SmartPlant Instrumentation Roadmap - Houston SPI …spi-ltuf.org/20160809/HxGN 2016 - SPI...

Post on 16-May-2018

280 views 0 download

transcript

SmartPlant Instrumentation Roadmap

Guy Masin, SmartPlant Instrumentation (SPI) Product owner June, 2016

Confidential 3

1. SPI 2016 – Released April 2016 a) SPI 2016 in review b) Top 5 reasons to upgrade

2. SPI 2016 SP1 – Scheduled 4Q2016 a) Improving the look and feel b) Improving the Performance

3. SPI 2018 a) Infomaker replacement – Phase 2

Agenda

SmartPlant Instrumentation 2016

Release April 2016

Confidential 5

SPI 2016 Release Objectives

Increasing SPI’s End-User usability:

Transfer and overhaul of the Project/Ab-Built module from the administration module to SPI

(increasing SPI’s license consumption as well).

Overhauling the Integration To-Do List UI.

Overhauling large SR containing areas.

Having a full Upgrade path from previous releases.

Starting Conversion from PB to .NET

5

Confidential 6

297.42 284.26 332

693

307

996

0

0.5

1

1.5

2

2.5

3

3.5

0

200

400

600

800

1000

1200

SPI 2009 SPI 2013 SPI 2016

SRs per Release

SRs/Y SRs Total Duration (Y)

2.33 (28mon)

1.08 (13mon)

3 (36mon)

* SRs/Y – Total Number of SRs solved during the release - normalized per the duration

Supporting our customers

Confidential 7

Supporting our customers – Cont.

7

0

20

40

60

80

100

120

140

Resolved SRs per Release and Product Keywords

SPI 2009 SPI 2013 SPI 2016

325

125 112

QB + EDE TDL

P/AB

SmartPlant Instrumentation 2016 - Review

Release April 2016

Confidential 9

Engineering Data Editor - Expression

Exp.

The Expression command in the EDE Action pane. Create your

Expression column

Confidential 11

Query Builder (QB)

Sort

Item Properties Relationship definition Type

Selection

EDE Columns

- Engineering Data Access for Engineers/Designers - Configure EDE for your Task - Reporting on Data

Confidential 12

Engineering Data Editor (EDE) - Configured for your Task - Easy data Adding/Modifying/Deleting/Sorting - Report Creation - Compare Data

Confidential 13

Delivered Queries • SPI 2016 will contain delivered queries based on the previous available browsers. • These Queries will be accessible in QBF format from the installation folder as well.

Installation Folder

Reference Explorer

Confidential 14

Enhanced To-Do List (TDL) – Cont.

Yellow - Create

Green - Update

Color Coded

Layout Access Control

Color coded P&ID

Compare retrieved

properties Vs Current

SPI Data

- Access to Related Documents (P&ID) - Color Coding of Tasks - Using the same EDE interface users experience

Confidential 15

Project To-Do List (pTDL)

Scoped items – Tree/Hierarchy View

Connection Graphic Representation

Domain Explorer

Scoped items – Grid View

- Graphical Scope View - Color Coded tasks - Easier to manage the Shared Data

Confidential 16

• Improve visibility of the scoped when claiming or merging • Part of SPI (not Admin) to get most of SPI tasks benefits as reports like ESL etc… • Improve the robustness of supported workflows

• Harmonize the process with the below operations

• Claim • Merge

• Remove the constraint of multi users operations when data is claimed or merged • Predictability

Recommending to view the following Webinar http://forms.intergraph.com/20150415-PPM-Efficiently-Managing-Project-SmartPlant-Instrumentation

Project Management – Business Value

SmartPlant Instrumentation 2016 SP1

Release schedule for Q4 2016

Confidential 18

SPI 2016 SP1 - Objectives

18

Updating SPI’s User Experience

Control search criteria

Improving the EDE Performance

Wrap text

page size

Updating SPI Explorers

New Quick Search

Better control the EDE layout

SmartPlant Instrumentation – Next Major Release

Confidential 20

SPI – What coming next

SPI on the Smart Enterprise Portal (SEP) – SmartPlant Explorer Replacement

SPI is moving to the Cloud

Infomaker replacement – 2nd phase (First Phase was to replace the customer browsers – Query Builder)

Confidential 21

SPI on LinkedIn

Attached are the May stats for the TUF LinkedIn groups. • Total members: 26,471 (26,006 in April) • Total clients: 24,294(23,867 in April) • Most members in total: SmartPlant Instrumentation: 4,647 • Most client members: SmartPlant Instrumentation: 4,503 • Biggest increase since last month: Intergraph Smart 3D with 74 new members

4,300

4,415

4,505

4,603 4,647

Jan. Feb. Mar. Apr. May

SmartPlant Instrumentation

Confidential 22

This course is designed for current users of SmartPlant Instrumentation who are upgrading from previous versions of the software to SmartPlant Instrumentation version 2016. This course will review new functions and workflows through lecture and practical exercises. This class is primarily focused on changes in administration and engineering modules, and offers a limited overview of the changes to the Wiring and Loop modules. Topics Covered: Overview of all changes in the Administration module Query Builder/Engineering Data Editor (replaces browsers) Project Management Prerequisites: Practical experience with SmartPlant Instrumentation Basic industry knowledge in instrumentation Familiarity with Microsoft Windows applications

SmartPlant Instrumentation 2016 Delta - TINT1005 Houston Intergraph Office July 29-21

Thank You