848
48#8: Total N
umber (cum
ulative) of Com
panies with M
obility Ambassadors Identified (S
ubstrategy 4.3.2.2)34
3539
3539
#9: Num
ber of Ignite Action Fund Applications Received (S
ubstrategy 4.3.2.2)10
03
1313
#10: Num
ber of Ignite Action Fund Recipients (S
ubstrategy 4.3.2.2)0
82
1010
#11: Num
ber of Com
panies Introducing New
Mobility B
enefits (Substrategy 4.3.2.2)
11
14
1318
19#12: W
ebsite - Num
ber of unique visits to Website (S
ubstrategy 4.3.3.1)0
2,026480
2012,707
14,0026,988
16,22137,211
39,918#13: W
ebsite - Average time on W
ebsite (in minutes) (S
ubstrategy 4.3.3.1)1.53
2.452.38
2.452.45
#14: Website - N
umber of dealer referrals from
Website (S
ubstrategy 4.3.3.1)0
320
2323
#15: Education C
ampaign - N
umber of E
ducation Cam
paign impressions (S
ubstrategy 4.3.3.2)0
01,646,473
1,646,4731,646,473
#16: Education C
ampaign - N
umber of E
ducation Cam
paign engagements (S
ubstrategy 4.3.3.2)0
0214,447
214447214,447
#17: Education C
ampaign - N
umber of E
ducation Cam
paign website referrals (S
ubstrategy 4.3.3.2)0
04,342
43424,342
#18: Education C
ampaign - N
umber of E
ducation Cam
paign dealer leads (Substrategy 4.3.3.2)
00
99
9#19: B
2B M
arketing - Num
ber of B2B
Marketing im
pressions (Substrategy 4.3.3.3)
00
00
0#20: B
2B M
arketing - Num
ber of B2B
Marketing engagem
ents (Substrategy 4.3.3.3)
00
00
0#21: B
2B M
arketing - Num
ber of B2B
Marketing W
ebsite referrals (Substrategy 4.3.3.3)
00
00
0#22: N
umber of N
ew O
wner's G
ifts Distributed (S
trategy 4.3.4)0
44187
231231
Initiative 4.4: Improve C
onsumer Sales Experience of EVs
Initiative Indicators#1: Total num
ber of EV m
odels available in the Colum
bus Market
-18
1823
2325
2525
#2: Ratio of m
odels sold at dealerships in Colum
bus vs. models sold in the U
.S.
-46%
46%58%
58%61%
58%61%
#3: Ratio of dealerships selling B
EVs and/or P
HE
Vs vs. total operating dealerships in the Colum
bus area-
51%51%
54%58%
58%58%
58%#4: R
atio of OE
Ms supplying B
EVs and/or P
HE
Vs in Colum
bus vs. OE
Ms supplying m
odels in the U.S
.-
85%85%
100%100%
100%100%
100%Progress Indicators#1: Additional N
umber of D
ealers Actively Engaged (S
ubstrategy 4.4.2.1)7
13
617
32
05
22#2: Additional N
umber of O
EM
s Actively Engaged (S
ubstrategy 4.4.2.1)2
20
15
21
03
8#3: N
umber of D
ealers Certified (S
ubstrategy 4.4.2.2)0
110
1111
#4: Percentage of Total C
olumbus D
ealerships Certified (S
ubstrategy 4.4.2.2)0
13.92%13.92%
13.92%13.92%
#5: Num
ber of Trainings Conducted (S
ubstrategy 4.4.2.3)2
00
02
08
08
10#6: N
umber of D
ifferent Dealers w
ith Trained Salespersons (S
ubstrategy 4.4.2.3)0
20
02
011
011
13#7: N
umber of negotiated group purchase rates (S
trategy 4.4.3)0
20
02
11
02
4#8: N
umber of B
EV and P
HE
V models eligible for group purchase rates (S
trategy 4.4.3)0
10
01
40
15
6 Priority 4 Subtotal G
HG
Reduction (M
TCO
2)65
155238
345345
420574
749749
749
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
PRO
GR
ESSQ
1-Q7
Total
Year 2 (2018)Year 1 (2017-2018)
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
92
Q1*
Apr-Jun
Q2
Jul-Sep
Q3
Oct-
Dec
Q4
Jan-M
arTotal
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ecQ
5-Q7
Total
Project Goals
Priority 5 - Charging Infrastructure
Priority IndicatorsN
umber of electric charging station ports installed
6567
5724
21381
10964
254467
L139
00
039
00
00
39L2
2665
5720
16881
10964
254422
DC
Fast0
20
46
00
00
6Initiative 5.1: M
ulti-Unit D
welling (M
UD
)Initiative Indicators#1: N
umber of Level 2 P
MO
MU
D charging ports installed
00
00
02
028
3030
#2: Num
ber of Level 2 AEP
Ohio M
UD
charging stations installed0
00
00
00
00
0Progress Indicators#1: N
umber of M
UD
developers contacted to install EV C
harging infrastructure (Strategy 5.1.1)
105
00
150
53
823
#2: Num
ber of MU
D developers w
ho submitted application for M
UD
rebates (Strategy 5.1.1)
30
20
50
02
27
#3: Num
ber of Level 2 PM
O M
UD
charging ports proposed in approved Site C
omm
itments/M
UD
Rebate approvals
00
4816
640
08
872
Initiative 5.2: Public Access Charging
Initiative Indicators#1: Num
ber of Level 2 publicly accessible charging station ports installed – City of C
olumbus
77
00
144
60
1024
#2: Num
ber of DC
fast charging stations installed - AEP
00
00
00
00
00
#3: Number of Level 2 publicly accessible charging station ports installed – AEP
07
00
70
06
613
Progress Indicators#1: N
umber of m
eetings with potential site hosts
316
13
2313
520
3861
#2: Num
ber of partnerships with site hosts and secure com
mitm
ents 0
60
06
02
1012
18Initiative 5.3: W
orkplace Charging
Initiative Indicators#1: N
umber of w
orkplaces offering EV charging
34
84
194
210
1635
#2: Num
ber of workplace charging ports installed
4949
4724
16924
1220
56225
L139
00
039
00
00
39L2
1047
4720
12424
1220
56180
DC
Fast0
20
46
00
00
6Initiative 5.4: Fleet C
harging StationsInitiative IndicatorsN
umber of level 2 charging station ports installed for C
olumbus and other public fleets
94
100
2351
9110
152175
City of C
olumbus
00
00
024
708
102102
The Ohio S
tate University
10
20
312
20
1417
City of D
ublin0
00
00
00
00
0Franklin C
ounty8
48
020
120
012
32O
ther Governm
ent Fleets0
00
00
319
224
24Initiative 5.5: B
uilding and Zoning Changes to Support EV C
hargingProgress IndicatorsN
umber of S
ite plan test cases submitted for perm
it1
30
15
25
310
15
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
PRO
GR
ESSQ
1-Q7
Total
Year 2 (2018)Year 1 (2017-2018)
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
93
Q1*
Apr-Jun
Q2
Jul-Sep
Q3
Oct-
Dec
Q4
Jan-M
arTotal
Q5
Apr-JunQ
6Jul-Sep
Q7
Oct-D
ecQ
5-Q7
Total
Project Goals
PlaybookInitiative Indicators
Num
ber of people educated on Sm
art Colum
bus. Intent is to reach city officials, policy makers, business leaders and influencers.
0157,688
673,4522,169,278
3,000,4183,000,418
B.2.1: C
ontent Generation
Progress Indicators#1: W
ebsite - Number of asset dow
nloads, video views, w
ebcast views (B
.2.1.3)0
01,000
2,0693,069
3,069#2: W
ebsite - Number of unique visitors outside the C
olumbus region (B
.2.1.3)0
6,0014,054
8,17218,227
18,227#3: W
ebsite - Average minutes spent on site by visitors (B
.2.1.3) 0
1.532.45
2.382.45
2.45#4: W
ebsite - Number of new
sletter signups (B.2.1.3)
00
147329
476476
#5: Content - Num
ber of aggregated program archive docum
ents published (B.2.1.4)
00
1268
8080
#6: Content - Num
ber of learning tools created and published (B.2.1.4)
00
138
3939
#7: Content - Num
ber of organic webinars hosted (B
.2.1.5)0
00
11
1#8: C
ontent - Number of m
edia webinars sponsored (B
.2.1.5)0
04
610
10#9: C
ontent - Number of w
ebinar attendees (B.2.1.5)
00
8501,029
1,8791,879
B.2.2: C
ontent Dissem
inationProgress Indicators#1: E
-Book - Number of city officials, policy m
akers, business leaders and influencers who receive P
laybook e-book distribution (B.2.2.1)
00
00
00
#2: Conferences - Num
ber of national or international speaking engagements on electrification at priority conferences (B
.2.2.2)0
75
214
14#3: C
onferences - Number of estim
ated attendees at national or international speaking engagements (B
.2.2.2)0
100650
5,0405,790
5,790#4: M
edia Relations and P
R - Num
ber of trade media placem
ents on electrification (B.2.2.3)
01
412
1717
#5: Media R
elations and PR
- Number of trade m
edia impressions on electrification (B
.2.2.3)0
8,76748,873
175,388233,028
233,028#6: M
edia Relations and P
R - Num
ber of national media placem
ents on electrification (B.2.2.3)
00
03
33
#7: Media R
elations and PR
- Number of national m
edia impressions on electrification (B
.2.2.3)0
00
888,907888,907
888,907#8: S
ocial Media - Num
ber of impressions (B
.2.2.4)0
142,820618,878
1,090,4131,852,111
1,852,111#9: S
ocial Media - Num
ber of click-throughs to the website (B
.2.2.4)0
0818
3271,145
1,145#10: Learning E
xchanges - Number of significant events hosted by S
mart C
olumbus (B
.2.2.5)0
246
1141
41#11: Learning E
xchanges - Number of conferences or speaking engagem
ents presented by Sm
art Colum
bus (B.2.2.5)
045
4629
120120
#12: Learning Exchanges - Num
ber of conferences or speaking engagements by S
mart C
olumbus P
artners, as tracked/reported to SC
(B.2.2.5)
04
02
66
#13: Learning Exchanges - Num
ber of cities Sm
art Colum
bus has traveled to for learning and information exchange (B
.2.2.5)5
24
516
62
210
26#14: Learning E
xchanges - Number of m
eetings with cities beyond seven county region (B
.2.2.5)0
162
2038
38
QUA
RTER
LY INDIC
ATO
RS A
ND M
ETRIC
PRO
GR
ESSQ
1-Q7
Total
Year 2 (2018)Year 1 (2017-2018)
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
94
APPEN
DIX B
– SCH
EDU
LE S
napshots of each of the priorities are located below. S
ee the Sm
art Colum
bus Q7 S
chedule Update.pdf for the full schedule.
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
95
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
96
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
97
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
98
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
99
APPEN
DIX C
– RISK
AN
D PO
LICY R
EGISTER
R
isk is an uncertain event or condition that, if it occurs, has a positive (opportunity) or negative (threat) effect on a project’s objectives. The Risk
Register is used to identify, rate, rank and m
itigate risks prior to the start of a project. It assists the team by focusing attention on higher ranking
items requiring m
ore analysis and mitigation strategies. The R
isk Register is a living docum
ent to be updated on a periodic basis and reviewed
during the Monthly P
roject Review
meeting. S
ee the Q6 R
isk and Policy R
egister.xlsx spreadsheet in addition to the snapshots included.
Risk Term
inology
DEFIN
ITION
EXA
MPLES
Risk: A
n uncertain event or condition that, if it occurs, has a positive or negative effect on one or m
ore project objectives. 1
Risk A
cceptance: A risk response strategy w
hereby the project team decides
to acknowledge the risk and not take any action unless the risk occurs. 1
A potential change is design standards; reacting w
hen and if it is incorporated into the project objectives.
Risk A
voidance: A risk response strategy w
hereby the project team acts to
eliminate the threat or protect the project from
the risk impact. 1
Usually involves change the project plan to elim
inate the threat entirely. C
ould include extending the schedule; reducing scope, changing the strategy or approach. 1
Risk M
itigation: A risk response whereby the project team
acts to reduce the probability of occurrence or im
pact of a risk. 1
Taking early actions such as conducting workshops, partnering, draft
reviews, and other pre-em
ptive or non-conventional activities to lower the
likelihood of occurrence R
isk Transference: A risk response strategy w
hereby the project team shifts
the impact of a threat to a third party, together w
ith the ownership of the
response. 1
When a C
ontractor has capabilities that the A/E
does not possess, transferring scope and responsibility contractually to the C
ontractor.
Risk Exploitation: A
(opportunity) risk response strategy whereby the project
team seeks to elim
inate the uncertainty associated with an upside risk by
ensuring the opportunity definitely happens. 1
Assigning an organization’s most talented resources to reduce the tim
e to com
pletion or using new technologies or technology upgrades to reduce
cost and duration required to realize project objectives. 1
Risk Sharing: A
(opportunity) risk response strategy whereby the project
team seek allocate som
e or all of the ownership of the opportunity to a third
party who is best able to capture the opportunity for the benefit of the project. 1
Forming risk sharing partnerships, team
s, special-purpose companies, or
joint ventures, which can be established w
ith the express purpose of taking advantage of the opportunity so that all parties gain from
their actions. 1
Risk Enhancem
ent: A (opportunity) risk response strategy w
hereby the project team
seeks to increase the probability and/or the positive impacts of an
opportunity. 1 A
dding more resources to an activity to finish early. 1
1. Project M
anagement Institute. A
Guide to the P
roject Managem
ent Body of K
nowledge (P
MB
OK
® G
uide) – Fifth Edition
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
100
Priority 1 – Decarbonization
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
101
Priority 2 – Fleet Electric Vehicle Adoption
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
102
Priority 4 – Consum
er Electric Vehicle Adoption
SM
AR
T CO
LUM
BU
S E
LEC
TRIFIC
ATIO
N P
RO
GR
AM
Q
UA
RTE
R 7 A
CTIV
ITY R
EP
OR
T: OC
T – DE
C 2018
103
Priority 5 – Charging Infrastructure
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
104
APPENDIX D – POLK DATA IHS Markit (Polk) data is listed below through program Q6 (Q3 2018). Due to the report timing, Polk data will only available through November 2018. For consistency, this data will continue to be provided one quarter behind the report.
TIMEFRAME EV PHEV TOTAL (EV+PHEV) TOTAL SALES %
Jan 2017 21 18 39 7,280 0.54%
Feb 2017 14 15 29 8,790 0.33%
Mar 2017 24 23 47 10,030 0.47%
2017 Q1 Total 59 56 115 26,100 0.44%
Apr 2017 19 13 32 8,631 0.37%
May 2017 32 20 52 9,693 0.54%
Jun 2017 42 35 77 8,585 0.90%
2017 Q2 Total 93 68 161 26,909 0.60%
Jul 2017 32 26 58 8,254 0.70%
Aug 2017 18 20 38 9,026 0.42%
Sep 2017 27 24 51 8,125 0.63%
2017 Q3 Total 77 70 147 25,405 0.58%
Oct 2017 44 19 66 8,005 0.79%
Nov 2017 18 28 46 8,097 0.57%
Dec 2017 49 32 81 8,540 0.95%
2017 Q4 Total 111 79 190 24,642 0.77%
Jan 2018 13 23 36 7,243 0.50%
Feb 2018 15 23 38 8,385 0.45%
Mar 2018 27 33 60 10,215 0.59%
2018 Q1 Total 55 79 134 25,843 0.52%
Apr 2018 54 19 73 9,028 0.81%
May 2018 56 35 91 10,422 0.87%
June 2018 70 39 109 8,683 1.26%
2018 Q2 Total 180 93 273 28,133 0.97%
SMART COLUMBUS ELECTRIFICATION PROGRAM QUARTER 7 ACTIVITY REPORT: OCT – DEC 2018
105
TIMEFRAME EV PHEV TOTAL (EV+PHEV) TOTAL SALES %
Jul 2018 69 32 101 9,197 1.10%
Aug 2018 69 34 103 8,578 1.20%
Sep 2018 77 31 108 8,018 1.35%
2018 Q3 Total 215 97 312 25,793 1.21%
Oct 2018 172 34 206 8,232 2.50%
Nov 2018 112 36 148 7,371 2.01%
Dec 2018 - - - - -
2018 Q4 Total* 284 70 354 15,603 2.27% *Does not include December 2018. This information is reported one quarter behind.